ML18139B292
| ML18139B292 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 03/13/1981 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML18139B289 | List: |
| References | |
| 50-280-81-06, 50-280-81-6, 50-281-81-06, 50-281-81-6, NUDOCS 8105070435 | |
| Download: ML18139B292 (1) | |
Text
.,I
/
APPENDIX A NOTICE OF VIOLATION.
Virginia Electric and Power Company Surry 1 and 2 Docket Nos. 50-280 & 50-281 License Nos. DPR-32 & DPR-37 As a result of the inspection cond~cted on February 9-12, 1981, and in a~cordance
. 'f,'ith the Interim Enf.or.c_ement Policy, _45 FR 66754 (October 7, 1980), the following
- -*,*vi_o:.1~t:_ion wa:s idEiri_ti°fi_ed:-:_... _:_*,*.
- ' *.. *> **.;<,",-,:*'10'*.**C:FR '.SG-;***App*en-dlx'.*C:rtt*e.rTorF*TX;, as:'*imp*l emente.d* by,:Topi cal,Report. VEP~r..,:3A-:**:,--*,
Section 17.2.9 requires in part that measures shall be established to as-sure that' speci a r processes are contra 11 ed and accomplished in accordance with applicable codes, standards, specifications, criteria, and other spe-cial* requirements.
Fillet we.ld si.ze measurement. requirements aimed at assuring adequate fillet throat for piping fillet welds are depicted in the applicable code (USAS B31.1-1967 edition).
Contrary to the above, on February 11, 1981, adequate measures had not been established to assure proper measurement in that a QC inspector, whose func-tion included verification of piping fillet weld sizes, could not demon-strate*the 'fil*let*weld size mea~urement process.
.........- This\\~,~- s~*v*e**;\\ty -L~~-~i. v\\i1:~ i a~*;'o*ri (supp i enie.nt *n. () ~-
- ._.. Pu*rsua*n*t. ~o th~ p~bv'f s1dns :ot.10* tFR 2-.;__201/you *ar.e h:ereby *required. to :sub~i t *to"
- this office with.in twenty-five days :of the. date of this Notice, a written state-
. m*ent"* o*r '*exp:1 anatfon**'i n:--*rep ly*,:* fn'c:ludin.g-:* * * "(1)
- admiss*-fon
- or *den*; a 1
- of**:uie****a l leged violation; (2) the reasons for the violation if admitted; (3) the corrective
- steps.which have been taken and the results achieved; (4) correcti~e steps which will be taken to.avoid furih~r-yipla~ioni; and (5). th~ date when full compl~anc~*
will be achieved: Und~r the a~ihorit) of Section 182 6f {h~ Atomi~ Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.
Date: MAR 1 3 *1991 *
.*.*,.; ;.'-.. ;*... :*~.. '
..~-:..... *. :.
.. *,'.. *.:. ~
...