ML18193A955
| ML18193A955 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/19/1976 |
| From: | Arizona Nuclear Power Project |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| 2.5-43a | |
| Download: ML18193A955 (1) | |
Text
UNIT I BORING LOCATIONS UNIT Z BORING LOCATIONS UNIT 9 BORING LOCATIONS
'I I/Qe SPRAY PoND N
WATER STORAGE BVILDIN6 ece TURBINE BVIIDIRC CONTAINAIENT dVIIDIN6 FUEL 6 II/LDIN6 CCW/TROL dVILDING BUILDING 8
dt AVKILIARV
~ BUILDING Qs R4DWASTE A'e Oa DIESEL GENERATOR BVILDING EXPLAIVATIOIV ENGINEERING DURING e
PIEZOMETER BORING
~ BACKHOE TREAICH
SEISMIC SURVEY LINE p/a BORING USED IN CROSS SECTION DEVELOPMENT, FIGURE 2.5-45
)~Tt/t/-c 0
PVARP TEST dYELL 1TO-I k
PVhtP TEST OOSEIiVATION t/YELL i70LBI Lian//FACTIDA'ORIAfd
/c..
N CONTAIA/MENI BUILDIAI6
'L/dad/4C Tldd
'TREAC'H I, 4VIIILIARY BVILDIA/d gl'4 CON TROL BUILDINd FUEL BIIILDING cg RADWASTE dVILDING D
pa WATFR STORAGE BVILDING Qa d'e TVRBIAIE BUILDINal DIESEL GEAIERATOR BLIILDING EXPLAIVATIOIV 0 ENCINEERINC BORIN PIEZOMEIER BORING
~- BACKHOE TRENCH
'.,SEISMIC SIIRVEY LINE pe BORINGS USED /N CROSS SEC TION DEVELOPMENT) FIGURE Z.S-45b PTYIAI
~
PVARP TEST IIVELL PTO-I PLrhtP TEST OOSL/~ATIOAI WELL UBLBI g Idfl/FACT/DR SORIIIIG N
WAI ER STORAGE BVILDING COAITAINMENT 8 V/LDIN6 0/6
/cpa~
Iope TVRBINE BUILDING CaTO AUKILIARY BVILDIAIG CONIROL AIILDIAIG PTO I
/OTLtY IBTO.
RADWASTE dVILDIAIG
.adI i
'Oa ri % i TO +
/d4
'Oa',
FUEL BUILDING DIESEL GENERA TOR dVILDIAI6 PTO EXPLAhlATION
EAfGINEERING BORING e
PIEZOME TER BORING
~ BACKHOE TRENCH SEISMIC SURVEY LIAIE
BORING USED IN CROSS SEC TIOAI DEVLOPMEAfT, FIGURE R5-45a PTO-I
~hIP TEST OOSERYBTT'IOI6 dYELL SPRAY POND SPRAY POND SPRA Y POND AapO SPRAY'r/AIP 29 26 27 SPR4Y POND Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2 IL 3 LOCATION OF UNITS I, 26 3 ENGINEERING BORINGS Figure 2.5-43a January 19, 1976 Amendment 15