Forwards Safety Evaluation Re Loss of Normal Feedwater,Per 810710 Error.Encl Documentation of New Ref Analysis Will Be Incorporated Into Updated FSAR & Submitted to NRC by 820722
ML18139B531
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/14/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
References
539, NUDOCS 8109180207
Download: ML18139B531 (15)


Text

e VIROrNIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 2 3 2 61 R.H.LEASBURO VICE PRESIDENT NucLEAI< OPERATIONS September 14, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactor Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D_. C.

20555 Gentlemen:

Seri.al No. :

FR/RWC:

plc Docket Nos. :

License Nos. :

AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNITS NO. 1 AND NO. 2 SUPPLEMENT TO.PROPOSED TECHNICAL SPECIFICATIONS CHANGE 539 50-280 50-281 DPR-32 DPR-37 Pursuant to the provisions of Surry Units No. 1 and No. 2 Technical Specification 6.6.2.a(8), NRC Region II was notified on July 10, 1981 of an error in the currently applicable Loss of Normal Feedwater analysis.

The error found was in the lack of representation of the reactor coolant pump (RCP) heat input after reactor trip in the Final Safety Analysis Report (FSAR) analysis.

The impact of this error is to require more auxiliary feedwater (AFW) flow than can be provided by one AFW pump (350 gpm) to meet the analysis acceptance criteria, To determine an appropriate AFW flow which can satisfy the acceptance criteria when RCP pump heat input is continued after reactor trip, Vepco has performed licensing analyses using the RETRAN computer code.

These analyses have been performed using the reactor system transient analysis methodology described in our topical report which was transmitted by letter from Mr. W. N. Thomas (Vepco) to Mr. H. R. Denton dated April 14, 1981 (Serial No. 215).

Documentation of the new reference analysis to the level of detail consistent with the Surry FSAR is provided in Attachment 1.

This documentation will be incorporated into the Surry Updated FSAR, which will be submitted to you no later than July 22, 1982.

The analysis results indicate that an AFW flow of 500 gpm will meet the analysis criteria by preventing water relief from the pressurizer and ensuring long term decay heat removal.

These results have been reviewed by both the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control staff.

In conjunction with this submittal, we would like you to proceed with your review of the license amendment applications discussed in our letter of April 20, 1981 (Serial No. 244).

These license amendments include a proposed change to the Technical Specifications which would require three operable auxiliary feedwater pumps on each unit.

Upon completion of your review and prior to issuance of the license amendments, please contact us in

.~8109180207 810914-~

PDR ADOCK 05000280 1

P PDR_)

e 2

VIRGINIA ELECTRIC AND POWER COMPANY TO Mr. Harold R. Denton order to coordinate implementation of the license amendments with the status of modifications to the AFW system, which are currently scheduled for completion during the the upcoming Surry Unit No. 2 refueling.

The administrative procedures provided in our LER 81-025/0lX-1 as corrective actions will be followed in the interim to ensure that minimum auxiliary feedwater flow requirements are met.

If you require any additional information, please contact this

. office.

Attachment

1.

Safety Evaluation cc:

Mr. James P. O'Reilly Office of Inspection and Enforcement Region II Very truly yours,

~

R.H. Leasburg

e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.H. Leasburg, who is Vice President-Nuclear Operations, of the Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this

/ </--U day of b,:::t:.

19 i I

  • My Commission expires:

, 19 is.

Notary Public (SEAL)

ATTACHMENT l SAFETY EVALUATION

PAGE LOSS OF NORMAL FEEDWATER Identification of Causes and Accident Description A'loss of normal feedwater (from a pipe break, pump failures, valve malfunctions or loss of offsite AC power) results in a reduction in capability of the secondary system to remove the heat generated in the reactor core. If the reactor is not tripped during this accident, core damage would possibly occur from a loss of he~t sink.

If an alternative supply of feedwater is not supplied to the plant, residual heat following reactor trip would heat the primary system water to the point where water relief of the pressurizer occurs. Significant loss of water from the Reactor Coolant System (RCS) could conceivably le~d to core damage.

Since the plant is tripped well before the steam generator heat transfer capability is reduced, the primary system variables never approach a

The following provide the. necessary protection against a

loss of normal feedwater:

1.

Reactor trip on low-low,water level in any steam generator.

2.

Reactor trip on high pressurizer level.

3.

Reactor trip on high pressurizer pressure.

4.

Two motor driven auxiliary feedwater pumps which are started on:

e PAGE 2

a.

Low level in any steam generator

b.

Any safety injection signal *

c.

Trip of all main feedwater pumps

d.

Loss of offsite a-c power

e.

Manual actuation

5.

One turbine driven auxiliary feedwater pump is started on:

a.

Low level in any two steam generators.

b.

Manual actuation The motor driven auxiliary feedwater pumps are supplied by the diesels if a loss of offsite power occurs and the turbine-driven pump utilizes steam from the secondary system.

Both type pumps are designed to start within one minute even if a

loss of offsite AC power occurs simultaneously* with loss of normal feedwater.

The turbine exhausts the secondary steam to the atmosphere.

The

~

~uxiliary pumps take suction from the condensate storage tank for delivery to L_

the steam generators.

The analysis shows that following a loss of normal feedwater, the Auxiliary Feedwater System is capable of removing the stored and residual heat thus preventing either overpressurization of the RCS or loss of water from the reactor core.

Analysis of Effects and Consequences Method of Analysis A detailed analysis using the RETRAN code has been performed in order to obtain the plant transient behavio~

following a

.loss of normal feedwater.

The

PAGE 3

simulation describes the plant ne~tron

~inetics, RCS including natural circulation, pressurizer, steam generators and feedwater system.

The digital program computes pertinent variables including the steam generator shell side inventory, pressurizer water level, and reactor coolant average temperature.

Assumptions;

1.

The plant is initially operating at 102 percent of the ESF design rating.

2.

A conservative core residual heat generation based upon long term operation at the initial power level preceding the trip.

3.

Reactor trip occurs on low-low steam generator level.

4.

Only two motor driven auxiliary feedwater pumps are available one minute after the accident.

5.

Auxiliary feedwater is delivered to all steam generators.

6.

Secondary system steam relief is achieved through the self-actuated safety valves.

Note that steam relief will, in fact, be through the power-operated relief valves or condenser dump valves for most cases of loss of normal feedwater.

However, for conservatism these have been assumed unavailable.

7.

The initial reactor coolant average temperature is 4°F higher than the nominal value, and the initial pressurizer pressure is 30 psi higher than nominal.

The loss of normal feedwater analysis is performed to demonstrate the adequacy of the reactor protection and engineered safequards systems (e.g., the Auxiliary Feedwater System) in removing long term decay heat and preventing excessive heatup of the RCS with possible resultant RCS overpressurization or loss of RCS water.

As

such, the assumptions used in this analysis are designed to minimize the

e e

PAGE 4

energy removal capability of the system and to maximize the possibility of water relief from the coolant system by maximizing the coolant system expansion, as noted in the assumptions listed above.

For the loss of normal feedwater transient, the reactor coolant volumetric flow remains at its normal value and the reactor trips via the low-low steam generator level trip with no change in DHBR below the value at the start of the transient.

The ieactor coolant pumps may be tripped at some later time to reduce heat addition to the RCS;

however, in this analysis they.were conservatively assumed to be operating during the entire transient.

An additional assumption made for the loss of normal feedwater evaluatio~ is that the pressurizer power-operated relie~

valves are as~umed t~ fundti~n~:

normally.

If these valves were assumed not to function, the reactor coolant;"

system pressure during the transient would rise to the actuation point of, the'.

pressurizer safety valves (2500 psia).

The increased RCS pressure, however.,.

results in less expansion of the coolant and hence more margin to the point where water relief from the pressurizer would occur.

assumptions ~sed in the analysis are listed in Table 1.

Results The balance of ~lant Figures 1 through 4 show the significant plant parameter transients following a loss of normal feedwater.

The calculated sequence of events for this accident is listed in Table 2.

PAGE 5

Following the loss of main feedwater and prior to turbine trip, the water level in the steam gene~ator~

will fall due to the continued steam flow to the turbine.

Following the reactor trip on low-low steam generator water level and the subsequent turbine trip, steam flow through the safety valves co~tinues to dissipate the stored and generated heat.

One minute following the initiation of the low-low level trip, the auxiliary feedwater pumps are automatically started, reducing the rate of water level decrease.

The capacity of the auxiliary feedwater pumps is such that the water level in the steam gener~tors does not recede below the lowest level at which sufficient heat transfer area is available to dissipate core residual heat without water relief from the pres~urizer relief or safety valves.

From Figure 2 it can be seen that at no time is there water relief from the pressurizer.

Conclusions Re{sults of the analysis show that a loss of normal feedwater does not adversely affect the

core, the
RCS, or the steam system since the auxiliary feedwater capacity is such that reactor coolant water is not relieved from the pressurizer relief or safety
valves, and the water level in the steam generators remains adequate to remove decay heat from the core.

PAGE 6

TABLE 1 BALANCE OF PLANT ASSUMPTIONS USED IN LOSS OF NORMAL FEEDWATER ANALYSIS Item Auxilia:r:y Feedwate:r:

  • nelay Time*

. Auxiliary reedwate:r:

Temperatu:r:e Number of Auxiliary reedwater Pumps Auxilia:r:y Feedwate:r: Flow Rate Value Used in Analysis 60 sec 120 °r 2

500 gpm C:r:ite:r:ia At least two moto~-

driven auxilia:r:y ~eedwater.

pumps will attain rated flow within 60 seco~ds aff~r initiation of accident

$ 120 °r Minimum of 2 pumps must deliver to the steam gene:r:ators.

~ 500 gpm

TABLE 2 TIME SEQUENCE OF EVENTS FOR LOSS OF NORMAL FEEDWATER Event Analysis begins (steady state)

Main feedwater flow stops instantaneously Low steam generator water level trip Rods begin to drop Peak water level in pres-surizer occurs Stearn generators begin to rec&i~e auxiliary ie~d f~oro two motor-dziven auxiliary feedwater pumps Auxiliary feedwater addition matches secondary boiloff required to remove decay heat and pump heat. Stearn generator inventory begins to increase.

Time C sec. )

0 1 0

71. 8 73.8 77.0 131. 8 N1200 PAGE 7

e FIGURE 1 PRESSURIZER PRESSURE LOSS OF NORMAL FEEDWATER TRANSIENT 2700 I

I 2600 I

I j

2500 2400 p

R z R 2300 p

R E

5 2200 5 u R

E 2100 p

5 J

A 2000 I

I I

! ' I I

I lh i

I I

I I

i I

i I

I j

I I

l i

I I

l i

i I

I I

I I

I I

I I !

I i

I I

I I

I I

i I

I i

[~

i I \\

I 1

I I

I I

I I

I I

\\

i I

I I

I

~

i j

+

I '

I I

I I

I I

I I

I I

I I i

~-

I I

I I

-,.:i..,, -

! m I

i I

I I

i 1900 1600 1700.

I G*

400 600 1200 1600 2000 2400 2600 3200 3600 4000 TIME IN SECONDS

i e

e FIGURE 2 PRESSURIZER WATER VOLUME LOSS OF NORMAL FEEDWATER TRANSIENT 1300-l-!----ll-----1---+;--1---4----+

1 --I----+----+----+;

I 12so-l-l-----J1-----1---+--1----+---+--i----+----+---+I I

I 1200-+i-1 ---l--+---+----1!------+----l------!-------r----;-'-~!

I I i

I I 11504+-

1 ----1~--+----+----lf----+----t----ll----+---+---+

1100-U.-I ---l'-----l-----+---1-----1----1---!------+-----+---+

1.

1 I

i I R 1 050_µ..rn--+----+---+--~--+---+-I --+-, --+-----,1i-----+I

~ 1 000--1.UI ~--l 1

L---4-----+---1-----1---+-1 --!----+I--+---+

E i

R I

i

~

950--1-'-'! -l----ll-----l----+-1--1-----1----1---1----+----+---+

M LU 9*00 I

I I

I!

I

,I I

E 1,

i t, *--,1.----\\1---+---+---:---+!

1

-r,.

I l

I l

0 400 600 1200 1600 2000 2400 2800 3200 3600 4000 TIME IN SECONDS

e e

FIGURE 3 LOOP TEMPERATURES LOSS OF NORMAL FEEDWATER TRANSIENT

' I 640 I

630,:

L 0

0 p T

i E

M p

F 600 I

I I

I 1 ~

I I I

I I

I I

I 1

I I

i I

I I

i i

I I

I l

I I I

I I

I I

.I I

I I

I I

I 11 1T I

i I

i I

I I

I\\

I i : '\\.

I l ::.'\\

I I

'1 I

f:~,---.... ~

l 1**---

I i

0 (--o--, tin I

,po

)---G---,--.a--.;1--.0:-::- 0

--0--,---0--,--0--f--O--J I

I I

I I

I I

I I

i I I I

I i

i I

I I

I I

j I

i i

i' I

I I

I I

I I

t I

I I

i I

I II I

i I

!I I

I

~

I i

I i

I I

I I

i I

I I

I I

I

~

I I

I I

I I

i I

I I

I i

i I

I i

I

' 1111 I

I I ii

I

..... iii I

I '....

j ii **

1111 I

I Li 620 610 590 580 570 560 550 540 I

I I

I G

400 BOO 1200 1600 2000 2400 2800 3~00 3600 4000 THIE IN SECONDS SOUARE

= TCOLO

)(

= THOT

4, e

FIGURE 4 STEAM GENERATOR PRESSURE LOSS OF NORM.AL FEEDWATER TRANSIENT 1200 I

I I

I I

l I

I -

I -

5 T

E A

M 1000 G

E N

p R

E s s u R

900 E

p s I

A 600 1 *~

1-I I

f I i i

1 I

I I

I I

I I

I i

I I

I I

I I

I I

I I

I I

I I

I I

I i

I l

I I

i I

I I

I i

I I

I I

i I

I i

I I

i I

I i

I I

I I

I i

I I i I

i I

I j

I I

I I

I i

I I

i I

I I

I I

I I

I I

I i

I l

l I

i i

I j

I I

i I

I I

I I i

I l

I I

I I

i I

I l

I I

i I

I I

I I

I I

i I

I I

I i

l I

I i

I i

I I

I I

I i

I l

i I

i I

I I

I i

I l

i I

I I

I I

I i

i I

I I

I I

I i

I I

I I

l I

I I

I I

I I

I I

i I

i I

I I

i I

I I

I I

i i

I I

I I

I I

I i

i I

I i

I

- ~--

111i111111111i111111111j111111111j,,,,,*,,,,

I I

I I

1100 700 G

400 800 1200 1600 2000 2400 2800 3200 3600 40 0 TINE IN SECONDS