ML18116A244

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-281/79-33 on 790507-10 & Notice of Violation
ML18116A244
Person / Time
Site: Surry Dominion icon.png
Issue date: 06/04/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18116A240 List:
References
NUDOCS 7908010709
Download: ML18116A244 (2)


See also: IR 05000281/1979033

Text

._.-*. _: .**.. ....-,}.>-~-... .. < ... ~,.* __ ..,_. _ ........ ~* ..<p.. *-- L*.__.__.....,::. ***-.--...' .:... - ,_. O<>.,.-.~--

. .._ ..... -** _._,. -'~- --

'

  • ~

e

-

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

JUN

4 l979

In Reply Refer To:

RII:WPK

50-281/79-33

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

Richmond, VA

23261

Gentlemen:

This refers to the inspection conducted by W. P. Kleinsorge of this office

on May 7-10, 1979 of activities authorized by NRC Operating License No. DPR-37

for the Surry 2 facility, and to the discussion of our findings held with

A. L. Parrish, III at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted

of selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with NRC requirements.

These items

and references to pertinent requirements are listed in the Notice of

Violation enclosed herewith as Appendix A.

This notice is sent to you

pursuant to the provisions of Section 2.201 of the NRC's "Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you

to submit to this office, within 20 days of your receipt of this notice, a

written statement or explanation in reply including:. (1) corrective steps

which have been taken by you and the results achieved; (2) corrective steps

which will be taken to avoid further noncompliance; and (3) the date when

full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must include a full statement of the

reasons on the basis of which it is claimed that the information is

proprietary, and should be prepared so that proprietary information

identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified

period, the report will be placed in the Public Document Room.

- --- --- ----

., ~-.... -...

..

L

e

-

JUN

4 T97~

Virginia Electric and Power

-2-

Company

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-281/79-33

cc w/encl:

W. L. Stewart, Manager

P. 0. Box 315

Surry, VA

23883

4;.-*