APPENDIX A NOTICE OF VIOLATION Virginia Electric and Power Company Surry License Nos. DPR-32 and DPR-37 Based on the NRC inspection April 15-18, 1980, certain of your activities were apparently not conducted in full compliance with NRC requirements as indicated below.
These items have been categorized as described in correspondence to you dated December 31, 1974.
A.
As required by Section 3.21.G of the Technical Specifications, all penetration fire barriers protecting safety-related areas shall be functional at all B.
times.
With a penetration fire barrier non-funct_iona~_,. c1 _ ~_c;mtinl!-o~~-fi_* r_e ___ _
watch shall be established on at least one side of the affected penetration within one hour.
Contrary to the above, on April 17, 1980, the fire door in the penetration between the Unit 2 emergency switchgear room and the Unit 2 service building cable vault was blocked in the open position by an electrical cable.
This door was non-functional and a continuous fire watch had not been established on at least one side of the penetration.
This is an infraction and is applicable to Unit 2 (License No. DPR-37).
A similar item was brought to your attention in our letter dated November 27, 1979.
As required by Section 6.4.J of the Technical Specification, the facility fire protection program and implementing procedures which have been estab-lished for the station.shall be implemented.
The fire protection program procedure for the control of the hazards associated with welding operations are contained in VEPCO Procedure ADM-56 Special Processes Involving Ignition Sources.
Contrary to the above, on April 16, 1980 welding operations were being conducted on the two foot elevation of the auxiliary building without the welding and Flame Permit required by VEPCO Procedure ADM-56.
This is an infraction and is applicable to Unit 1.