ML18193A063

From kanterella
Jump to navigation Jump to search
Figure 9.2-9, Turbine Cooling Water System
ML18193A063
Person / Time
Site: Palo Verde  
Issue date: 07/12/2018
From:
Arizona Nuclear Power Project
To:
Office of Nuclear Reactor Regulation
References
9.2-9
Download: ML18193A063 (1)


Text

TURBINE LUBE OIL COOLERS BIG NAL FROM LO TEMP CONTROLLER EHC COOLERS CONDENSATE PUMP LUBE OIL COOLERS GENERATOR HYDROGEN COOLERS Pl TURBINE COOLING WATER HEAT EXCHANGE RS TI TI Tl Pl AIR COMPRESSOR AFTER COOLERS Pl GENERATOR EXCITER AIR COOLERS AIR EJECTOR CONDENSER SIGNAL FROM HYDROGEN TEMP CONTROLLER Pl DEMINERALIZED MAKEUPWATER Pl PSV 3 E R VI CE AIR SIGNAL FROM COOLANT TEMP CONTROLLER LC TURBINE COOLING WATER SURGE TANK LG CR LAHL

~ ~LSH AIR COMPRESSOR JACKET COOLERS TURBINE GLAND STEAM EXHAUSTER MAINGENERATOR STATOR COOLERS FILL TURBINE COOLING WATER CHEMICAL ADDITION TANK SIGNALFROM AIR TEMP CONTROLLER ISOLATEDPHASE BUS COOLER MAINSTEAM SAMPLE COOLER (TYPICAL)

CR QS--

CR QS I

I TURBINE I

COOLING WATER I

PUMPS I

I L

~CR PSL Tl PSL PAL CIRCULATINGWATER PUMP LUBE OIL COOLERS HEATER DRAIN PUMP LUBE OIL COOLERS FEEDWATER PUMP TURBINE LUBE OIL COOLERS SIGNAL FROM LO TEMP CONTROLLER CONDENSATE SAMPLE COOLER ITYPICALI FEE DWATER SAMPLE COOLER ITYPICALI Arizona Nuclear Power Project I

Palo Verde Nuclear Generating Station Units 1,2& 3 I 0401-I I A 3 AP4.4 3 0 NOTE:

THISSYSTEM IS NON NUCLEAR SAFETY TURBINE COOLING WATER SYSTEIII Figure 9,2-9