Forwards IE Insp Repts 50-280/81-29 & 50-281/81-29 on 811102-05 & Notice of Violation
ML18139B782
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/10/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139B779 List:
References
NUDOCS 8203080497
Download: ML18139B782 (2)


See also: IR 05000280/1981029

Text

,, .

... **'

e

DEC 1 0 1981

Virginia Electric and Power Company

ATTN:

Mr. R. H. Leasburg, Vice President

Nuclear Operations

P. O. Box 26666

Richmond, VA

23261

Gentlemen:

Subject:

Report Nos.~2~0/8i:z9:::sind 50-281/81-29

e

YELLOW

This refers to the routine inspection conducted by Dr. D. M. Montgomery of this

office on November 2-5, 1981, of activities authorized by NRC Operating License

Nos. DPR-32 and DPR-37 for the Surry facility.

Our preliminary findings were

discussed with Mr. J. L. Wilson, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors. The Region II Mobile Laboratory

was also brought to your site and used by the inspector to make certain indepen-

dent measurements.

The basic purpose of these independent measurements is to

verify your capability for analyzing radioactive effluents, and to achieve and

maintain comparable methods of analyses between your facility and the NRC.

The

complete data from these measurements will be reported in a subsequent Inspection

Report.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)

will be placed in the NRC

1s Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information *contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(l) *

  • - --~--~-- --

8203080497 820121

PDR ADOCK 05000280

G

PDR

-*~

e

Virginia Electric and Power Company

2

OEC 1 0 1981

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-280/81-29

and 50-281/81-29

cc w/encl:

J. H. Ferguson, Executive

Vice President-Power

J. L. Wilson, Station Manager

E. Davis, Director Nuclear Security

bee w/encl :

Document Management Branch

Commonwealth of Virginia

RII

CDE~jw

12/ 1 /81

RI I ~J(l l")

Hi

DMMontgomery

\\ *ll q;a1

RI I 'iY

/di;~

Klandis

12/ ~ /81

Sincerely,

isl

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

A!JJaa

l/frs'Jhr

£1121, /81

R(/

RCLewis

12/ () /81