ML18153D057
| ML18153D057 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/01/1992 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stewart W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18152A326 | List: |
| References | |
| NUDOCS 9207140030 | |
| Download: ML18153D057 (3) | |
See also: IR 05000280/1992013
Text
JUL O 1 1992
Docket Nos. 50-~80, 50-281
Virginia Electric and Power Company
ATTN: Mr. W. L. Stewart
Senior Vice President - Nuclear
5000 Dominion Boulevard
Glen Allen, VA
23060
Gentlemen:
SUBJECT:
(INSPECTION REPORT NOS. 50-280/92-13 AND 50-281/92-13)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Mr. M. W. Branch of this office on May 10 through June 6, 1992. The inspection
included a review of activities authorized for your Surry facility. At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the. enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspectioh consisted of selective examinations of procedures
and representative records, interviews with personnel, and nbservation of
activities in progress.
Based on the results of this inspection, certain activities appeared to be in
violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
Yo~ are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additidnal
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice~, a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9207140030 920701
ADOCK 05000280
Q
Virginia Electric & Power
2
JUL O 1 1992
Company
Should you have any questions concerning* this letter, please contact us.
Sincerely,
~
tl(CWLwv V * Lt_...&
Enclosures:
2.
NRC Inspection Report
cc w/encls:
E. W. Harre 11
Vice President - Nuclear Services
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
J. P. O'Hanlon
Vice President - Nuclear Operations
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
M. R. Kansler
Station Manager
Surry Power Station
P. 0. Box 315
Surry, VA
23883
M. L. Bowling, Jr,i Manager
Nuclear Licensing
Virginia Electric & Power Company
5000 Dominion Boulevard
Glen Allen, VA
23060
Sherlock Holmes, Chairman
Board of Supervisors of Surry County
Surry County Courthouse
Surry, VA .23683
Dr. W. T. Lough
Marvin Sinkule, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Virginia State Corporation Commission
Division of Energy Regulation
P. 0. Box 1197
Richmond, VA
23209
~ cc w/encls cont'd: See page 3
Virginia Electric & Power
Company
cc w/encls cont'd:
Michael W. Maupin
Hunton and Williams
P. 0. Box 1535
Richmond, VA
23212
C. M. G. Buttery, M.D., M.P.H.
State Health Commissioner
Office of the Commissioner
P. 0. Box 2448
Richmond, VA
23218
Attorney Genera 1
Supreme Court Building
101 North 8th Street
Richmond, VA
23219
_bee w/encls:
P. Fredrickson, RII
B. Buckley, NRR
Document Control Desk
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 166
Surry, VA
23883
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
Route 2, Box 78-A
Mineral, VA
23117
RII: DRP
ARifF'
Of/J)92
RII :DRP
Mv5
PFredrickson
JJf[/ ( /92
7
3
JUt.. O 1 1992.
i