UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
In Reply Refer To:
JUL O 3 1979
RII:SCE
50-280/79-32
50-281/79-50
~'-*
Virginia Electric and Power Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by S. C. Ewald of this office on June 11-13,
1979, of activities authorized by NRC Operating License Nos. DPR-32 and DPR-37
for the Surry Power Station Unit 1 and 2 facilities, and to the discussion of
our findings held with W. L. Stewart at the conclusion of the inspection.
The inspection was an examination of the activities conducted under your license
as they relate to radiation safety and to compliance with the Commission's rules
and regulations and the conditions of your license. The inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A. This notice is sent to you pursuant to the provisions of Section 2. 201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.201 requires you to submit to this office, within 20 days of your
receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2. 790 of the NRC' s "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
- ';I
,.
_
to this office to withhold.such information from public disclosure.
Any such
,~
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
. \\
!
790920 V
JUL O ~ 1979
Virginia Electric and Power Company
-2-
separate part of the document. If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
e~~
Fuel Facility and Materials
Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/79-32
and 50-281/79-50
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883