NOTICE OF VIOLATION Virginia Electric and Power Company Surry Nuclear Plant Docket Nos. 280 and 281 License Nos. DPR-32 and DPR-37 During an NRC inspection conducted from July 26. 1998. through September 5.
1998. a violation of NRC requirements were identified.
In accordance with the "General Statement of Policy and Procedures for NRC Enforcement Actions."
NUREG-1600. the violation is listed below:
10 CFR 50. Criterion XVI. "Corrective Action." states that measures will be established to assure that conditions adverse to quality such as deficiencies are promptly identified and corrected.
Contrary to the above. conditions adverse to quality were not promptly corrected in that:
- a.
In December 1992. the licensee identified that the setpoint for the overcurrent protection of the inside recirculation spray pump motors could result in spurious tripping upon motor starting, and this condition adverse to quality was not corrected as of August 1998; and
- b.
in June 1992. the licensee identified that there was no analysis or test to demonstrate that the components in the 125 VDC Station Battery Distribution System would receive rated voltage for all design basis scenarios. and this condition adverse to quality was not corrected as of August 1998.
This is a Severity Level IV violation (Supplement I).
The NRC has concluded that. for the Violation. information regarding the reason for the violation. the corrective actions taken and planned to correct the violation and prevent recurrence and the date when full compliance wilJ be achieved is already adequately addressed on the docket in your letter dated July 9. 1998. (Serial No.98-300).
However. you are required to submit a written statement or explanation pursuant to 10 CFR 2.201 if the description for the Violation therein does not accurately reflect your corrective actions or your position.
In that case. or if you choose to respond. clearly mark your response as a "Replyto a Notice of Violation." and send it to the United States Nuclear Regulatory Commission..ATIN:
Document Control Desk.
Washington. D.C. 20555-0001 with a copy to the Regional Administrator. Region II. within 30 days of the date of the letter transmitting this Notice of Violation..
If you contest this enforcement action. you should also provide a copy of your response to the Director. Office of Enforcement. United States Nuclear Regulatory Commission. Washington. DC 20555-0001.
If you choose to provide a response. the response will be placed in the NRC Public Document Room (PDR). and to the extent possible. it should not include any personal privacy, proprietary. or safeguards information so that it can be 9810290241 981005 PDR ADOCK 05000280 G
PDR ENCLOSURE 1
2 placed in the PDR without redaction.
If personal privacy or proprietary information is necessary to provide an acceptable response. then please provide a bracketed copy of your response that identifies the information that should be protected and a redacted copy of your response that deletes such information.
If you request withholding of such material. you must specifically identify the portions of your response that you seek to have withheld and provide in detail the bases for your claim of withholding (e.g..
explain why the disclosure of information will create an unwarranted invasion of personal privacy or provide the information required by 10 CFR 2.790(b) to support a request for withholding confidential commercial or financial information).
If safeguard's information is necessary to provide an acceptable response. please provide the level of protection described in 10 CFR 73.21.
Dated~at Atlanta. Georgia.
this ~th day of October 1998