ML18206A552
| ML18206A552 | |
| Person / Time | |
|---|---|
| Site: | Consolidated Interim Storage Facility |
| Issue date: | 07/19/2018 |
| From: | Consolidated Interim Storage Facility |
| To: | Division of Spent Fuel Management |
| Shared Package | |
| ML18206A595 | List:
|
| References | |
| E-52247 | |
| Download: ML18206A552 (27) | |
Text
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-66 Figure 2-14 Geologic Atlas of Texas, Hobbs Sheet (7 Pages)
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-67 Figure 2-14 Geologic Atlas of Texas, Hobbs Sheet (7 Pages)
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-68 Figure 2-14 Geologic Atlas of Texas, Hobbs Sheet (7 Pages)
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-69 Figure 2-14 Geologic Atlas of Texas, Hobbs Sheet (7 Pages)
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-70 Figure 2-14 Geologic Atlas of Texas, Hobbs Sheet (7 Pages)
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-71 Figure 2-14 Geologic Atlas of Texas, Hobbs Sheet (7 Pages)
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-72 Figure 2-15 Boring Locations in the Vicinity of the WCS CISF
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-73 Figure 2-16 WCS CISF Cross Section West-East
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-74 Figure 2-17 WCS CISF Cross Section South-North
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-75 Figure 2-18 Texas Regional Seismicity 1973 to January 31, 2015
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-76 Figure 2-19 Present Population Distribution within 5 Miles of the WCS CISF
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-77 Figure 2-20 Projected Population Distribution within 5 Miles of the WCS CISF
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-78 Figure 2-21 Tower 1 Located South of the Waste Control Specialists Guard House
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-79 Figure 2-22 ER Tower Located on the North Side of the Waste Control Specialists Federal Waste Facility
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-80 Figure 2-23 WeatherHawk East Located on the East Side of the Permitted Area for Waste Control Specialists (North of the Rail Loop)
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-81 Figure 2-24 WeatherHawk West Located West of the Waste Control Specialists LSA Pad Next to State Line Road
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-82 Figure 2-25 Project Location-Road Base
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-83 Figure 2-26 CJI C-1 Cross Section Layout
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-84 Figure 2-27 CJI C-2 Collection Ditches A &B Cross Section
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-85 Figure 2-28 CJI C-3 Collection Ditch A Plan & Profile
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-86 Figure 2-29 CJI C-4 Collection Ditch B Plan & Profile STA. 0+00 - STA. 12+25
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-87 Figure 2-30 CJI C-5 Collection Ditch B Plan & Profile STA. 12+25 - STA 23+74.12
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-88 Figure 2-31 CJI C-6 Cross Section A-A STA. 0+00 - STA. 19+00
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-89 Figure 2-32 CJI C-7 Cross Section A-A STA. 19+00 - STA. 38+39
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-90 Figure 2-33 CJI C-8 Cross Section B-B STA. 0+00 - STA.25+25
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-91 Figure 2-34 CJI C9 Cross Section C-C
WCS Consolidated Interim Storage Facility Safety Analysis Report Revision 2 Page 2-92 Figure 2-35 Developed Drainage Area Map