Forwards IE Insp Repts 50-280/79-32 & 50-281/79-50 on 790611-13 & Notice of Violation
ML18130A626
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/03/1979
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18130A624 List:
References
NUDOCS 7909200231
Download: ML18130A626 (2)


See also: IR 05000280/1979032

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

In Reply Refer To:

JUL O 3 1979

RII:SCE

50-280/79-32

50-281/79-50

~'-*

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

This refers to the inspection conducted by S. C. Ewald of this office on June 11-13,

1979, of activities authorized by NRC Operating License Nos. DPR-32 and DPR-37

for the Surry Power Station Unit 1 and 2 facilities, and to the discussion of

our findings held with W. L. Stewart at the conclusion of the inspection.

The inspection was an examination of the activities conducted under your license

as they relate to radiation safety and to compliance with the Commission's rules

and regulations and the conditions of your license. The inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A. This notice is sent to you pursuant to the provisions of Section 2. 201

of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2. 790 of the NRC' s "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

  • ';I

,.

_

to this office to withhold.such information from public disclosure.

Any such

,~

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

. \\

!

790920 V

JUL O ~ 1979

Virginia Electric and Power Company

-2-

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

e~~

Fuel Facility and Materials

Safety Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-280/79-32

and 50-281/79-50

cc w/encl:

W. L. Stewart, Manager

P. 0. Box 315

Surry, VA

23883