NRR E-mail Capture - Brunswick Unit 1 - Acceptance Review for the Weld Overlay Relief Request (L-2018-LLR-0030)
ML18164A196
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 03/21/2018
From: Andrew Hon
Plant Licensing Branch II
To: Grzeck L
Duke Energy Carolinas
References
L-2018-LLR-0030
Download: ML18164A196 (2)


Text

NRR-DMPSPEm Resource From: Hon, Andrew Sent: Wednesday, March 21, 2018 10:39 AM To: Grzeck, Lee; Braden, Michael

Subject:

Brunswick Unit 1---Acceptance review for the weld overlay relief request (L-2018-LLR-0030)

By letter dated March 19, 2018, Duke Energy Progress (the licensee) requested relief from the requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code),Section XI, IWA-4411, at the Brunswick Steam Electric Plant Unit No. 1.

Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.55a(z)(1), the licensee submitted Inservice Inspection Program Alternative ISI-10 for the alternate repair of the degraded dissimilar metal butt welds, 1B21N4A-2-SW1-2 and 1B21N4D-5-SW1-2, of the feedwater N4A and N4D nozzles, respectively, on the basis that the alternate repair provides an acceptable level of quality and safety.

In accordance with Nuclear Regulatory Commissions (NRC's) process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," the NRC staff has performed an acceptance review to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the request has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has concluded that the subject relief request does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. If needed, the NRC staff may request for additional information to complete its technical review.

The NRC staff estimates the review effort to be 160 hours6.667 days <br />0.952 weeks <br />0.219 months <br />.

Andy Hon, Project Manager 1

Hearing Identifier: NRR_DMPS Email Number: 412 Mail Envelope Properties (DM6PR09MB25716A48F7E17424B03D2C9E99AA0)

Subject:

Brunswick Unit 1---Acceptance review for the weld overlay relief request (L-2018-LLR-0030)

Sent Date: 3/21/2018 10:39:06 AM Received Date: 3/21/2018 10:39:07 AM From: Hon, Andrew Created By: Andrew.Hon@nrc.gov Recipients:

"Grzeck, Lee" <Lee.Grzeck@duke-energy.com>

Tracking Status: None "Braden, Michael" <Michael.Braden@duke-energy.com>

Tracking Status: None Post Office: DM6PR09MB2571.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1826 3/21/2018 10:39:07 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: