ML18139B720
| ML18139B720 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 12/09/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18139B718 | List: |
| References | |
| NUDOCS 8202050375 | |
| Download: ML18139B720 (2) | |
See also: IR 05000280/1981030
Text
... I
OEC O *g 188\\
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
Subject: Report Nos.<sli="?80{81~nd 50-281/81-30
This refers to the routine safety inspection conducted by Mr. L. A. Franklin of
this office on October 26-30, 1981, of activities authorized by NRC Operating
License Nos. DPR-32 and DPR-37 for the Surry Power Station facility.
Our pre-
liminary findings were discussed with Mr. J. L. Wilson at the conclusion of the
inspection.
Areas examined durin*g the inspection and our findings *are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is discussed
in the enclosed report.
One new unresolved item is identified in the enclosed inspection report.
This
item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)
will be placed in the NRC
1 s Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(l).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosures:
See Page 2
8202050375 820126
PDR ADOCK 05000280
G
Sincerely,
a/,ee
Paul J. Kellogg, Chief
Reactor Projects Branch 2
Division of Resident and
Reactor Project Inspection
- - '
e
Virginia Electric and Power Co.
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/81-30
and 50-281/81-30
cc w/encl:
J. H. Ferguson, Executive
Vice President-Power
J. L. Wilson, Station Manager
E. Davis, Director Nuclear Security
bee w/encl:
Document Management Branch
Commonwealth of Virginia
RI! -7.4
RIIJi
-
' -
V
LAFranklin:es
CMHosey
n~' ;s1
ll/2-7 /81
2
DEC O 91981
RII ~
RI!
RI!
~()
~gg
AFGibson
K La rfci rs"
...J,.1/ /.31-
11/0 /81
11/i /81
l "'2. l~
I (
- i- (