e VIRGINIA ELECTRIC AND PoWER COMPANY RICHMOND, VIRGINIA 2 3 2 61
}ir. Jaine.a P. O'Reilly~ Director Office of Inspection and Enforce:itent F. s. ~-;uclear Regulatory Commission R~gion II 101 liarietta Street, Suite 3100 Atlanta, Georgia 30303
Dear tr. O'Reilly:
Serial lfo. 398 PO/F:i.T: haw Docket No. 5(*-280 50-281 License No. [PR-32 DPR-37 Pursuant to Surry Power Station Teclu1ical Specifications, and IE Bulletin 79-01, Environmental Qualification of Class IE Equipment, the Virginia Electric and Fover Company hereby submits the following Licensee Event Report for Surry L'nit ~;O
LER 79-018/0lT-O Applicable P.eporting Requirenent IE Bulletin 79-01 and T. S
Thia report has been reviewed by the Station Nuclear Safety and Operating Committee.and ~ill be placed on the agenda for the next ~eeting of the System i:-iuclear Safety and Operating Cor.i::iittee.
Enclosures (3 copies)
Very truly yours, C. }!. Stalling;,
Vice PreoidP,1t-Po,rer Supply and Production Operations cc: hr. John G. Davis, Acting Director (40 copies}
Office of Inspection and Enforcement
'.'!r. Willia~ G. HcDonalc!, Director (3 copies)
Office of ~(anagenent Infor,,,..sticn llnd Pro;ra;;; Control
NRC (7-7-7*).
iV1 :,Q6 CONTROL BLOCK:
l
- LICENSEE EVENT REPORT l I I I I I I I G)
(PLEASE PRINT OR TY.LL REQUIRED INFORMATION) 6 EGJ lv!Alsl-rlsl, !G)la la 1-loJn;la*la lo.I lo lo 1014111111!,101 I 10 7
8 9
LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE 30 5T CAT 58 CON'T [TIJJ 7
8
- ~~~~~ W© I o I s I ol o I o I 2 I s I o 101 o I s I a I 9 '7 I g I@ I a I s I ? I 1 '7 I 9 I G) 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
[QJIJ I The Architect Engineer has i denti fi ed Sol euoi_d Valve, Madel #832QAJ 02, m<>rn1-factured by I
@II] I Automatic Switch Company, as being environmentally unqualified and reportable as pe:!:.___J
~
I I.E.Bulletin 79-01 and Technical Specification 6.6.2.b.(9).
The valve could fail to
~
I control the admission and venting of operating air for the inside containment trip
~
!valves on steam generator blowdown lines during a LOCA.
The fully redundant outside DC[IJ I containment trip valves Would have provided containment isolation, if required,
~
I Therefore, the health and safety of the public were not affected.
7 8 9 SYSTEM CODE
~
Is lu I@
7 8
9 10
/;:;\\
LE R/RO CV ENT YEAR
'-'.J' ~J~~~~ I 1 I 9 I 21 22
CAUSE
CAUSE COMP.
CODE SUSCODE COMPONENT CODE LBJ@ LBJ@ Iv IA Ir. I v I o I P I@
SUBCODE W
11 l.=J 12 13 SEQUENTIAL REPbRT NO.
Io I, I a I 18 19*
OCCU~RENCE REPORT CODE TYPE
_1,.,...-1 lol,1 LIJ 23 24 26 27 28 29 30 VALVE SUSCODE w@
- 20 L=1 31 ACTION FUTURE EFFECT SHUT*DOWN r:;::;.,.
ATTACHMENT NPRD-4 TAKEN ACTION ON PLANT METHOD HOURS SUBMITTED FORM SUB.
PRIME COMP.
SUPPLIER REVISION NO. w 32 COMPONENT MANUFACTURER I
80 lA_J@ILJ@
LL!@
Lz.J I. ol ol ol ol LY.l@
WC§ 33 34 35 36 3 7 40 41
/
42 W@
IA 16 I 1 JO I@
CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @
43 44 47 CIII] !The solenoid valves, Model f/8320A102, were identified as being similar to a solenoid l
[iJJJ !valve that failed environmental testing for the LOCA environment.
The-three affecteq I o::J2J ion each unit will be replaced with environmentally qualified valves.
ITTIJ ITE1 7
8 9
FACILITY STATUS
% POWER OTHER STATUS @
[QI] w@ j O j O j O l@)I NA 8
9 10 12 11 44 ACTIVITY CONTENT Q\\
RELEASED OF RELEASE AMOUNT OF ACTIVITY ITEl w @) ul(§) I NA I
8 9
10 11 7
44 PERSONNEL EXPOSURES
. r:;;;,.
80 METHOD OF A
C>ISCOVERY DISCOVERY DESCRIPTION \\::31 l.lu@l Notification from AE I
45 46 80 LOCATION OF RELEASE@
NA 45 80 NUMBER TYPE Cc:SCRiPTION ~
[IEJ l o b l oJ@W@..___* _...,_NA..,__ _____ ~------------------'
7 8
9 11 12 13 80 PERSONNEL INJURIES Q
NUMBER DESCRIPTION~
[IE] I o I o I o l@L-----....il£:l,-----------~----'----------'
7 8
9 11 12 LOSS OF OR DAMAGE TO FACILITY '43\\
TYPE
DESCRIPTION
v:.:;;
80 ETIJ W@
NA 7
8 9
10 so PUBLICITY
'45\\
NRC USE ONL y ISSUED DESCRIPTION~
~
ITEJ we I I I I I I I I I I I I 1. ~
8 9
10 68 69 NAMEOFPREPARER w. L. Stewart PHONE:
(804) 357-3184
. 80 ;
0 a.
t.,*
(Attachment, page 1 of 1)
Surry Power Station, Unit Docket No: 50~280, 281 Report No: 79-018/0lT-0 Event Date:
05-09-79 1, 2 l e
+
Environmentally Unqualified Solenoid Valve (SOV-BD-lOOA,B,G and 200A,B,C)
- 1.
Description of Event
The Architect Engineer has identified a solenoid valve, Model #8320Al02, manufactured by Automatic Switch Company, as being erivironmentally *unqualified for the conditions stated in I.E. Bulletin No. 79-01.
Six valves were identified, three in each of Surry Units 1 and 2.
- 2.
Probable Consequences and Status of Redundant Systems:
The solenoid valve could fail to function properly following a Loss of Coolant Accident.
These valves control the admission and venting of operating air for the containment trip valves on steam generator blowdown lines.
The ful1y redundant outside containment trip valves would have provided containment isolation, if required.
Therefore, the health and safety of the public were not affected.
- 3.
Cause
The solenoid valves, Model #8320Al02, were identified as being similar k.-
to another solenoid valve *that failed environmental testing.
I.
I I
I
- 4.
Lmmediate Corrective Action:
A search was initiated to locate environmentally qualified solenoid
- 5.
Subsequent Corrective Action:
The subsequent corrective action will be the replacement of the present solenoid valves with environmentally qualified solenoid valves.
- 6.
Action Taken to Prevent Recurrence:
- 7.
No additional actions are deemed necessary.
The solenoid valves are being replaced.
Generic Implications:
Environmental qualifications of other electrical components will be addressed in the response tci IE Bulletin No. 79-01 *.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000281/LER-1979-001, Forwards LER 79-001/03L-0 | Forwards LER 79-001/03L-0 | | | 05000280/LER-1979-001, Forwards LER 79-001/01X-0 | Forwards LER 79-001/01X-0 | | | 05000280/LER-1979-001-01, /01X-0 on 790102:potential non-conservatism Noted in Calculations Performed in Monitoring Heat Flux Hot Channel Factor.Caused by Failure of Sys & Procedures Used for Relevant Surveillance.Input Values Adjusted | /01X-0 on 790102:potential non-conservatism Noted in Calculations Performed in Monitoring Heat Flux Hot Channel Factor.Caused by Failure of Sys & Procedures Used for Relevant Surveillance.Input Values Adjusted | | | 05000281/LER-1979-001-03, /03L-0 on 790112:personnel Batch Inner Door & Emergency Escape Manway Not Leak Tested within 72-h After Opening Because Escape Manway Safety Lock Believed Broken, Posing Hazard | /03L-0 on 790112:personnel Batch Inner Door & Emergency Escape Manway Not Leak Tested within 72-h After Opening Because Escape Manway Safety Lock Believed Broken, Posing Hazard | | | 05000281/LER-1979-002, Forwards LER 79-002/03L-0 & 79-003/03L-0 | Forwards LER 79-002/03L-0 & 79-003/03L-0 | | | 05000281/LER-1979-002-03, /03L-0 on 790120: During Normal Operation Channel Check Revealed That Pressurizer Pressure Channel I Drifted Above Tech Spec Limit as Compared to Channels II & Iii. Caused by Failure of Channel I Pressure Transmitter | /03L-0 on 790120: During Normal Operation Channel Check Revealed That Pressurizer Pressure Channel I Drifted Above Tech Spec Limit as Compared to Channels II & Iii. Caused by Failure of Channel I Pressure Transmitter | | | 05000280/LER-1979-002-03, /03L-0 on 790115:electrical Penetration Between Turbine Bldg & Emergency Switchgear Room Not Properly Sealed.Caused by Penetration Being Broken During Previous Implementation of Design Change | /03L-0 on 790115:electrical Penetration Between Turbine Bldg & Emergency Switchgear Room Not Properly Sealed.Caused by Penetration Being Broken During Previous Implementation of Design Change | | | 05000280/LER-1979-002, Forwards LER 79-002/03L-0 | Forwards LER 79-002/03L-0 | | | 05000280/LER-1979-003-03, /03L-0 on 790124:error Detected in Calibr Procedures for Steam Flow Instrumentation.Caused by Error Made When Calibr Procedures Changed | /03L-0 on 790124:error Detected in Calibr Procedures for Steam Flow Instrumentation.Caused by Error Made When Calibr Procedures Changed | | | 05000280/LER-1979-003, Forwards LER 79-003/03L-0 | Forwards LER 79-003/03L-0 | | | 05000281/LER-1979-003-03, /03L-0 on 790122: Following Containment Entrance Equipment Hatch Escape Airlock,Outer Door Was Not Proven Sealed within 72-h from Initial Opening.Caused by Problems in Sealing Exterior Hatch | /03L-0 on 790122: Following Containment Entrance Equipment Hatch Escape Airlock,Outer Door Was Not Proven Sealed within 72-h from Initial Opening.Caused by Problems in Sealing Exterior Hatch | | | 05000280/LER-1979-004, Update to LER 79-004/01X-2:on 790309,A/E Notified Util of Possible Nonconservatisms in Pipe Stress Code Used to Analyze Piping Sys & of Innaccurate Valve Weights Used by Error in Pipe Stress Analysis & Valve Weight | Update to LER 79-004/01X-2:on 790309,A/E Notified Util of Possible Nonconservatisms in Pipe Stress Code Used to Analyze Piping Sys & of Innaccurate Valve Weights Used by Error in Pipe Stress Analysis & Valve Weight | | | 05000280/LER-1979-004-01, /01X-1 on 790309:notification Received of Possible Errors in Pipe Stress Code Analyses in Some Facility Piping Sys.Inaccurate Value Weights Were Also Identified. Plants Are Shut Down Pending Evaluation | /01X-1 on 790309:notification Received of Possible Errors in Pipe Stress Code Analyses in Some Facility Piping Sys.Inaccurate Value Weights Were Also Identified. Plants Are Shut Down Pending Evaluation | | | 05000281/LER-1979-004, Forwards LER 79-004/03L-0 | Forwards LER 79-004/03L-0 | | | 05000281/LER-1979-004-03, /03L-0 on 790204:setpoints of Seven Main Steam Safety Valves Not within Tech Spec Limits.Caused by Normal Setpoint Drift | /03L-0 on 790204:setpoints of Seven Main Steam Safety Valves Not within Tech Spec Limits.Caused by Normal Setpoint Drift | | | 05000280/LER-1979-005, Forwards LER 79-005/03L-0 | Forwards LER 79-005/03L-0 | | | 05000281/LER-1979-005-03, /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203C Failed to Cycle Electrically.Caused by Slighting Bent Clutch Shaft in Valve Operation.Part Dismantled & Overhauled | /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203C Failed to Cycle Electrically.Caused by Slighting Bent Clutch Shaft in Valve Operation.Part Dismantled & Overhauled | | | 05000280/LER-1979-005-03, /03L-0 on 790226:radiation Recorder RR-175 Stopped Printing.Caused by Gummed Gear Shaft Bushing in Print Mechanism.Bushing Was Freed & Print Mechanism Cleaned & Lubricated | /03L-0 on 790226:radiation Recorder RR-175 Stopped Printing.Caused by Gummed Gear Shaft Bushing in Print Mechanism.Bushing Was Freed & Print Mechanism Cleaned & Lubricated | | | 05000280/LER-1979-006, Forwards LER 79-006/03L-0 | Forwards LER 79-006/03L-0 | | | 05000280/LER-1979-006-03, /03L-0 on 790309:fire Seals in Barrier Penetration Were Removed & Not Replaced.Leak Test Not Performed on Other Seals That Had Been Reinstalled.Caused by Inadequate Administrative Control | /03L-0 on 790309:fire Seals in Barrier Penetration Were Removed & Not Replaced.Leak Test Not Performed on Other Seals That Had Been Reinstalled.Caused by Inadequate Administrative Control | | | 05000281/LER-1979-006-03, /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203D Failed to Operate Electrically During Functional Test.Caused by Mechanical Binding of Valve.Valve Bearing Was Replaced | /03L-0 on 790204:at Cold Shutdown,Valve MOV-SW-203D Failed to Operate Electrically During Functional Test.Caused by Mechanical Binding of Valve.Valve Bearing Was Replaced | | | 05000280/LER-1979-007-03, /03L-0 on 790320:w/unit Shutdown,Visual Insp Resulted in Declaring One Snubber Inoperable Because of Low Fluid Level.Caused by Leakage from Reservoir Fill Fitting. Snubber Removed & Rebuilt | /03L-0 on 790320:w/unit Shutdown,Visual Insp Resulted in Declaring One Snubber Inoperable Because of Low Fluid Level.Caused by Leakage from Reservoir Fill Fitting. Snubber Removed & Rebuilt | | | 05000280/LER-1979-007, Forwards LER 79-007/03L-0 | Forwards LER 79-007/03L-0 | | | 05000281/LER-1979-007-03, /03L-0 on 790205:during Functional Test,Damper 1-VS-103A Failed to Close on Train a Safety Injection Initiation.Caused by Hang Up in Brake Mechanism Holding Supply Damper Open Against Closed Spring.Damper Closed | /03L-0 on 790205:during Functional Test,Damper 1-VS-103A Failed to Close on Train a Safety Injection Initiation.Caused by Hang Up in Brake Mechanism Holding Supply Damper Open Against Closed Spring.Damper Closed | | | 05000281/LER-1979-008-03, During Surveillance Check,Found Deterioration of Piping on Low Portion of Recirculation Spray Subsystems.Caused by Chloride Stress Corrosion.Piping Replaced W/Nonsensitized Piping | During Surveillance Check,Found Deterioration of Piping on Low Portion of Recirculation Spray Subsystems.Caused by Chloride Stress Corrosion.Piping Replaced W/Nonsensitized Piping | | | 05000281/LER-1979-008, Forwards Updated LER 79-008/03X-1 | Forwards Updated LER 79-008/03X-1 | | | 05000280/LER-1979-008, Forwards LER 79-008/01T-0 | Forwards LER 79-008/01T-0 | | | 05000280/LER-1979-008-01, /01T-0 on 790323:during Load Study of 480 Volts Ac Emergency Bus,Discovered That an under-power Condition Could Exist for Postulated LOCA with or W/O Loss of Offsite Power. Caused by Design Deficiencies During Const | /01T-0 on 790323:during Load Study of 480 Volts Ac Emergency Bus,Discovered That an under-power Condition Could Exist for Postulated LOCA with or W/O Loss of Offsite Power. Caused by Design Deficiencies During Const | | | 05000280/LER-1979-009-01, /01T-0 on 790412:GE Informed Util That Potential Problem Exists in Inside Recirculation Spray Pump Motors.Caused by Possible Overheating of Lower Bearing Due to Clearance Tolerances Allowed on End Shields & Shaft | /01T-0 on 790412:GE Informed Util That Potential Problem Exists in Inside Recirculation Spray Pump Motors.Caused by Possible Overheating of Lower Bearing Due to Clearance Tolerances Allowed on End Shields & Shaft | | | 05000280/LER-1979-009, Forwards LER 79-009/01T-0 | Forwards LER 79-009/01T-0 | | | 05000281/LER-1979-009-03, /03L-0 on 790208:while Performing Penetrant Test 39B-1,mechanic Discovered 3 Snubbers Were Not on Test.Caused by Inadvertent Omission.Change Initiated to Add 3 Snubbers to Penetrant Test 39B-1 | /03L-0 on 790208:while Performing Penetrant Test 39B-1,mechanic Discovered 3 Snubbers Were Not on Test.Caused by Inadvertent Omission.Change Initiated to Add 3 Snubbers to Penetrant Test 39B-1 | | | 05000281/LER-1979-009, Forwards LER 79-009/03L-0 | Forwards LER 79-009/03L-0 | | | 05000280/LER-1979-010-03, /03L-0 on 790323:while in Cold Shutdown, Discrepancies Found in Location & Configuration of Pipe Supports.Caused by Const Deficiencies & Util Maint.Necessary Repairs Will Be Made Prior to Startup | /03L-0 on 790323:while in Cold Shutdown, Discrepancies Found in Location & Configuration of Pipe Supports.Caused by Const Deficiencies & Util Maint.Necessary Repairs Will Be Made Prior to Startup | | | 05000280/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000281/LER-1979-010, Forwards LER 79-010/03L-0 | Forwards LER 79-010/03L-0 | | | 05000281/LER-1979-010-03, /03L-0 on 790306:during tests,19 of 30 Snubbers Did Not Meet Acceptance Criteria.Caused by Setting Drift & non-readjustment to Optimum Settings After Previous Satisfactory Tests.Snubbers Readjusted,Repaired or Replaced | /03L-0 on 790306:during tests,19 of 30 Snubbers Did Not Meet Acceptance Criteria.Caused by Setting Drift & non-readjustment to Optimum Settings After Previous Satisfactory Tests.Snubbers Readjusted,Repaired or Replaced | | | 05000280/LER-1979-011-03, /03X-1 on 790828:process & Ventilation Particulates & Gaseous Monitors Were W/O Power on Two Occasions.Caused by Loose Lug Connection on Power Supply Cable.Loose Connection Repaired & Plants Restored to Svc | /03X-1 on 790828:process & Ventilation Particulates & Gaseous Monitors Were W/O Power on Two Occasions.Caused by Loose Lug Connection on Power Supply Cable.Loose Connection Repaired & Plants Restored to Svc | | | 05000280/LER-1979-011, Forwards LER 79-011/03X-1 | Forwards LER 79-011/03X-1 | | | 05000281/LER-1979-011, Forwards LER 79-011/12T-0 | Forwards LER 79-011/12T-0 | | | 05000281/LER-1979-011-12, /12T-0 on 790414:individual Received Excessive Dose While Inspecting Area Beneath Vessel.Caused by Elevated Radiation Levels Due to Incore Instrumentation Refueling Status.Individual Disciplined | /12T-0 on 790414:individual Received Excessive Dose While Inspecting Area Beneath Vessel.Caused by Elevated Radiation Levels Due to Incore Instrumentation Refueling Status.Individual Disciplined | | | 05000280/LER-1979-012-03, During Shutdown Functional Test of 74 Snubbers Revealed 21 Not Meeting Design Criteria.Caused by Snubbers Not Being Readjusted to Design Conditions.Units Reset | During Shutdown Functional Test of 74 Snubbers Revealed 21 Not Meeting Design Criteria.Caused by Snubbers Not Being Readjusted to Design Conditions.Units Reset | | | 05000280/LER-1979-012, Forwards Updated LER 79-012/03X-1 | Forwards Updated LER 79-012/03X-1 | | | 05000281/LER-1979-012, Forwards LER 79-012/08T-0 | Forwards LER 79-012/08T-0 | | | 05000281/LER-1979-012-08, /08T-0 on 790507:caustic Residue Discovered on 62 New Fuel Assemblies.Caused by Industrial Sabotage. Fuel Removed & Assemblies Rinsed.Investigation Continuing | /08T-0 on 790507:caustic Residue Discovered on 62 New Fuel Assemblies.Caused by Industrial Sabotage. Fuel Removed & Assemblies Rinsed.Investigation Continuing | | | 05000281/LER-1979-013, Forwards LER 79-013/01T-0 | Forwards LER 79-013/01T-0 | | | 05000281/LER-1979-013-01, /01T-0:on 791007,MOV-SW-202B Operated Mechanically & Electrically in Apparent Reverse Manner W/Unit at Cold Shutdown.Caused by Disc Spline of Svc Water Valve Improperly Aligned to Gear Train of Motor Operator | /01T-0:on 791007,MOV-SW-202B Operated Mechanically & Electrically in Apparent Reverse Manner W/Unit at Cold Shutdown.Caused by Disc Spline of Svc Water Valve Improperly Aligned to Gear Train of Motor Operator | | | 05000280/LER-1979-013, Forwards LER 79-013/03L-0 | Forwards LER 79-013/03L-0 | | | 05000280/LER-1979-013-03, /03L-0 on 790410:100 Gallons Released from Boron Recovery Test Tank 1-BR-TK-2B Prior to Obtaining Sample Results.Caused by Improper Valve Lineup for Tank Recirculation in Preparation for Sampling | /03L-0 on 790410:100 Gallons Released from Boron Recovery Test Tank 1-BR-TK-2B Prior to Obtaining Sample Results.Caused by Improper Valve Lineup for Tank Recirculation in Preparation for Sampling | | | 05000280/LER-1979-014-03, /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Instrument Drift in High Alarm Setpoint.All Liquid Waste Releases Were Secured & Alarm Board Checked | /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Instrument Drift in High Alarm Setpoint.All Liquid Waste Releases Were Secured & Alarm Board Checked | | | 05000280/LER-1979-015-03, /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Procedural Inadequacy.Procedures Modified | /03L-0 on 790422:liquid Waste Disposal Radiation Monitor Failed to Give High Alarm & Trip Release Valve. Caused by Procedural Inadequacy.Procedures Modified | |
|