ENCLOSURE 1 NOTICE OF VIOLATION Virginia Electric and Power Company Surry Docket Nos. 50-280,281 License Nos. DPR-32,37 During the Nuclear Regulatory Commission (NRC) inspection conducted on July 18-22, 1988, a violation of NRC requirements was identified.
In accordance with the "General Statement of Pol icy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the violation is listed below:
- Technical Specification 6.4.A.2 requires procedures for calibration and testing of systems involving the nuclear safety of the station. Technical Specification 3.1.C.2 limits the leakage rate of the reactor coolant system from other than controlled sources to less than one gallon per minute.
Contrary to the above, procedures 1 and 2-PT-10, Reactor Coolant Leakage, issued for use in October 1987, contained errors in constants used to*
correct for changes in pressurizer level and reactor coolant system temperature during the test.
These errors could have led to accepting an unacceptable result.
This is a Severity Level IV violation (Supplem~nt I).
Pursuant to the provisions of 10 CFR 2.201, Virginia Electric and Power Company is hereby required to submit a written statement or explanation to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC
- 20555, with a copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, Surry, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked as a "Reply to a Notice of Violation" and should include [for each violation]:
(1) admission or denial of the violation, (2) the reason for the violation if admitted, (3) the corrective steps which have been taken and the results achieved, (4) the corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending the response time.
If an adequate reply is not received within the time specified in this Notice, an order may be issued to show cause why the license should not be modified, suspended, or revoked or why such other action as may be proper should not be taken.
8809070101 80~8~~80 PDR ADOCK PNU G
Virginia Electric and Power Company Surry 2
Docket Nos. 50-280,281 License Nos. DPR-32,37 Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.
Dated a!u,Atlanta, Georgia this~ Lf 1:--* day of Uiv-4 vcl' 1988 FOR THE NUCLEAR REGULATORY COMMISSION Alan R. Herdt, Chief Engineering Branch Division of Reactor Safety