Text
,, .
... **'
e
DEC 1 0 1981
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. O. Box 26666
Richmond, VA
23261
Gentlemen:
Subject:
Report Nos.~2~0/8i:z9:::sind 50-281/81-29
e
YELLOW
This refers to the routine inspection conducted by Dr. D. M. Montgomery of this
office on November 2-5, 1981, of activities authorized by NRC Operating License
Nos. DPR-32 and DPR-37 for the Surry facility.
Our preliminary findings were
discussed with Mr. J. L. Wilson, Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors. The Region II Mobile Laboratory
was also brought to your site and used by the inspector to make certain indepen-
dent measurements.
The basic purpose of these independent measurements is to
verify your capability for analyzing radioactive effluents, and to achieve and
maintain comparable methods of analyses between your facility and the NRC.
The
complete data from these measurements will be reported in a subsequent Inspection
Report.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)
will be placed in the NRC
1s Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information *contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(l) *
- - --~--~-- --
8203080497 820121
PDR ADOCK 05000280
G
-*~
e
Virginia Electric and Power Company
2
OEC 1 0 1981
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/81-29
and 50-281/81-29
cc w/encl:
J. H. Ferguson, Executive
Vice President-Power
J. L. Wilson, Station Manager
E. Davis, Director Nuclear Security
bee w/encl :
Document Management Branch
Commonwealth of Virginia
RII
CDE~jw
12/ 1 /81
RI I ~J(l l")
Hi
DMMontgomery
\\ *ll q;a1
RI I 'iY
/di;~
Klandis
12/ ~ /81
Sincerely,
isl
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
A!JJaa
l/frs'Jhr
£1121, /81
R(/
RCLewis
12/ () /81