Forwards LERs 80-023/03L-0,80-026/03L-0 & 80-027/03L-0
Date released: 12/10/2018 Download: ML18139A796


LER 80-027/03L-0:on 801005,w/unit at 100% power,PT-27B Revealed That Amp Reading for Circuit 6A,boric Acid to Blender,Panel 11 Was Below Acceptance Criteria.Caused by Failure of Heat Tracing Tape Due to Excessive Heat
ML18139A799
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/31/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A799 (2)
LER 80-026/03L-0:on 801005,w/reactor at 100% Power & Redundant Low Head Safety Injection Pump Out of Svc for Maint,Operator Failed to Retest Operable Pump 2-SI-P-1a within Specified Time.Caused by Operator Oversight
ML18139A798
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/31/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A798 (2)
LER 80-023/03L-0:on 801003,while Operating at 100% Power, During Periodic Test 27D,low Amp Readings Found on Circuit 1B,panels 10 & 11,causing Valve MOV-2867D to Be Considered Inoperable.Caused by Damaged Heat Tracing Tapes
ML18139A797
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/31/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A797 (2)
Forwards LERs 80-023/03L-0,80-026/03L-0 & 80-027/03L-0
ML18139A795
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/31/1980
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139A795 (1)