Text
-
'
~*~_ . .,_._ ____ -~ ~---**-----~-- -----"--'----_..,~~---- "'"--*----**- ~-~-c---..-~-~--... *-- *~- ---*.J---*.,, --,-
le t
~
- -~ .
.. I
,,
f -1
!
i .
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
- , \\.
f.
_,\\
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
APR 18 1980
i-
. ,
- ,.
i
'(
- '
i . .
In Reply Refer To:
. RII :DJP
- so-280/80-04
50-281/8.0-06
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
This refers to the inspection conducted by D. J. Perrotti of this office on
March 10-14, 1980 of activities authorized by NRC License Nos. DPR.:..32 and DPR-37
for the Surry Nuclear Power Station :facility, and to the discussion of*our findings
held with W. L. Stewart at the conclusion of the inspection .
Areas examined during the inspection and our findings .are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations o:f procedures and representative records, interviews with
personnel, and observations by the inspector*s.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report.
This item will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to _submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you arid the results
achieved; (2) corrective steps which will be taken to avoid further noncompli-
ance; and (3) the date when full compliance will be achieved.
In accordance with Section 2. 790 of the NRC' s Rules oJ Practice," Part 2,
- Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
'inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, _it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the-basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary-.information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed i'1 t4e fublic Doc~~nt ~oom.
Virginia Electric and Power Company
-2-
APR 1 8 1980
Should you have any questions concerning this letter,*we will be glad to discuss
them with you.
Enclosures:
Sincerely,
{dpi~
v\\. Fuel Facility and Materials
Safety Branch
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/80-04
and 50-281/80-06
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883