Forwards Insp Repts 50-272/96-15 & 50-311/96-15 on 960915- 1102 & Notice of Violations
ML18102A640
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/03/1996
From: Larry Nicholson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Eliason L
Public Service Enterprise Group
Shared Package
ML18102A641 List:
References
NUDOCS 9612090256
Download: ML18102A640 (3)


See also: IR 05000272/1996015

Text

,~,:.'

I

.,

.

I

December 3, 1996

Mr. Leon R. Eliason

Chief Nuclear Officer and President

Nuclear Business Unit

Public Service Electric and Gas Company

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/96-15, 50-311/96-15

NOTICE OF VIOLATION

Dear Mr. Eliason:

On November 2, 1996, the NRC completed an inspection at your Salem 1 & 2 reactor

facilities. The enclosed report presents the results of that inspection as well as several.

violations of NRC requirements.

During the 7-week period covered by this inspection period, your conduct of activities at

the Salem facilities was generally characterized by safety-conscious operations, sound

engineering and maintenance practices, and careful radiological work controls. We are

concerned, however, about several operator failures to adhere to procedures, and the

subsequent ineffective corrective action. We understand that human errors will

occasionally occur. However, the absence of a rigorous evaluation and understanding of

the events during this period gives cause for concern. Notwithstanding, we continue to

observe overall improvement in the performance of both your organization and plant

equipment.

Your staff has shown a high level of performance on the steam generator replacement

project to date. We encourage a continued process of planning, anticipation of problems,

self assessment of results and appropriate corrective actions.

In accordance with 10 CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room (PDR). The violations

are cited in the enclosed Notice of Violation and the circumstances surrounding them are

described in detail in the subject inspection report. Please note that you are required to

respond to this letter and should follow the instructions specified in the enclosed Notice

when preparing your response. The NRC will use your response, in part, to determine

whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

\\

Sincerely,

ORIGINAL SIGNED BY:

U90009

Larry E. Nicholson, Chief

Projects Branch 3

9612090256 961203

PDR

ADOCK 05000272

G

PDR .

Division of Reactor Projects

I

Mr. Leon R. Eliason

Docket Nos.: 50-272, 50-311

License Nos: DPR-70, DPR-75

Enclosures:

Notice of Violation

2

Inspection Report 50-272/96-15, 50-311 /96-15

cc w/encl:

L. Storz, Senior Vice President - Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. Salowitz, Director - Nuclear Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. MacFarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, Office of Consumer Advocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

I

Mr. Leon R. Eliason

Distribution w/encl:

Region I Docket Room (with concurrences)

Kay Gallagher, DRP

Nuclear Safety Information Center (NSIC)

3

L. Cunningham, NRR (Security/Safeguards IRs)

D. Barss, NRR (Emergency Plan IRs)

G. Kelly, DRS

N. Della Greca, DRS

D. Screnci, PAO

D. Vito, SAC

NRC Resident Inspector

PUBLIC

Distribution w/encl: (Via E-Mail)

L. Olshan, NRR

W. Dean, OEDO

J. Stolz, PDl-2, NRR

M. Callahan, OCA

Inspection Program Branch, NRR (IPAS)

R. Correia, NRR (RPC)

R. Frahm, Jr., NRR (RKF)

DOCUMENT NAME: a:\\9615.rev

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy

OFFICE

NAME

12/j96

OFFICIAL RECORD COPY