IE Insp Rept 50-281/79-33 on 790507-10.Noncompliance Noted: Failure to Maintain Receipts of Insp Results & to Follow Procedure Re Control of Welding Electrodes
ML18116A249
Person / Time
Site: Surry 
Issue date: 05/30/1979
From: Conlon T, Kleinsorge W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML18116A240 List:
References
50-281-79-33, NUDOCS 7908010721
Download: ML18116A249 (5)


See also: IR 05000281/1979033

Text

.

'

-

__ ...... _ .... __ ~~~*-. ---** ---~~-~, *. --t..,_,_......_, ___ -

__ ._ ..... ,.--...----... * .,. , ***.. - ....... -.-.1., .. ,_

, .... * _,._ .*

  • ~--.

-

-

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

Report No. 50-281/79-33

  • 101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

Licensee: Virginia Electric and Power Company

Richmond, Virginia 23261

Facility Name:

Surry Unit 2

Docket No. 50-281

License No.

DPR-37

Inspection at Surry Site near Williamsburg, Virginia

Inspector~~ ~~,>I/

~

W. P. Kleinsorge

Approved b~c ~ J~

T. E. Conlon, Section Chief, RCES Branch

SUMMARY

Inspection on May 7-10, 1979

Areas Inspected

This routine, unannounced inspection involved 30 inspector-hours onsite in the

area of steam generator replacement welding activities.

Results

Of the one area inspected, two apparent items of noncompliance were found.

(Infraction - Failure to follow procedure in control of welding electrodes

(Paragraph 6i)) and (Deficiency - Failure to maintain receipt inspection results

paragraph 6k) *

'i\\908010 7~ /

J

. '

-

  • --
  • -*---~ *,_. ___ *
    • ~----

"**-**"*-* L *-*-'--**'-* __ * .___**ti:'-*"***<" -<*-**.°*~'I;-.** ..-..~.*--"-,~*~-,._ *,*.

"~-

  • --" **-"* ...... ** ~ *,*

~-. *** *~***

e

1.

Persons Contacted

Licensee Employees

W. L. Stewart, Station Manager

DETAILS

  • A. L. Parrish, III, Project Manager, SGRP

J.B. Goodson, Resident QC Engineer

W. L. Byrd, Supervisor, Welding Construction

  • C. W. Embler, Staff Engineer, Welding
  • D. Kildoo, Station QC

e

Other licensee employees contacted included five construction craftsmen and

three technicians.

Other Organizations

Daniel Construction Company (DCC)

J. Latimer, Project Welding Engineer

NRC Resident Inspector

D. J. Burke

  • Attended exit interview ..

2~

Exit Interview

The inspection scope and findings were summarized on May 10, 1979, with

those persons indicated in Paragraph 1 above .. The items of noncompliance

described in paragraph numbers 6(i) and 6(k) were discussed in detail. The

inspector indicated that there would be three items of noncompliance. Upon

discussion with regional office supervision, it was decided that two items

would be cited.

VEPCO was informed .via the resident inspector on May 16,

1979.

3.

Licensee Action on Previous Inspection Findings

Not inspected.

4.

Unresolved Items

Unresolved items were not identified during this inspection .

J

-- -**---*--*-----.. -- --~~---* ---***------ --------*---~*--****-. --~--*--~--**"-- *-**

5.

e

-2-

Independent Inspection Effort

a.

The inspector conducted a general inspection of the auxiliary building,

the containment, the refurbishment building and the fuel building to

observe construction progress and construction activities such as

steam generator lifting, tilting, and removal, weld joint preparation,

radiation control, washdown of new fuel, material handling and control,

housekeeping and storage.

b.

The inspector witnessed the radiographic examination, in accordance

with ASME Section III and V, 1974 Edition with Addenda through Winter

1976, of Weld No. 1 on ISO ETA 40007-3-U2B.

The inspector observed

setup and exposure activities to determine if the code requirements

were being met. Areas being reviewed included minimum source to film

distance, type and thickness of intensifying screens, use of location

markers, selection and use of penetrometers and base material and weld

surface condition.

c.

(Closed) Inspection Followup Item 50-281/79-23-01. This item concerned

a nonessential variable (contact tip to work distance) that had not

been covered in Technique Sheet 8-8-D-13 of DCC Welding Procedure 8-8

Revision 2, as required by ASME Section IX.

The inspector verified

that the above procedure Technique Sheet has been revised to include

the variable in question.

No items of noncompliance or deviations were identified.

6.

Steam Generator Replacement Observation of Welding and Associated Activities

The applicable code as required by "VEPCO' s licensee submittal (Steam

Generator Project Surry Power Station Unit Nos. 1 and 2, Revision 9)," is

ASME Section XI, 1974 Edition with Addenda through the Winter of 1976.

Based on paragraph IWA-7000 of section XI, VEPCO is ti.sing the original

construction code (USAS B31.1.0-1967) for pipe welding. Welder qualifica-

tions and procedure qualifications are being performed in accordance with

the latest edition and addenda of ASME section IX in effect at the time of

the qualification. All welding materials were purchased and certified in

accordance with Class I requirements of the ASME code.

In connection with completed Weld No. 1 on ISO ETA 40007-3-U2B prior to

final NDE the inspector observed activities and facilities in the level A

and B warehouse, and welding material control issue stations and reviewed

the Quality Control Manual, w~lding procedures, and selected procurement,

certification, inspection, qualificatlon and issue records to complete the

following inspections.

a.

The inspector verified that welding personnel were qualified by DCC in

accordance with the requirements of ASME Section IX and additional

requirements of ASME Section XI.

..

b.

e

-3-

The inspector verified that new base material and welding filler

materials were certified to meet code and other specification require-

ments.

c.

The inspector reviewed receiving records and certifications to assure

that consumable inserts, bare wire and coated electrodes for manual

welding met the applicable code.

d.

The inspector verified that suitable facilities were provided and

maintained for storage of electrodes, flux and other materials for DCC

and VEPCO.

e.

The inspector verified that dispensing of electrodes was controlled by

DCC so that no mixups could occur and exposure of unused electrodes to

moisture pickup is minimized.

f.

The inspector verified that unused welding filler material was returned

and properly dispositioned to either holding or drying ovens.

The

inspector further verified that damaged electrodes and stubs were

scrapped and removed in containers from the work area at the end of

each shift. The above was verified for DCC only.

g.

The inspector verified, for DCC only, that dispensing of weld filler

materials was done only by withdrawal forms, which identify the type

and quantity of material.

The inspector further verified that the

welder was identified on this form and that an authorizing signature

is required.

h.

The inspector verified the existance of an adequate DCC procedure for

the identification and resolution of defects disclosed by NDE methods.

i.

As required by Criterion V of Appendix B to 10 CFR 50 and as implemented

by VEPCO Topical Report VEP-1-A, amendment three, paragraph 17.2.5,

requires that activities affecting quality shall be prescribed by

documented procedures, and shall be accomplished in accordance with

these procedures.

Daniel Construction Company Construction Procedure

(DCC-CP) WP-502, Revision 1, "Control of Welding Filler Material",

requires that field electrode control station attendants attach a

sketch to the front of each electrode holding oven specifying the

size, class, lot and location of the covered electrodes in that oven.

Further DCC-CP WP-502 Revision 1 requires field. electrode control

stations to be securred to prevent unauthorized access.

Contrary to the above, the following examples were observed:

1.

On May 8, 1979 the sketch on the electrode holding oven in the

refurbishment building contained an incorrect lot number.

For

Lot No. 02*2-B905R, 1/8 inch diameter type E-7018 electrodes, the

first diget was erroneously entered as 9 vice 0. This error was

prepogated to eight "Field Requisition - Welding Materials" W-100

forms.

2.

3.

e

e

-4-

On May 10, 1979 the key to the above locked oven was in the

possession of an individual not authorized by DCC-CP-WP-502 to

possess the key.

On May 10, 1979 the electrode location and identification sketch

for the above oven reflected no electrodes on the center shelf

when in fact the center shelf contained electrodes.

This is an infraction and is identified by noncompliance number

281/79-33-01.

j.

The following corrective actions for noncompliance identified in

paragraph 6(i) above were verified by the inspector:

1.

Investigation revealed there to be only one lot of 1/8 inch

diameter type E-7018 electrodes on the site. In view of this

fact, the eight "W-100" forms and the sketch were corrected.

2.

DCC put the electrode holding oven key into the hands of a properly

authorized individual.

3.

It was determined, by printed control numbers on each electrode,

that the electrodes on the center shelf of the holding oven were

of the same lot as the lower shelf. in view of this fact, the

location sketch was corrected to reflect the true oven contents.

k.

As required by Criterion XVII of 10 CFR SO, and as implemented by

VEPCO Topical Report VEP-1-A, amendment three paragraph 17.2.17, that

requires sufficient records shall be maintained to furnish evidence of

activities affecting quality and that these records include results of

inspections.

Contrary to the above, on May 8, 1979, five "Receipt inspiction Report"

forms had the following boxes not marked:

"No Shipping Damage",

"Properly Packaged", "Cleanliness Satisfactory", and "Properly Identified".

These reports were found in the following purchase order files:

SGR-12188, SGR-12391, and SGR-12609.

This is a deficiency and is identified by noncompliance number 281/79-

33-02 .