Text
In Reply Refer To:
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
MAY 1 8 1979
Rll:DHC
50-280/79-14
50-281/79-20
Virginia Electric and Power Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P.O. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by D. H. Collins of this office on
Harch 20-23, 1979, of activities authorized_ by NRC License Nos. DPR-32 and
DPR-37 for the Surry facility, and to the discussion of our findings held
with W. L. Stewart at the conclusion of the inspection.
The inspection was an examination of the activities conducted under your
license as they relate to radiation safety and to compliance with the
Co11111ission's rules and regulations and the conditions of your license. The
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These items and
references to pertinent requirements are listed in the Notice of Violation
enclosed herewith as Appendix A.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10,
Code of Federal Regulations.
Section 2.201 requires you to submit to this
office, within 20 days of your receipt of this notice, a-written statement or
explanation in reply including:
(1) corrective steps which have been taken
by you and the results achieved; (2) corrective steps which will be taken to
avoid further noncompliance; and (3) the date when full compliance will be
achieved.
nuring the inspection it was found that certain activities under your license
-appear to deviate from coamitments to the Co11111ission and have safety significance.
This item is identified in the Notice of Deviation enclosed herewith as
Appendix B.
Please provide us in writing within 20 days of your receipt of
this letter your c0D1Dents including a description of corrective actions that
have been or will be taken, corrective actions which will be taken to avoid
further deviations, and the date corrective actions were or will be completed.
In accordance with Section 2. 790 of the NRC' s "Rules of Practice,"
Title 10, Code of Federal Regulations, a copy of this letter and the
inspection report will be placed in the NRC's Public Document Room.
Part 2,
enclosed
If thi~
'7 9 0726 OOO'f
I
Virginia Electric and Power Company
-2-
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20
days to this office to withhold such information from public disclosure.
Any
such application must include a full statement of the reasons on the basis of
which it is claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is contained in
a separate part of the document. If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Enclosures:
Sincerely,
ef.V: ~~L,(_
'i. T. Sutherland, Chief
Fuel Facility and Materials
Safety Branch
1 .. Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
Inspection Report Nos. 50-280/79-14
and 50-281/79-20
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883
MAY
.1 8 1979