/03L-0 on 781204:during Normal Full Pwr Oper,Loss of Flow Was Detected in Charging Pump Intermediate Seal Cooler 1-SW-E-1B.Caused by Failure of Cooler Intake Gate Valve Becoming Corroded| ML18113A730 |
| Person / Time |
|---|
| Site: |
Surry  |
|---|
| Issue date: |
12/18/1978 |
|---|
| From: |
Baucom T VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
|---|
| To: |
|
|---|
| Shared Package |
|---|
| ML18113A729 |
List: |
|---|
| References |
|---|
| LER-78-044-03L, LER-78-44-3L, NUDOCS 7812270324 |
| Download: ML18113A730 (2) |
|
Similar Documents at Surry |
|---|
|
LER-1978-044, /03L-0 on 781204:during Normal Full Pwr Oper,Loss of Flow Was Detected in Charging Pump Intermediate Seal Cooler 1-SW-E-1B.Caused by Failure of Cooler Intake Gate Valve Becoming Corroded |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 2801978044R03 - NRC Website |
|
text
r NRC FORM 366 u. ::,. NutlEAR AEGOtaiORY t,;QAAAAISSION
. 17-77) i.. ~ *. *_.,... ----~-l:ICENSEE EVENT REPORT e
l
~-~ROL BLOCK: ~
I
- I J 0 (PLEASE PRINT ~R TYPE ALL REQUIRED INFORMATION)
- ~
I V I A I s I p I s I l 101 ° I O I - I O IO I O IO IO 1- *1 ° IO 1014 11 11 11 11 101. I *. 10 1
7 8
9 LICENSEE CODE 14 15 LICENSE NUMBER 25 26 LICENSE TYPE JO 57 CAT 58 CON'T
! [ 0 1, I
- ~~~~~ ~© I o I s I O I O I O I 2 I 8 I O 101 1 12 I O 14 17 18 101 11 21 11 s! 11 s 10
- }
8 60 61 DOCKET NUMBER 68 69 EVENT DATE 74 75 REPORT DATE
, BO EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@
L..2..li] I During normal full power operation, a loss of flow was detected in the charging pump i~termediate seal ccioler l-SW-E-18.
R~dundant cooler 1-SW-E-lA was placed in service until valve repairs were completed.
Unit l operated in a degraded mode in accordance with T.S. 3.3.s.7 and the event* is reportable per T~S. 6.6.2.b.(2)t [IT[]
- .((ill The health and safety of the public were not affected because the standby cooler
'----------------------------------------...-..1'
- [2JI) l....... __ r_e_m_a_in_e_d~o_p_e_r_a_b_l_e_.~~~~~~------~~~~-----------------------------------------J [ill]
7 8 9 SYSTEM CODE I w1 Aj@
9 10
~
. LEA/RO LVENT YE.AR
\\,!..:,) REPORT I 11 a, NUMBER 21 22 ACTION FUTURE TAKEN ACTION EFFECT ON PLANT
CAUSE
CAUSE COMP.
CODE SUBCODE COMPONENT CODE.
SUBCODE
~@ ~@ I Vj Al LI v, Ej x,e* ~
11 12 13 18
. 19 SEQUENTIAL OCCURRENCE REPORT REPORT NO.
CODE TYPE L=J 1° 14 14 I 1.....--1 I O I 3 j
~
23 24 26 27 28 29 30 VALVE SUBCODE l.2.J@
20
.l=J 31 REVISION NO.
~
32 SHUTDOWN METHOD PRIME COMP, COMPONENT HOURS SUBMITTED FORM SUB.
SUPPLIER
. MANUFACTURER 80
~
ATTACHMENT NPRD-4 L!J@~@) L:J@ ~ 1° 1° 1° I I. ~@ L!.1(§)
33 34 35 36 37 40 41 42
~@ I w Io l 3 I O I CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @
43 44 47 I
Loss of flow resulted from failure of the cooler intake gate valve *.
Corrosion of thaj [ill]. ~I __..;.v..;.a..;.1..;.v.;;;.e....;;..s..;.t..;.e_m...J:..p.:.e;_;rm~i t.:.t.:.e:::..d:::.,_t;:.:h.:.;e:.....;d:..i;..;s;.;.k,;.._;t;.;;o:_.:.f.::.a;.;.1..:.1_;.f.:..r.::.e.::.e.:..1.!..y_a.;;;..;.;.n d,;;._o;.;b:..s:..t:;.;r;...;u:;;.;c:..t:..*..;s;..:e:;.;r..;.v:...i~c;.::e;....;.w;;.;;a;:..:t_e;;.;.r__;.f..;1.;:;o.,.w"'"._..;..;Aa...-__ l [IJT1.I new stem was. fabricated and then installed along with the old_ disk.* A design c;:hange J o:r:D
- has been initiated :to replace sinHlar charging, pump. service water g~1:e valves with IIill l._ ___ b_a_1_1 __
v_a_.1_v_e~_:__ ___________________________________________________ __.
7 8
9 80 FACILITY STATUS
%POWER
.ITTIJ L!J@ 11 I O I O l@I 8
9 10 12 1'3 ______________ 4...
4 ACTIVITY CONTENT t::';;\\
RELEASED OF RELEASE AMOUNT OF ACTIVITY~
[IE] *L21 @ 12.J(§)_I _NI_A _____
.7 8* 9 10 11' PERSONNEL EXPOSURES t:;;;\\
OTHER STATUS N/A M~OO~
A DISCOVERY DISCOVERY DESCRIPTION ~
~@... 1 _o_p_e_r_a_to_r..,.**s_o_b_s...,e_r_v_a_t_i_o_n _______
___,,!11..
~
~
00
. LOCATION OF RELEASE @
N/A 7
44 45 80 NUMBER
(:;;\\ TYPE
DESCRIPTION
IITIJ I 01 01 ~0.?;l.:J@,__ ____
N_I_A ______________ ~-----'
.7 B 9 11 12 13 PERSONNEL INJURIES t:::;\\
NUMBER DESCRIPTION6 80 N/A
.I:IE1 01 01 01@
9
- 11 1._2---------------------------------------------80 LOSS OF OR DAMAGE TO FACILITY '43' TYPE
DESCRIPTION
. i,::,v N/A
~~@)
1 a 9 1._o----------------~-----~-----------~-------------J80 PUBLICITY *
(;';\\
ISSUEDf,;'";;\\ DESCRIPTI.ON ~
NRC USE ON Ly
~
~~
1 0----------....;N/~A.:..._ _____
68 61 9 1111*11111 I 1 8J ~
- {(f I ;}J1tp 3:Yf NAME OF PREPARER T *. L, Baucom
357-3184 (804) 0
- 0. "
. * (Attachment, ~~gg_J_._oJ~L)
- *. -'~~~-;:-~er-~tation, Unit.
Do~ket No: 50-280 Report No: 78-044/0JL-O Event Date: 12-4-78 Title of Report:
Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler
- 1.
Description of Event
At about 1440 on Dece~ber 4, 1978 with Unit 1 operating at fuJl po~er, a loss of flow was detected in the charging pump intermediate seal cooler 1-SW-E-1B.
Unit 1 was operating in a degraded mode in accordance with Technical Specificat*ion 3.3.B.7 and the event is reportable in accordance with T~chnical Speci_fication 6.6.2.b.(2).
- 2.
Probable Consequences of Event:
Loss of the charging pump intermediate seal cooler 1-SW-E-1B did not affect the health and safety of the general public because adequate cooling was obtained from the 11A11 charging pump intermediate seal cooler which is a redundant, fu 11 size coo 1 er.
- 3.
Cause
Loss of flow to the 11811 intermediate seal cooler resulted from failure of the cooler intake gate valve 1-SW-110.
Corrosion of the valve stem permitted the disk to fall freely and obstruct service water flow.
- 4.
Immediate Corrective Action
\\
Immediate action was taken to establish and verify flow to seal cooler 1-SW-E-lA.
- 5.
Subsequent Corrective Ac~ion:
The inoperable gate valve was repaired by installing a new stem fabri-cated from stainless steel~
- 6.
Action to Prevent Recurrence:
A corrosion study was performed on the service water gate valves result-ing in initiation of a design change for replacement with bronze ball valves.
Bal 1 valves wi 11 eliminate the galvanic_ couple created by stem to disk contact in salt water.
- 7.
Generic lmpl ications:
Valve failure in the charging pump service water subsjstem is gene~ic in that many of the existing gate valves are undergoing the same galvanic corrosion.
Replacement with bronze ball valves will solve this corrosion problem and provide for long term reliability.
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000280/LER-1978-001, Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir | Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir | | | 05000280/LER-1978-002, Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance | Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance | | | 05000280/LER-1978-003, Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24 | Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24 | | | 05000280/LER-1978-004-03, /03X-1 on 780305:loss of Svc Water Flow Through Charging Pump Intermediate Seal Cooler Was Caused by Corrosion of Stem of Discharge Gate Valve;Corrosion Was Galvanic(Brass Touching Bronze);Problem Will Be Studied | /03X-1 on 780305:loss of Svc Water Flow Through Charging Pump Intermediate Seal Cooler Was Caused by Corrosion of Stem of Discharge Gate Valve;Corrosion Was Galvanic(Brass Touching Bronze);Problem Will Be Studied | | | 05000280/LER-1978-004, Submit Licensee Event Report No. LER-78-004/03L-0 Re Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler | Submit Licensee Event Report No. LER-78-004/03L-0 Re Loss of Service Water Flow Through Charging Pump Intermediate Seal Cooler | | | 05000280/LER-1978-005, Forwarding Licensee Event Report No. LER-78-005/01T-0 Re Westinghouses Error in LOCA-ECCS Evaluation Model, Which Will Result in Higher Calculated Peak Clad Temperature | Forwarding Licensee Event Report No. LER-78-005/01T-0 Re Westinghouses Error in LOCA-ECCS Evaluation Model, Which Will Result in Higher Calculated Peak Clad Temperature | | | 05000280/LER-1978-006, Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping | Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping | | | 05000280/LER-1978-007, Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98 | Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98 | | | 05000280/LER-1978-008, Submit Licensee Event Report Nos. LER-78-008/03L-0, LER-78-009/03L-0, LER-78-010/03L-0, LER-78-011/03L-0 for Surry Unit No. 1 | Submit Licensee Event Report Nos. LER-78-008/03L-0, LER-78-009/03L-0, LER-78-010/03L-0, LER-78-011/03L-0 for Surry Unit No. 1 | | | 05000281/LER-1978-011-03, /03X-1 on 780305:During Normal Full Pwr Oper,There Was No Svc Water Flow Thru Charging Pump Intermediate Seal Cooler 2-SW-E-1B,due to Failure of the Coolers Discharge Gate Valve | /03X-1 on 780305:During Normal Full Pwr Oper,There Was No Svc Water Flow Thru Charging Pump Intermediate Seal Cooler 2-SW-E-1B,due to Failure of the Coolers Discharge Gate Valve | | | 05000281/LER-1978-011, Forwards LER 78-011/03X-1 | Forwards LER 78-011/03X-1 | | | 05000280/LER-1978-012, Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand | Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand | | | 05000280/LER-1978-013, Submit Licensee Event Report Nos. LER 78-013/03L-0 Re Six Snubbers Not Meeting Test Criteria, & 78-014/03L-0 Re Mount Plate Was Warped, & 3 of 8 Bolts Were Insufficiently Embedded | Submit Licensee Event Report Nos. LER 78-013/03L-0 Re Six Snubbers Not Meeting Test Criteria, & 78-014/03L-0 Re Mount Plate Was Warped, & 3 of 8 Bolts Were Insufficiently Embedded | | | 05000280/LER-1978-015, Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces | Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces | | | 05000280/LER-1978-016, Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening | Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening | | | 05000280/LER-1978-017, Submit Licensee Event Report Nos. LER 78-017/03L-0 Re Not Documenting Four Electric Maintenance Procedures & Two Periodic Tests, & 78-020/03L-0 Re Suspended Air Bubbles in Reservoir Fluid | Submit Licensee Event Report Nos. LER 78-017/03L-0 Re Not Documenting Four Electric Maintenance Procedures & Two Periodic Tests, & 78-020/03L-0 Re Suspended Air Bubbles in Reservoir Fluid | | | 05000280/LER-1978-018, Sutmit Licensee Event Report No. LER 78-018/03L-0 Re Two Main Steam Safety Valves Were Not within Plus or Minus 3% of Setpoint as Required | Sutmit Licensee Event Report No. LER 78-018/03L-0 Re Two Main Steam Safety Valves Were Not within Plus or Minus 3% of Setpoint as Required | | | 05000280/LER-1978-022-03, /03X-1 on 780726:Hydro Test Pump Failed to Build Up Pressure During Attempt to Fill Safety Injection Accumulators Due to Lifting of Its Relief Valve.Valve Replaced & Checked.Accumulator Refilled | /03X-1 on 780726:Hydro Test Pump Failed to Build Up Pressure During Attempt to Fill Safety Injection Accumulators Due to Lifting of Its Relief Valve.Valve Replaced & Checked.Accumulator Refilled | | | 05000280/LER-1978-022, Forwards LER 78-022/03X-1 | Forwards LER 78-022/03X-1 | | | 05000280/LER-1978-024, Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste | Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste | | | 05000280/LER-1978-027, Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria | Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria | | | 05000280/LER-1978-028-03, /03L-0 on 780916:snubber Not Meeting Inspec Criteria Caused by Low Oil Level Due to Leakage at Mating Surface Between Body & End Plate.Holding Bolts Were Tightened & Snubber Was Refilled | /03L-0 on 780916:snubber Not Meeting Inspec Criteria Caused by Low Oil Level Due to Leakage at Mating Surface Between Body & End Plate.Holding Bolts Were Tightened & Snubber Was Refilled | | | 05000280/LER-1978-028, Forwards LER 78-028/03L-0 | Forwards LER 78-028/03L-0 | | | 05000280/LER-1978-029-03, X-1, LER 78-029-03L-0, & LER 78-031-03L-0 for Surry 2 Re Critical Below Minimum Insertion Limit on D Control Bank | X-1, LER 78-029-03L-0, & LER 78-031-03L-0 for Surry 2 Re Critical Below Minimum Insertion Limit on D Control Bank | | | 05000280/LER-1978-029, Forwards LER 78-029/03L-0 | Forwards LER 78-029/03L-0 | | | 05000280/LER-1978-030, Forwards LER 78-030/03L-0, 78-031/03L-0, 78-032/03L-0, 78-033/03L-0 | Forwards LER 78-030/03L-0, 78-031/03L-0, 78-032/03L-0, 78-033/03L-0 | | | 05000280/LER-1978-030-03, /03L-0 on 781009:w/unit at Rated Pwr,Charging Pump Component Cooling Water Pump Btripped.Pump Tripped on Overcurrent.Caused by Corrosion Damage to Motor Bearings. Pump & Motor Rebuilt & Reinstalled | /03L-0 on 781009:w/unit at Rated Pwr,Charging Pump Component Cooling Water Pump Btripped.Pump Tripped on Overcurrent.Caused by Corrosion Damage to Motor Bearings. Pump & Motor Rebuilt & Reinstalled | | | 05000280/LER-1978-031-03, /03X-1 on 781001:during Normal Operation,Channel I Pressurizer Level (Protection) L-I-459 Drifted High.Caused by Drift of Electronic Zero Adjustment,In Conjunction W/ Leakage Thru Transmitter Bypass/Equalizing Valve | /03X-1 on 781001:during Normal Operation,Channel I Pressurizer Level (Protection) L-I-459 Drifted High.Caused by Drift of Electronic Zero Adjustment,In Conjunction W/ Leakage Thru Transmitter Bypass/Equalizing Valve | | | 05000280/LER-1978-031, Forwards LER 78-031/03X-1 & 78-038/03X-1 | Forwards LER 78-031/03X-1 & 78-038/03X-1 | | | 05000281/LER-1978-032, Forwards LER 78-032/03L-0 | Forwards LER 78-032/03L-0 | | | 05000280/LER-1978-032-03, /03L-0 on 781011:heat Tracing Circuit Faults Had Occurred as a Result of Boric Acid Incursion.Faults Repaired & Circuit Current Verified | /03L-0 on 781011:heat Tracing Circuit Faults Had Occurred as a Result of Boric Acid Incursion.Faults Repaired & Circuit Current Verified | | | 05000281/LER-1978-032-03, /03L-0:on 780921,heat Tracing Circuit Manual Boration/Boric acid-to-blender Failed.Caused by Boric Acid Penetration of Heat Tracing Tape Circuits.Heat Tracing Tape Replaced | /03L-0:on 780921,heat Tracing Circuit Manual Boration/Boric acid-to-blender Failed.Caused by Boric Acid Penetration of Heat Tracing Tape Circuits.Heat Tracing Tape Replaced | | | 05000281/LER-1978-033, Forwards LER 78-033/03L-0 | Forwards LER 78-033/03L-0 | | | 05000281/LER-1978-033-03, /03X-1 on 780926:circulating Water Outlet Valve MOV-CW-200D Failed to Close When Operated Electrically. Caused When Actuator Cam for Shut Torque Switch Became Wedged Against Torque Switch Hold Down Screw | /03X-1 on 780926:circulating Water Outlet Valve MOV-CW-200D Failed to Close When Operated Electrically. Caused When Actuator Cam for Shut Torque Switch Became Wedged Against Torque Switch Hold Down Screw | | | 05000280/LER-1978-033-03, /03L-0 on 781015:heat Tracing Circuit Failed. Caused by Old Boric Acid Buildup & Penetration of Heat Leakage | /03L-0 on 781015:heat Tracing Circuit Failed. Caused by Old Boric Acid Buildup & Penetration of Heat Leakage | | | 05000281/LER-1978-034-03, /03L-0:on 781006,w/unit at Cold Shutdown,Snubbers 2-RH-HSS-20 & 2-WFPD-HSS-9 Inoperable.Caused by Low Fluid Level.Defective Snubbers Dry Because of Leaking Rod Seals & Mechanical Damage to Seals.Snubbers Replaced | /03L-0:on 781006,w/unit at Cold Shutdown,Snubbers 2-RH-HSS-20 & 2-WFPD-HSS-9 Inoperable.Caused by Low Fluid Level.Defective Snubbers Dry Because of Leaking Rod Seals & Mechanical Damage to Seals.Snubbers Replaced | | | 05000280/LER-1978-034-01, /01X-1 on 781101:noted That 17 Spare Process Piping Penetrations on Unit 1 & 23 on Unit 2 Were Not Capped in Auxiliary Bldg.Caused by Failure to Properly Complete Capping at End of Constr | /01X-1 on 781101:noted That 17 Spare Process Piping Penetrations on Unit 1 & 23 on Unit 2 Were Not Capped in Auxiliary Bldg.Caused by Failure to Properly Complete Capping at End of Constr | | | 05000280/LER-1978-034, Update to LER 78-034/01X-2 on 781101:17 Spare Process Piping Containment Penetrations Were Not Capped.Condition Has Been Overlooked Since Const.Design Change Approved to Weld Caps on Open Ends | Update to LER 78-034/01X-2 on 781101:17 Spare Process Piping Containment Penetrations Were Not Capped.Condition Has Been Overlooked Since Const.Design Change Approved to Weld Caps on Open Ends | | | 05000280/LER-1978-035, Forwards LER 78-035/01T-0 | Forwards LER 78-035/01T-0 | | | 05000281/LER-1978-035-03, /03L-0:on 781007,during Cold Shutdown,Valve Pit Flooded While Draining Circulating Water Box D.Caused by Damage of Valve from Flooding | /03L-0:on 781007,during Cold Shutdown,Valve Pit Flooded While Draining Circulating Water Box D.Caused by Damage of Valve from Flooding | | | 05000280/LER-1978-035-01, /01T-0 on 781109:study of Calibr Techniques Showed That SI Accumulators Indicated Level Would Be Lower than Actual Level.Discovered After Rigorous Review of Factors Affecting Instru | /01T-0 on 781109:study of Calibr Techniques Showed That SI Accumulators Indicated Level Would Be Lower than Actual Level.Discovered After Rigorous Review of Factors Affecting Instru | | | 05000280/LER-1978-036, Forwards LER 78-036/03L-0, 70-037/03L-0 & 78-038/03L-0 | Forwards LER 78-036/03L-0, 70-037/03L-0 & 78-038/03L-0 | | | 05000280/LER-1978-036-03, /03L-0 on 781107:failure of Heat Tracing Circuit 24D,Unit 1,due to Boric Acid Damage.Heat Tracing Tape Replaced | /03L-0 on 781107:failure of Heat Tracing Circuit 24D,Unit 1,due to Boric Acid Damage.Heat Tracing Tape Replaced | | | 05000281/LER-1978-036-03, /03L-0 on 781015:compensatory Surveillance on RCP Cstator & Hearing Temp Had Not Been Performed.Caused by Failure of Operating Personnel to Restore Process Computer Trend Block Following Computer Reinitialization | /03L-0 on 781015:compensatory Surveillance on RCP Cstator & Hearing Temp Had Not Been Performed.Caused by Failure of Operating Personnel to Restore Process Computer Trend Block Following Computer Reinitialization | | | 05000281/LER-1978-036, Forwards LER 78-036/03L-0 | Forwards LER 78-036/03L-0 | | | 05000281/LER-1978-037, Forwards LER 78-037/03L-0 | Forwards LER 78-037/03L-0 | | | 05000280/LER-1978-037-03, /03L-0 on 781107:procedure Deviation Found Re Filling & Venting Reactor Coolant Sys on 770105.Procedure Deviation Was Misrouted to Records Vault W/O Review by Snsoc.Deviation Has Now Been Submitted to Snsoc for Review | /03L-0 on 781107:procedure Deviation Found Re Filling & Venting Reactor Coolant Sys on 770105.Procedure Deviation Was Misrouted to Records Vault W/O Review by Snsoc.Deviation Has Now Been Submitted to Snsoc for Review | | | 05000281/LER-1978-037-03, /03L-0 on 781022:with Unit at Rated Pwr,Panel Indicator for Radiat Monitor RM-213 Monitoring a Steam Generator Blowdown Read 0.Caused by Loose Connector Joining Detector Cable to Electronic Chassis | /03L-0 on 781022:with Unit at Rated Pwr,Panel Indicator for Radiat Monitor RM-213 Monitoring a Steam Generator Blowdown Read 0.Caused by Loose Connector Joining Detector Cable to Electronic Chassis | | | 05000281/LER-1978-038-03, /03X-1 on 781030:boric Acid Flow from Boric Acid Tank to Blender Was Interrupted.Caused by Blockage of Crystallized Boron at Elbow in Line 1-CH-356-152 | /03X-1 on 781030:boric Acid Flow from Boric Acid Tank to Blender Was Interrupted.Caused by Blockage of Crystallized Boron at Elbow in Line 1-CH-356-152 | | | 05000280/LER-1978-038-03, /03X-1 on 781108:review of Operational Data Showed That Quarterly Calibr of Nuclear Power Range Instrumentation Had Not Been Performed Per Schedule,Due to Scheduling Error | /03X-1 on 781108:review of Operational Data Showed That Quarterly Calibr of Nuclear Power Range Instrumentation Had Not Been Performed Per Schedule,Due to Scheduling Error | |
|