05000280/LER-1980-070-01, /01T-0:on 801114,S&W Informed Util That Out of Phase Transfer Might Occur When Emergency Buses Transferred from Offsite Source.Caused by Undeterminable Design Error. Time Delay Circuit Installed

From kanterella
(Redirected from ML18139A863)
Jump to navigation Jump to search
/01T-0:on 801114,S&W Informed Util That Out of Phase Transfer Might Occur When Emergency Buses Transferred from Offsite Source.Caused by Undeterminable Design Error. Time Delay Circuit Installed
ML18139A863
Person / Time
Site: Surry Dominion icon.png
Issue date: 11/26/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139A862 List:
References
LER-80-070-01T, LER-80-70-1T, NUDOCS 8012030717
Download: ML18139A863 (3)


LER-1980-070, /01T-0:on 801114,S&W Informed Util That Out of Phase Transfer Might Occur When Emergency Buses Transferred from Offsite Source.Caused by Undeterminable Design Error. Time Delay Circuit Installed
Event date:
Report date:
2801980070R01 - NRC Website

text

-.J~C FORIV'.'..,~66 U.S. NUCLEAR REGULATORY COMMISSION 7-711 e LICENSEE EVENT REPORT e CONTROL BLOCK: I

  • 1 10 (PLEASE PRINT OR TYPE ALL REQUIR~_D INFORMATION) 1 6

0 IV IA I s I p I s I 1101 0 I O I - I O IO IO IO I O I - I O I O 101 4 11 11 l 1 l 1 101 10 9

LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 57 CAT 58

~

8, CON'T TIIJ 8

~~~~ L~©I o I s I o I o I o I 2 I s I o 1011 I 11 11 4 I s I o I© 111 1 1 2 1 6 I s I o 10 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE.CONSEQUENCES@)

I Stone and Webster Jngineerinq Corrp:my info:c:med VEPCO that because there is no defi ni ti::sre

))))
  • 1Phase Relationship between the off-site source and them:; Voltages and no tine pennis-1sive for collapsing the residual voltage, an out-of-phase transfer might occur when the,I

~ency buses are transferred from the off-site S01.llX:e to the ECG.

'Ibis event is I..

[IT[)

[TIIJ [ill]

1reportable per T.S. 6.6.2.a. (9).

The health and safety of the public were not affected. I 7

8 9 [ill]

7 B

SYSTEM CODE

!E jEI@

9 10 LER/RO LVENTYEAR REPORT ls IO I NUMBER 21 22

CAUSE

CAUSE CODE SUBCODE COMPONENT CODE

~@) ~@) jCjKITIBjR)Cl@

11 12 13 18 SEQUENTIAL OCCURRENCE REPORT NO.

CODE

! 0 ! 7 l O I j/1

! Ojl I 23 24 26 27 28 29 COMP.

SUBCODE

~@

19 REPORT TYPE L!J 30 VALVE SUBCODE w@

20 l=l 31 REVISION NO.. w 32 80 ACTION FUTURE EFFECT

. SHUTDOWN r.:;:;,.

ATTACHMENT NPRD-4 TAKEN ACTION ON PLANT METHOD.

HOURS SUBMITTED FORM SUB.

PRIME COMP.

SUPPLIER COMPONENT MANUFACTURER W@~@ ~(§) lU Io Io Io Io I ll:J@* LID 33 34 35 36 37 40 41 42 Lru@ Ir Io Io! s I CAUSE DESCRIPTION ANO CORRECTIVE ACTIONS @

43 44 47 I The cause of this design error has not been determined. A time delay circqit was

!III] I installed on the FOG output breaker to allCM a 2. O second time delay between the open-0:W I ing of the off-site supply breakers and closing of them::; breakers. 'Ibis was accom-

[I))J I plished as a temporary nodification. A design change will be canpleted to provide final I lIITI I resolution.

7 8

9 FACILITY

'Jo' STATUS

'll, POWER OTHER STATUS V:::::/

uTIJ W@ Io lo Io K~I S/G Replacerrent BO METHOD OF

~

DISCOVERY DISCOVERY DESCRIPTION LILJ@.L.....---------------

7*

8 9

10 12 1'3 44 ACTIVITY CONTENT

  • ~

RELEASED OF RELEASE AMOUNT OF ACTIVITY ITEJ ~

@) l!J@l N/A 7

8 9

10 11 45 46 44 45 N/A

.. LOCATION OF RELEASE@.

so so PERSONNEL EXPOSURES

~

NUMBER

(:;:;\\ TYPE t:;;;,,. DESCRIPTION [J:EI I O 10 I OJW~L---* -=Ni/:.:A ______________________

7 8

9 11 12 13 80 PERSONNEL INJURIES

~

NUMBER DESCRIPTION6 [iliJ l O I O IO l@L-. __ ___..:N.:!..VA~------------------------~

7 8

9 11 12 BO LOSS OF OR DAMAGE TO FACILITY '4J'I' TYPE

DESCRIPTION

Ii,;:;:)

D:EJ ~@

N/A 7

8 9

10 80 PUBLICITY C\\

NRC USE ONLY ljSNUEfc;;\\44...

DE_s_c_RI-PT_I_O_N_~_~~~......1~..._~~~~~~~~~--~~~~~~~~~--

~

o 1111111111111!

. 8 1 2 0 3 u 111, ;

68 69 80..

NAMi= ni= PAJ:P.llAJ:A --- J. L. Wilson PHONE:

(804) 357-:3184

~

C.

,..,~'ITACHMENT 1, PAGE 1 OF

  • SURRY POvER STATION, UNIT 1 IXCKET NO:

50-280 REPORT NO:

80-070/01~0 EllENT DATE:* : 11-14-80 SUBJ.OCT:

EMER3E~Y BUS 'OOT OF PHASE TRANSFER

1.

DESCRIP!'ION OF 'EVENT:

On November 12, 1980, Stone and Webster Engineering Corporation infonned VEPm that, under certain conditions,.an out of phase transfer might occur when the emergency buses are transferred from the off-site p:::Mer som:c:e to the emergency diesel generator after the generators have reached rated speed and voltage because there is no definitive phase relationship between the off-site source

On Novanber 14, 1980, Stone and Webster Corporation confinned a significant*out of phase transfer oould occur under the following conditions:

1.

A Safety Injeclion signal is received and the diesels start and nm on standby.

2. Off-site power is lost, the emergency buses isolate from the off-site supply and are transferred to the diesel generators.

'Ihis event is reportable per Technical Specification 6.6.2.a.(9).

2.

PROBABLE CONSmuENCES:

As built, there was no time pennissive to allow for collapsing of residual bus voltages. 'Iherefore, an out of phase transfer might have caused severe noter *end-tum forces as well as high torsional stresses that could cause rrotor rotor, ooupling or driven equipnent shaft failures.

A study of this transfer effect on the low head safety injection rrotors indicates that the resultant volts per Hertz ma.y not be within the recorrMendecl.allowable limit for a safe transfer per ANSI CS0.41-1977. '!he scenario described above has a very low probability of occurring and has nnt been ext>P.rienced at Suny; therefore the health and safety of the public-were not. affected.

3.

CAUSE

'!he cause of this, !design error has not been detennined.

4.

IMMEDIATE CO~ ACTION:

In order to*alleviate the p:,ssibility of a significant out of phase transfer condition, a time delay circuit was installed on the emergency diesel generator output breakers to allow a 2.0 second tine delay between the opening of the off-site supply breakers and closing of the emergency diesel generator breakers.

A 1.96 second tine delay is sufficient for the residual voltages to dissipate to allowable levels.

The installation of the tine delay was accanplished as a temporary m::xlification.

e A'ITACHMENT 1, PAGE 2 OF 2 SURRY J?a,l1ER STATION, UNIT 1 IXCKET N'.):

50-280 REPORI' N'.):

80-070/0lT-0 EVENT DATE:

11-14-80 C)

SUBJECT:

E:MER:;ENCY BUS *CXJT. OF PHASE TRANSFER
5.

SUBSF.QUENT CORRECTIVE ACTION:

e A design change will be corrpleted to provide final resolution.

6.
  • GENERIC IMPLICATIONS:

The above corrective action has resolved any generic implications at Sun:y.