CHANNEL DESCRIPTION
- 24.
Turbine First Stage Pressure
- 25.
Emergency Plan Radiation Instr.
- 26.
Environmental Radiation Monitors
- 27.
Logic Channel Testing
- 28.
Turbine Overspeed Protection Trip Channel (Electrical)
- 29.
Turbine Trip Setpoint
- 30.
Seismic Instrumentation
- 31.
Reactor Trip Breaker
- a.
Undervoltage Trip Logic
- b.
Shunt Trip Logic
- 32.
Reactor Coolant Pressure
- 33.
- a.
Steam Generator Water Level Low-Low
- b.
- c.
S.I.
- d.
Station Blackout
- e.
Main Feedwater Pump Trip CHECK s
- M
- M N.A.
N.A.
N.A.
M N.A N.A.
N.A.
N.A.
s s
(All N.A.
N.A.
--~----- --~
TABLE 4.1-1 (Continued)
CALIBRATE R
R N.A.
N.A R
R R
N.A N.A.
N.A.
R R
R Safety Injection R
N.A.
TEST M
M N.A.
M R
R M
M M
M N.A.
M M
REMARKS TLD Dosimeters Stop valve closure or low EH fluid pressure The test shall independently verify operability of the under-I voltage and shunt trip attachments.
surveillance requirements)
N.A.
R