Text
I '..
Docket Nos. 50-280, 50-281 License Nos. DPR-32, DPR-37 Virginia Electric and Power Company ATTN:
Mr. W. L. Stewart OCT 2 9 1990 Senior Vice President - Nuclear 5000 Dominion Boulevard Glen Allen, VA 23060 Gentlemen:
SUBJECT:
TEMPORARY WAIVER OF COMPLIANCE FOR SURRY UNIT 2 DOCKET NO. 50-281 OFFICIAL COPY This letter acknowledges your letter (Serial No.90-674) dated October 27, 1990, requesting a temporary waiver of compliance from the requirements of TS 3.14.C. that specifies that one service water flow path be operating and one flow path be operable to support operation of the Main Control Room emergency Switchgear Room A/C System whenever fuel is in the reactor for either unit.
The service water for these two systems come off on an 8-inch branch line in the service water system.
An inspection of Unit 2's 48-inch service water header with divers is considered warranted based on the initial inspection of the Unit l's headers.
To safely perform the inspection of the 48-inch header with divers, the one service water supply system will be operating to provide cooling water for the Main Control Room and the Emergency Switchgear Room A/C system, but the operability of the redundant suppy will be placed in an inoperable status.
The temporary waiver of compliance will allow the redundant operable service water supply for the Main Control Room and Emergency Switchgear Room A/C System to be isolated and thus be in an inoperable status for a 6-hour period while the inspection of the 48-inch header is being performed with divers.
This request would be separately applied to each of the 8-inch service lines.
We have reviewed your request which included discussion with your staff on October 26 and October 27, 1990, and are granting this temporary waiver of compliance provided the inspections are complete before 2400 on October 29, 1990.
Should you have any questions concerning this letter, please contact us.
cc:
(See page 2) r',,;'*',.---*:
- . 1\\J,.;,.J Sincerely, Original signed by James L. Milhoan (for)
Stewart D: Ebneter Regional Administrator
e Virginia Electric and Power Company cc:
E. W. Harrell Vice President - Nuclear Operations Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 J. P. 0 1Hanlon Vice President - Nuclear Services Virginia Electric & Power Company 5000 Dominion Boulevard Glen Allen, VA 23060 M. R. Kansler Station Manager Surry Power Station P. 0. Box 315 Surry, VA 23883 R. F. Saunders, Manager Nuclear Licensing Virginia Electric & Power Co.
5000 Dominion Boulevard Glen Allen, VA 23060 Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, VA 23683 W. T. Lough Virginia Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond, VA 23209 Michael W. Maupin Hunton and Williams P. 0. Box 1535 Richmond, VA 23212 C. M. G. Buttery, M.D., M.P.H.
Department of Health 109 Governor Street Richmond, VA 23219 Attorney General Supreme Court Building 101 North 8th Street Richmond, VA 23219 Commonwealth of Virginia bee:
(See page 3) e 2
OCT 2 9 1990
e Virginia Electric and Power Company 3
bee:
Document Control Desk DRP Section Chief NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 1, Box 166 Surry, VA 23883 NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 78-A Mineral, VA 23117 RII:DRP ARuflfl.-
10/?-,-j /90 R II ;:xii It' MSinkul~
10/}1 /90
/,9)RP
~!s ft-'iv'IO/q/90 OCT 2 9 1990