ML18193A577
| ML18193A577 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/02/1975 |
| From: | Arizona Public Service Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18193A577 (1) | |
Text
UNIT I BORING LOCATIONS UNIT 8 BORING LOCATIONS UNIT 3 BORING LOCATIONS
'/
Q0/2
//P0 N
WATER 5'7ORACE SL/ILDING Qa 0G TURBINE BUILDING Qe A'
Qe EXPLAIVATION
ENGINEERING BORING 6
PIEZOMETER BORING a~ BACKHOE TREIVCH
~
SE/SM/C SVRVEY LINE Q0 BORING USED /N CROSS SEC TION DEVELOPMENT, FIGURE. 2. 5-45 N
WATER STORAGE BLIILDINC ee Qe Q0 TURBINE BUILDING 0
0 ENGINEERING BORING
+ PIEZOMETER BORING
~- BACKHOE TRENCH
< SEISMIC SURVEY LINE Q0 BORINGS USED /N CROSS SEC TION DEVELOPMENT/ FIGURE Z. 5-4$b EXPLANATION N
WATER STORAGE CIVILDING
/Spa TURBINE BIIILDING
/Z 0
DIESEL GENERATOR BUILDING SPRAY POND CONTAINMENT BLIILDINIG FLIEL BVILDING I
Pe AVEIL/A RY BUILOIIVC CONTROL BVILDING DIESEL 6'
ENERA TOR 8LIILDIIVG 0'ON TAINMEN /
BUILDING P0 0/4 Zp 0
AURILIARY BUILDING CONTROL BUILDING DIESEL GENERA TOR BVILDING
/6 CONTAIN//IENT BUILDING ee e/ 0 (
AV///LIARY BUILDING CONTROL BVILDING RAD WASTE BVILDIAIG Pe RADWA57E BUILD/ IV 6 6
FLIEL BUILDING pi RADWASTE BUILDING FLIEL BLIILDIIV6 P0
/ir EXPLANATION 0
ENGINEERIIVG BORING 6
PIEZOMETER BORI/VC
~ BACKHOE TRENCH SE/SMIC CURVEY LIAIE
BORING USED IN CROSS SECTION DE VLOPMEIV'T/ FICVRE 2.5-45 ie SPRAY POND SPRAY FOND SPRA Y POND SPRAY FOIVP 27 SPRAY POND 26 Arizona Nuclear Power Project Palo Verde Nuclear Generating Station i/
Units 1,2& 3 LOCATION OF UNITS 1/2&3 ENGINEERING BORINGS Figure 2.5-i3a June 2,
1975 Amendment 7