NRC FORM 366 (7-77)
- UPDATED REPORT LICENSEE EVENT REPORT
-* NUCLEAR R_EGULATORY COMMISSION CONTROL Bl ')CK: I 1
I I JG) 6 (PLEASE PRINT OR TYPE ALL REQUIRED lrJFORMATION)
~
I VI Al 81 Pl 81 1101 01 O!-l 01 °1°101 °1-101 °1G)l4lll 1 L~LU8l I IG) 7 8
9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYF~
- .J.0 *
. 57 CAT 58 CON'T [ITTI 7 * *-
8
~~~~~~ ~01 o I s I o I o ~, o I z I s I o 101 o I 3 I o I 9 I 7 I 9 _X-D I o I 7 I 3 I 1 I 7 I 9 I G) --
61 DOCKETNUMBER 68 69 El.'..:NTDATE
~;;.
REPORTDATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@.
. []Ji]* 1 The Architec.:..t-Engineer (AE) notified Vepco of possibJ.:.: non-conservatisms in the.:<*~
[2TIJ
((ill IIIT]
ITill
@El [III]
stress code used to ar,;:ilyze some piping systems at Surry.
Inaccurate valve weights. I were also identified in some instances.
The healtt and safety of the public was not affected.
This event is reported per Technical Specification 6.6.2.a.9.
7 8 9 80 filI]
I 9
SYSTEM CODE zl zl@
10 r,:;-.
LE R/RO CV ENT YE.A.Fl
~
REPORT I. 71 91 NUMBER 21 22
CAUSE
CAUSE CODE SUBCODE
~ ~@
11 12 13 SEQUENTIAL REPORT NO.
01 9 i COMPONENT CODE z1
~ z, z1 z1
- z, e 18 OCCURRENCE CODE I p ~*
23 24 26 27 28 29 COMP.
SUBCODE Lj@
19 REPORT TYPE
~
30 VALVE SUBCODE L:J@
20 L=:l 31 ACTION FUTURE EFFECT SHUTDOWN
~
ATTACHMENT NPRD-4 TAKEN ACT~N ON PLANT METHOD
'!fUR() R SUBMITTED FORMNUB.
PRIME COMP.
SUPP~R
~@LJ ~@ ~ I 0 1 I I I l:J@ LI 33 34 35 36 3 7 40 41 42 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS@
l_j@)
43 REVISION 32 [II9J I In reviewing the Beaver Valley piping design, the AE discovered an error in the pipe.
stress analysis and the valve weight used to analyze stress in some piping systems.
It was found 1:hat the discrepancy also applies to Surry.
Ari. evaluation of the problem!
is underway.
Both units are shutdown awaiting the results of the re-evaluation.
[ITIJ.__------------------------------~-~-__j 7
8 9
S.'.l Fs\\~.\\=L1t
% POWER OTHER STATUS @
~
LI@ I 1 1 ° I O l@I....__NA ____ __..
METHOD OF CJISCOVERY DISCOVERY DESCRIPTl*:)N 32
~(iv....__A_E~~~~~~~~~~~~~.....J 7
8 9
10 12 1'3 44 ACTIVITY CONTENT
~
RELE1ED OF RELEASE NA.MOUNT OF ACTIVITY *&.
C2E LJ@ ~@I
_=.__J 7
8 *9 10 11 44 45 46 80 NA LOCATION OF RELEASE @
PERSONNEL EXPOSURES
~
~UM?)ER O (:;:;\\ TYP_e DESCRIPTION~
[QI! I I I ~LJ@
8 9
11 12 1... 3----------------------.,..---------------'80 PERSONNEL INJURIES (4,'\\
~UM'ijR O DESCRIPTION~
ITliJ I I I@
'A 7
8 9
11 12 ________ "1":i-=9:----:8cc---::,3:-----=-~-----------------....J80 LOSS OF OR DAMAGE TO FACILITY '43' 0
T O. a O. 50 TYPE DESCRIPI,t,\\\\N
~
1~o...A_o*'-' /°(:,
~
L__:J~~I ~~~~~~~~--"'-==-~-=--=-~1_..)~*~~~~~~~~~~------'
7 7
8 9
10 so NRC USE ONL:Y PUBLICITY
~
TuJQ44 lDESCRlf.UQ~ 4.5News
~ r,l.:::::;_
v~~~
Releases dated 3-13-79 7
8 9
- 10.
_j I I I IJ I I I I I I I I ~
68 69 80; NAME OF PREPARER __ W_. _L_. __
S_t_e_w_a_r_t _________ _
PHONE:
(80!1)357-3184 0 a.* "
I~
Surry Power Docket Nos:
Report No:
Event Date:
50-280 & 50-281 79-004/0lX-l 03-09-79 UPDATED REPORT 1 & 2 Title of Report:
Pipe Stress Analysis Evaluation
- 1.
Description of Event
The Architect-Engineer (AE) notified VEPCO of possible non-conservatism in the pipe stress code used to analyze some piping systems at Surry.
Inaccu-rate valve weight~ were also identified in some instances.
The health and safety of the public were not affected.
This event is reported per Tech-nical Specification 6.6.2.a.9.
- 2.
Probable Consequences and Status of Redundant Systems:
Possible non-conservatisms are being investigated by the Architect Engineer to determine their extent and magnitude.
- 3.
Cause
In reviewing the Beaver Valley piping design, the AE discovered an error in the pipe stress analysis and the valve weight used to analyze stress in some piping systems.
It was found that the discrepancy also applies to Surry.
An evaluation of the problem is underway.
Both units are shutdown awaiting the results of the re-evaluation.
- 4.
Immediate Corrective Action
The immediate corrective action was to begin an investigation.to determine if the significance of any non-conservatisms are of sufficient magnitude to require corrective action.
Unit 2 was already shutdown for steam genera-tor repairs.
Unit 1 was shutdown pending the investigation of the di~-
crepancy.
- 5.
Subsequent Corrective Action:
Complete.analysis of the Unit No. 1 piping has revealed about 63 modifica-tions which must be made.
Partial analysis of the supports within these systems, which is about 50% complete at this time, has indicated thirty nine (39) support modifications are required. outlines the details of modifications completed through July 25, 1979.
- 6.
Future Corrective Action:
Analysis will continue and modifications will be made to assure any over-stress conditions are relieved.
Upon completion of the entire program a compiled list of all modifications made will be submitted as a followup report.
7, Generic Implications:
This event is applicable to Surry Units 1 and 2.
SLER:C2
~ '
r.....
UPDATED REPORT, page 1 of 2 Surry Power Station, Unit Nos. 1 & 2 Docket Nos:
50-280 & 50-281 Report No.:
79-004/0lX-1 Event-Date:
03-09-79 SYSTEM LHSI LHSI LHSI LHSI LHSI LHSI SW RHR LINE*NO.
10"-RH-16-1502 10"-RH-16-1502.
10"-RH-16-1502 10"-RH-16-1502 10"-SI-6-153 8"-SI-92-153 24"-WS-30-10 14"-RH-2-,-602 RHR 14"-irn-4-602 RHR 14"-RH-5-602 RHR 14"-RH-2-602 RHR 6"-RH-20-152
- RHR/LHSI 10"-RH-16-1502 RHR 4"-RH-15-152 RHR 4"-RH-15-152 RHR 4"-RH-15-152 CRS 10"-CS-3-153 CRS 10"-RS-13-153 CRS
.10"-RS-12-153
DESCRIPTION
Add Suppressor at Point #205 (New Hanger).
Modify VC/LC at Point #210 to VC.(Hanger H-29).
Modify VC/LC at Point #220 to VS (Hanger H-,-28).
Modify LC to VC at Point #200 (Hanger #30)
Modify Vertical Constraint to VC/LC at Point lf60.
Add Structural Braces to Support. SI-C-91.
Remove Support H-21~ to simplify calculation on existing Support (Gang Hanger) in PI;"oblem #636.
EW support overstressed at Point #85.
Add Vertical Constraint (VC).at Point #133 and delete Spring Hanger.
Add Vertical Shock Suppressor at Point #996.
Add Vertical Shock Suppressor at Point #1030.
Add Lateral Shock Suppressor at Point #130.
Delete NS-EW Restraint (U-Bolt) at Point #100.
Modify VS at Point #305 to VC.
Delete Rod Hanger at Point #32.
Delete Rod Hanger at Point lf3 7.
Delete N-S Restraint at Point #46.
Add Horizontal Shock Suppressor at Point #33.
Replace Spring Hanger at Point /1195 by Sway Strut.
Replace Rod Hanger at Point #160 by Spring Hanger H-32.
I
- , page 2 of 2 CRS CRS PSR SLER:C4 10"-RS-12-153 10"-RS-12-153 4"-RC-14-1502 Modify Supports #H29A (Prob. #562) and R29B (Prob. #546/5600) by adding Structural Members.
Add E-W Restraint at Point #140 (Hanger H-95).
Modify Anchor at Point #202 (R-36).
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000281/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000280/LER-1979-001, Forwards LER 79-001/01X-0 | Forwards LER 79-001/01X-0 | | | 05000280/LER-1979-001-01, /01X-0 on 790102:potential non-conservatism Noted in Calculations Performed in Monitoring Heat Flux Hot Channel Factor.Caused by Failure of Sys & Procedures Used for Relevant Surveillance.Input Values Adjusted | /01X-0 on 790102:potential non-conservatism Noted in Calculations Performed in Monitoring Heat Flux Hot Channel Factor.Caused by Failure of Sys & Procedures Used for Relevant Surveillance.Input Values Adjusted | | | 05000281/LER-1979-001-03, /03L-0 on 790112:personnel Batch Inner Door & Emergency Escape Manway Not Leak Tested within 72-h After Opening Because Escape Manway Safety Lock Believed Broken, Posing Hazard | /03L-0 on 790112:personnel Batch Inner Door & Emergency Escape Manway Not Leak Tested within 72-h After Opening Because Escape Manway Safety Lock Believed Broken, Posing Hazard | | | 05000281/LER-1979-002, Forwards LER 79-002/03L-0 & 79-003/03L-0 | Forwards LER 79-002/03L-0 & 79-003/03L-0 | | | 05000281/LER-1979-002-03, /03L-0 on 790120: During Normal Operation Channel Check Revealed That Pressurizer Pressure Channel I Drifted Above Tech Spec Limit as Compared to Channels II & Iii. Caused by Failure of Channel I Pressure Transmitter | /03L-0 on 790120: During Normal Operation Channel Check Revealed That Pressurizer Pressure Channel I Drifted Above Tech Spec Limit as Compared to Channels II & Iii. Caused by Failure of Channel I Pressure Transmitter | | | 05000280/LER-1979-002-03, /03L-0 on 790115:electrical Penetration Between Turbine Bldg & Emergency Switchgear Room Not Properly Sealed.Caused by Penetration Being Broken During Previous Implementation of Design Change | /03L-0 on 790115:electrical Penetration Between Turbine Bldg & Emergency Switchgear Room Not Properly Sealed.Caused by Penetration Being Broken During Previous Implementation of Design Change | | | 05000280/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000280/LER-1979-003-03, /03L-0 on 790124:error Detected in Calibr Procedures for Steam Flow Instrumentation.Caused by Error Made When Calibr Procedures Changed | /03L-0 on 790124:error Detected in Calibr Procedures for Steam Flow Instrumentation.Caused by Error Made When Calibr Procedures Changed | | | 05000280/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000281/LER-1979-003-03, /03L-0 on 790122: Following Containment Entrance Equipment Hatch Escape Airlock,Outer Door Was Not Proven Sealed within 72-h from Initial Opening.Caused by Problems in Sealing Exterior Hatch | /03L-0 on 790122: Following Containment Entrance Equipment Hatch Escape Airlock,Outer Door Was Not Proven Sealed within 72-h from Initial Opening.Caused by Problems in Sealing Exterior Hatch | | | 05000280/LER-1979-004, Update to LER 79-004/01X-2:on 790309,A/E Notified Util of Possible Nonconservatisms in Pipe Stress Code Used to Analyze Piping Sys & of Innaccurate Valve Weights Used by Error in Pipe Stress Analysis & Valve Weight | Update to LER 79-004/01X-2:on 790309,A/E Notified Util of Possible Nonconservatisms in Pipe Stress Code Used to Analyze Piping Sys & of Innaccurate Valve Weights Used by Error in Pipe Stress Analysis & Valve Weight | | | 05000280/LER-1979-004-01, /01X-1 on 790309:notification Received of Possible Errors in Pipe Stress Code Analyses in Some Facility Piping Sys.Inaccurate Value Weights Were Also Identified. Plants Are Shut Down Pending Evaluation | /01X-1 on 790309:notification Received of Possible Errors in Pipe Stress Code Analyses in Some Facility Piping Sys.Inaccurate Value Weights Were Also Identified. Plants Are Shut Down Pending Evaluation | | | 05000281/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000281/LER-1979-004-03, /03L-0 on 790204:setpoints of Seven Main Steam Safety Valves Not within Tech Spec Limits.Caused by Normal Setpoint Drift | /03L-0 on 790204:setpoints of Seven Main Steam Safety Valves Not within Tech Spec Limits.Caused by Normal Setpoint Drift | | | 05000280/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000281/LER-1979-005-03, /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203C Failed to Cycle Electrically.Caused by Slighting Bent Clutch Shaft in Valve Operation.Part Dismantled & Overhauled | /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203C Failed to Cycle Electrically.Caused by Slighting Bent Clutch Shaft in Valve Operation.Part Dismantled & Overhauled | | | 05000280/LER-1979-005-03, /03L-0 on 790226:radiation Recorder RR-175 Stopped Printing.Caused by Gummed Gear Shaft Bushing in Print Mechanism.Bushing Was Freed & Print Mechanism Cleaned & Lubricated | /03L-0 on 790226:radiation Recorder RR-175 Stopped Printing.Caused by Gummed Gear Shaft Bushing in Print Mechanism.Bushing Was Freed & Print Mechanism Cleaned & Lubricated | | | 05000280/LER-1979-006, Forwards LER 79-006/03L-0 | Forwards LER 79-006/03L-0 | | | 05000280/LER-1979-006-03, /03L-0 on 790309:fire Seals in Barrier Penetration Were Removed & Not Replaced.Leak Test Not Performed on Other Seals That Had Been Reinstalled.Caused by Inadequate Administrative Control | /03L-0 on 790309:fire Seals in Barrier Penetration Were Removed & Not Replaced.Leak Test Not Performed on Other Seals That Had Been Reinstalled.Caused by Inadequate Administrative Control | | | 05000281/LER-1979-006-03, /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203D Failed to Operate Electrically During Functional Test.Caused by Mechanical Binding of Valve.Valve Bearing Was Replaced | /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203D Failed to Operate Electrically During Functional Test.Caused by Mechanical Binding of Valve.Valve Bearing Was Replaced | | | 05000280/LER-1979-007-03, /03L-0 on 790320:w/unit Shutdown,Visual Insp Resulted in Declaring One Snubber Inoperable Because of Low Fluid Level.Caused by Leakage from Reservoir Fill Fitting. Snubber Removed & Rebuilt | /03L-0 on 790320:w/unit Shutdown,Visual Insp Resulted in Declaring One Snubber Inoperable Because of Low Fluid Level.Caused by Leakage from Reservoir Fill Fitting. Snubber Removed & Rebuilt | | | 05000280/LER-1979-007, Forwards LER 79-007/03L-0 | Forwards LER 79-007/03L-0 | | | 05000281/LER-1979-007-03, /03L-0 on 790205:during Functional Test,Damper 1-VS-103A Failed to Close on Train a Safety Injection Initiation.Caused by Hang Up in Brake Mechanism Holding Supply Damper Open Against Closed Spring.Damper Closed | /03L-0 on 790205:during Functional Test,Damper 1-VS-103A Failed to Close on Train a Safety Injection Initiation.Caused by Hang Up in Brake Mechanism Holding Supply Damper Open Against Closed Spring.Damper Closed | | | 05000281/LER-1979-008-03, During Surveillance Check,Found Deterioration of Piping on Low Portion of Recirculation Spray Subsystems.Caused by Chloride Stress Corrosion.Piping Replaced W/Nonsensitized Piping | During Surveillance Check,Found Deterioration of Piping on Low Portion of Recirculation Spray Subsystems.Caused by Chloride Stress Corrosion.Piping Replaced W/Nonsensitized Piping | | | 05000281/LER-1979-008, Forwards Updated LER 79-008/03X-1 | Forwards Updated LER 79-008/03X-1 | | | 05000280/LER-1979-008, Forwards LER 79-008/01T-0 | Forwards LER 79-008/01T-0 | | | 05000280/LER-1979-008-01, /01T-0 on 790323:during Load Study of 480 Volts Ac Emergency Bus,Discovered That an under-power Condition Could Exist for Postulated LOCA with or W/O Loss of Offsite Power. Caused by Design Deficiencies During Const | /01T-0 on 790323:during Load Study of 480 Volts Ac Emergency Bus,Discovered That an under-power Condition Could Exist for Postulated LOCA with or W/O Loss of Offsite Power. Caused by Design Deficiencies During Const | | | 05000280/LER-1979-009-01, /01T-0 on 790412:GE Informed Util That Potential Problem Exists in Inside Recirculation Spray Pump Motors.Caused by Possible Overheating of Lower Bearing Due to Clearance Tolerances Allowed on End Shields & Shaft | /01T-0 on 790412:GE Informed Util That Potential Problem Exists in Inside Recirculation Spray Pump Motors.Caused by Possible Overheating of Lower Bearing Due to Clearance Tolerances Allowed on End Shields & Shaft | | | 05000280/LER-1979-009, Forwards LER 79-009/01T-0 | Forwards LER 79-009/01T-0 | | | 05000281/LER-1979-009-03, /03L-0 on 790208:while Performing Penetrant Test 39B-1,mechanic Discovered 3 Snubbers Were Not on Test.Caused by Inadvertent Omission.Change Initiated to Add 3 Snubbers to Penetrant Test 39B-1 | /03L-0 on 790208:while Performing Penetrant Test 39B-1,mechanic Discovered 3 Snubbers Were Not on Test.Caused by Inadvertent Omission.Change Initiated to Add 3 Snubbers to Penetrant Test 39B-1 | | | 05000281/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000280/LER-1979-010-03, /03L-0 on 790323:while in Cold Shutdown, Discrepancies Found in Location & Configuration of Pipe Supports.Caused by Const Deficiencies & Util Maint.Necessary Repairs Will Be Made Prior to Startup | /03L-0 on 790323:while in Cold Shutdown, Discrepancies Found in Location & Configuration of Pipe Supports.Caused by Const Deficiencies & Util Maint.Necessary Repairs Will Be Made Prior to Startup | | | 05000280/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000281/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000281/LER-1979-010-03, /03L-0 on 790306:during tests,19 of 30 Snubbers Did Not Meet Acceptance Criteria.Caused by Setting Drift & non-readjustment to Optimum Settings After Previous Satisfactory Tests.Snubbers Readjusted,Repaired or Replaced | /03L-0 on 790306:during tests,19 of 30 Snubbers Did Not Meet Acceptance Criteria.Caused by Setting Drift & non-readjustment to Optimum Settings After Previous Satisfactory Tests.Snubbers Readjusted,Repaired or Replaced | | | 05000280/LER-1979-011-03, /03X-1 on 790828:process & Ventilation Particulates & Gaseous Monitors Were W/O Power on Two Occasions.Caused by Loose Lug Connection on Power Supply Cable.Loose Connection Repaired & Plants Restored to Svc | /03X-1 on 790828:process & Ventilation Particulates & Gaseous Monitors Were W/O Power on Two Occasions.Caused by Loose Lug Connection on Power Supply Cable.Loose Connection Repaired & Plants Restored to Svc | | | 05000280/LER-1979-011, Forwards LER 79-011/03X-1 | Forwards LER 79-011/03X-1 | | | 05000281/LER-1979-011, Forwards LER 79-011/12T-0 | Forwards LER 79-011/12T-0 | | | 05000281/LER-1979-011-12, /12T-0 on 790414:individual Received Excessive Dose While Inspecting Area Beneath Vessel.Caused by Elevated Radiation Levels Due to Incore Instrumentation Refueling Status.Individual Disciplined | /12T-0 on 790414:individual Received Excessive Dose While Inspecting Area Beneath Vessel.Caused by Elevated Radiation Levels Due to Incore Instrumentation Refueling Status.Individual Disciplined | | | 05000280/LER-1979-012-03, During Shutdown Functional Test of 74 Snubbers Revealed 21 Not Meeting Design Criteria.Caused by Snubbers Not Being Readjusted to Design Conditions.Units Reset | During Shutdown Functional Test of 74 Snubbers Revealed 21 Not Meeting Design Criteria.Caused by Snubbers Not Being Readjusted to Design Conditions.Units Reset | | | 05000280/LER-1979-012, Forwards Updated LER 79-012/03X-1 | Forwards Updated LER 79-012/03X-1 | | | 05000281/LER-1979-012, Forwards LER 79-012/08T-0 | Forwards LER 79-012/08T-0 | | | 05000281/LER-1979-012-08, /08T-0 on 790507:caustic Residue Discovered on 62 New Fuel Assemblies.Caused by Industrial Sabotage. Fuel Removed & Assemblies Rinsed.Investigation Continuing | /08T-0 on 790507:caustic Residue Discovered on 62 New Fuel Assemblies.Caused by Industrial Sabotage. Fuel Removed & Assemblies Rinsed.Investigation Continuing | | | 05000281/LER-1979-013, Forwards LER 79-013/01T-0 | Forwards LER 79-013/01T-0 | | | 05000281/LER-1979-013-01, /01T-0:on 791007,MOV-SW-202B Operated Mechanically & Electrically in Apparent Reverse Manner W/Unit at Cold Shutdown.Caused by Disc Spline of Svc Water Valve Improperly Aligned to Gear Train of Motor Operator | /01T-0:on 791007,MOV-SW-202B Operated Mechanically & Electrically in Apparent Reverse Manner W/Unit at Cold Shutdown.Caused by Disc Spline of Svc Water Valve Improperly Aligned to Gear Train of Motor Operator | | | 05000280/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000280/LER-1979-013-03, /03L-0 on 790410:100 Gallons Released from Boron Recovery Test Tank 1-BR-TK-2B Prior to Obtaining Sample Results.Caused by Improper Valve Lineup for Tank Recirculation in Preparation for Sampling | /03L-0 on 790410:100 Gallons Released from Boron Recovery Test Tank 1-BR-TK-2B Prior to Obtaining Sample Results.Caused by Improper Valve Lineup for Tank Recirculation in Preparation for Sampling | | | 05000280/LER-1979-014-03, /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Instrument Drift in High Alarm Setpoint.All Liquid Waste Releases Were Secured & Alarm Board Checked | /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Instrument Drift in High Alarm Setpoint.All Liquid Waste Releases Were Secured & Alarm Board Checked | | | 05000280/LER-1979-015-03, /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Procedural Inadequacy.Procedures Modified | /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Procedural Inadequacy.Procedures Modified | |
|