ML18139A345
| ML18139A345 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/01/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18139A344 | List: |
| References | |
| NUDOCS 8006230114 | |
| Download: ML18139A345 (2) | |
See also: IR 05000280/1980008
Text
In Reply Refer
RII:WHM
50-280/80-08
50-281/80-09
To:
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
MAY - l 1980
Virginia Electric and Power Company
ATTN:
J. H. Ferguson
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr., of this office on
April 15-18, 1980 of activities authorized by NRC Operating License Nos. DPR-32
and DPR-37 for the Surry facility, and to the discussion of our findings held
with J. L. Wilson at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is discussed
in the enclosed report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
These items and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written sta.tement or explanation in reply
including:
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further noncompli-
ance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) ~elieve to be
proprietary, it is necessary that you make a written application within-20 days
to this office to withhold such information from public disclo~ure.
Any such
application must include a full statement of the reasons on the J:,asis of which
it is claimed that the information is proprietary, and should be-prepared so
that proprietary information identified in the application is contained in a
_separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
80062801 /~
Virginia Electric and Power Company
-2-
MAY - 1 1980
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/80-08
and 50-281/80-09
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883