ND-18-0508, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.09b.ii (Index Number 043)

From kanterella
(Redirected from ML18107A114)
Jump to navigation Jump to search
Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.1.02.09b.ii (Index Number 043)
ML18107A114
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/12/2018
From: Yox M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of New Reactors
References
ITAAC 2.1.02.09b.ii, ND-18-0508
Download: ML18107A114 (6)


Text

Michael J. Yox 7825 River Road

^ Southern Nuclear Regulatory Affairs Director Vogtle 3 & 4 Waynesboro, GA 30830 706-848-6459 tei 410-474-8587 cell nfiyox@southernco.com APR 1 2 2018 Docket Nos.: 52-025 52-026 ND-18-0508 10CFR 52.99(c)(3)

U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 3 and Unit 4 Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.1.02.09b.11 [Index Number 0431 Ladies and Gentlemen:

Pursuant to 10 CFR 52.99(c)(3), Southern Nuclear Operating Company hereby notifies the NRC that as of April 9, 2018, Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) Item 2.1.02.09b.ii [Index Number 043] has not been completed greater than 225-days priorto initial fuel load. The Enclosure describes the plan for completing this ITAAC. Southern Nuclear Operating Company will, at a later date, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.

This notification is informed by the guidance described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, or analyses have not been performed or have been only partially completed. All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure l^otifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met priorto plant operation, as required by 10 CFR 52.103(g).

This letter contains no new NRC regulatory commitments.

If there are any questions, please contact Tom Petrak at 706-848-1575.

Respectfully submitted.

Michael J. Yox Regulatory Affairs Director Vogtle 3 & 4

Enclosure:

Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.1.02.09b.ii [Index Number 043]

MJY/LBP/amw

U.S. Nuclear Regulatory Commission ND-18-0508 Page 2 of 3 To:

Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)

Mr. M. D. Rauckhorst (w/o enclosures)

Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)

Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Mr. F. H. Willis Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Mr. J. P. Redd Ms. A. C. Chamberlain Mr. D. R. Culver Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:

Nuclear Reaulatorv Commission Mr. W. Jones (w/o enclosures)

Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Ms. L. A. Kent Mr. P. B. Donnelly Ms. N. C. Coovert Oalethorpe Power Corporation Mr. R. B. Brinkman

U.S. Nuclear Regulatory Commission ND-18-0508 Page 3 of 3 Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. 8. M. Jackson Dalton Utilities Mr. T. Bundros Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)

Mr. D. 0. Durham (w/o enclosures)

Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.

Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.

Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham

U.S. Nuclear Regulatory Commission ND-18-0508 Enclosure Page 1 of 3 Southern Nuclear Operating Company ND-18-0508 Enclosure Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit 4 Completion Plan for Uncompleted ITAAC 2.1.02.09b.ll [Index Number 043]

U.S. Nuclear Regulatory Commission ND-18-0508 Enclosure Page 2 of 3 ITAAC Statement Design Commitment 9.b) The RCS provides the means to control system pressure.

Insoections. Tests. Analvses ii) Tests will be performed to verify that the pressurizer spray valves can open and close when operated from the MCR.

Acceotance Criteria ii) Controls inthe MCR operate to cause the pressurizer spray valves to open and close.

ITAAC Completion Description Multiple ITAAC are performed to demonstrate that the Reactor Coolant System (RCS) provides the means to control system pressure. The subject ITAAC requires a test to verify that the pressurizer spray valves can open and close when operated from the Main Control Room (MCR).

Testing is performed in accordance with the Unit 3 and Unit 4 component test package work orders (References 1 and 2, respectively) for valve remote operability testing to demonstrate controls inthe MCR operate to cause the pressurizer spray valves (RCS-PL-V110A and RCS-PL-V110B) to open and close. The valves are stroke tested using manual Plant Control System (PLS) controls from the MCR and local inspection verifies the valves change position as intended.

The Unit 3 and Unit 4 component test results (References 1 and 2, respectively) confirm that controls in the MCR operate to cause the pressurizer spray valves to open and close.

References 1 and 2 are available for NRC inspection as part of the Unit 3 and Unit 4 ITAAC 2.1.02.09b.ii Completion Packages (References 3 and 4, respectively).

List of ITAAC Findings In accordance with plant procedures for ITAAC completion, Southern Nuclear Operating Company (SNC) performed a review of all ITAAC findings pertaining to the subject ITAAC and associated corrective actions. This finding review found the following relevant ITAAC findings associated with this ITAAC:

References ^available for NRC inspection)

1. SNC921641 Revision 0, "Pressurizer Spray Valve Stroke - ITAAC:SV3-2.1.02.09b.ii"
2. SNCXXXXXX Revision 0, "Pressurizer Spray Valve Stroke - ITAAC:SV4-2.1.02.09b.ii"
3. 2.1.02.09b.ii-U3-CP-Rev X, "Completion Package for Unit 3 ITAAC 2.1.02.09b.ii [Index Number 43]"

U.S. Nuclear Regulatory Commission ND-18-0508 Enclosure Page 3 of 3

4. 2.1.02.09b.ii-U4-CP-Rev X, "Completion Package for Unit 4 ITAAC 2.1.02.09b.ii [Index Number 43]"
5. NEI 08-01, "Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52"