CONTAINMENT SYSTEMS CONTAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION

===================================~======================~=======

3.6.1.2 Containment leakage rates shall be limited to:

a.

An overall integrated leakage rate of $ La, 0.10 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at design pressure,

{47. o psig).

b.

A combined leakage rate of $ 0.60 La for all penetrations and valves subject to Type Band C tests as identified in Table 3.6-l, when pressurized to Pa.

APPLICABILITY: MODES l, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types Band C tests exceeding 0.60 La, restore the leakage rate(s) to within the limit(s) prior to increasing the Reactor Coolant System temperature above 200°F.

SURVEILLANCE REQUIREMENTS

============~==========2==========================================

AS foUo'-0 !Sio 4.6.1.2 The containment leakage rates shall be demonstrated at the following est schedule an a 1 be etermined in conformance with the criteria specified in Appendix J of 10 CFR 50 using the methods and provisions of ANSI N45.4-1972:

a.

Three Type A tests (Overall Integrated Containment Leakage Rate) shall be conducted at 40 +/- 10 month intervals during shutdown at design pressure (47.0 psig) during each 10-year service period.*(**)

The third test of each set shall be conducted during the shutdown for the 10-year plant inservice inspection.

(,----- 6061S04*04 96o612-. ~

.. -~--*

-~

1

, but no later than May, 1984.

PDR ADOCK 05000272 1

P PDR

    • The fifth inservice Integrated Leak Rate *Test (the second inservice Integrated Leak Rate Test during the second 10-year plant inservice inspection interval) shall be performed during the thirteenth refueling outage, but no later than June 1997.

a...' T)'?C.,A "T6-C.S.TS.

$'-t,<tL~

be ACGOl(t>ttJ\\.IClf c,.>L'T""' lDCf!A 5"0,5~ o) l...t C.EJ~F-Dll/Vtlf-N.C~

L\\.)LT'-' "9PAS-Hi>L)<. J OF lt:>t!F-A.1i°0 1 DP/,olo{ &)

t.\\$c""4G ~~ ""6.T""ol:>~ '9t10 'PA0V1S.10N:;,.

of-12.C:Gc.c& *. l\\"'roe.y G'-Oe 1*1'6..3, SALEM -

UNIT l 3 / 4 6 - 2 Amendment No. :i 71 se,.PTE: P\\ a~ tl-

\\ C\\4 5 A 5-

.Me:? l>1 F ( e i) b}I l'Ji>PP.~ llE,i) IJ:.J<r:,.,, (>Tf b"' ~.

CONTAINMENT SYSTEMS

  • -===-..:~~":'

SURVEILLANCE REQUIREMENTS (Continued)

b.
c.

If any periodic Type A test fails to meet.75 L, the test schedule for subsequent Type A tests shall be r~viewed and approved by the Commission.

If two consecutive Type A tests fail to meet.75 L, a Type A test shall be performed at least every 18 months un~il two consecutive Type A tests meet.75 L at which time the above test schedule may be resumed.

a The accuracy of each Type A test shall be verified by a supple-*

mental test whi~h:

1.

Cor1fi1i1i:~*

th*.<~ t:CtLiracy of the Type A test by verifying that the dff{'er*en.:;:e between supplem~ntal and Type A test data is within 0,25 La.

2.

Has a dt*\\"Fi";')i, <:11ff1ric;J t(. E"r.t(:ihl ish fl.cr::urately UK change ir.

  • 1 c~k.a~-
.,.1:~-:c'.ii U1c:.0 Tyµr* /\\ t.!;':*i. {'tfld tiH~ sllppi e-menta 1 trst...

Requires thE: quantity of ~)i';s inji::e:tE*d in*i.:o the containment or bled from the contc.:.'iri;11-:'11t du1ing the SUViileme::ntal test to be equivalent to al l~ast 25 parc~nt of thf total measured leakage rate ~t dPsign pressure (47.0 psig).

Type B and C test~ ~;~-!'::°I.i be con(lucte

  • v.*i U1. gas at clesigr. pressure (47.0 psig) at intervals no greater han 24 months exce~t for tests involving air locks.

Air locks sh811 be test~d and demonstrated OPERABLE per Survei.llance Requireli!~iT~ 4.-6.1.3.

I"{

Co,..(foil~A-""'GE.

L.Vtr~

AP~'i:Mt:ILJ(..) &>F-

/0 c.F-12.. $C> 1 0PT1 o.... \\ A)

SALEM - UNIT 1 3/4 6-3

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

f.

All test leakage rates shall be calculated using observed data converted to absolute values.

Error analyses shall be per-formed to select a balanced integrated leakage measurement system.

SALEM - UNIT l 3/4 6-4

CONTAINMENT SYS~

CONTAINMENT LEAKAGE LIMITING CONDITION FOR OPERATION 3.6.1.2 Containment leakage :ates shall be limited to:

a.

An overall integrated leakage rate of less than or equal to La, 0.10 percent by weight of the containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at design pressure (47.0 psig).

b.

A combined leakage rate of less than or equal to 0.60 La for all penetrations and valves subject to Type B and C tests as identified in Table 3.6-1, when pressurized to Pa.

APPLICABILITX:

MODES l, 2, 3 and 4.

ACTION:

With either (a) the measured overall integrated containment leakage rate exceeding 0.75 La, or (b) with the measured combined leakage rate for all penetrations and valves subject to Types B and C tests exceeding 0.60 La, restore the overall integrated leakage rate to less than or equal to 0.75 La and the combined leakage rate for all penetrations subject to Type B and C tests.to less than or equal to 0. 6.0 La prior to increasing the Reactor Coolant System temperature above 2oo*r.

SURVEILLANCE REQUIREMENTS A, FoL.L.c:>c...? 5> :

4. 6.1. 2 The containment leakage rates shall be demonstrated"' at t e following test sc edule and sha 1 be n conformance w t t;:he criteria specified in Appendix J usin~ the methods and provisions of ANSI N45.4-1972:
a.

Three Type A tests (Overall Integrated Containment Leakage Rate) shall be conducted at 40 +/- 10 month intervals* during shutdown at design pressure (47.0 psig) during each 10-year service period.

The third test of each set shall be conducted during the shutdown for the 10-year plant inservice inspection.

The test interval for conducting a Type A test shall be extended from 40 +/- 10 months to allow the third Type A test, within the first 10-year service period, to be completed during the 10-year plant in-service inspection outage (6th refueling outage).

This extension expires upon completion of the 6th refueling outage.

a. "T}'t'IZ.. A -n;.s.ls s.1-1.. u.. L be Ac.c.012.i>A...._q~

<.~.n'rlo\\

10C.FA..So.~'t(o)

I-"-\\

~ o..., j:.o ~n" "4 c llE w

  • r~,.q PPe,.. ~,JC. J o F-1oc.1=11...5 o 0 Pl 10 AJ i3.

I I

"-C::.1~Gr "f\\-\\t. l""\\S.."'i"\\.o\\OO..S "'""D Pi2.0VlS.10...,~ DF /2..1£;,(;"L.+i-0112.y G.&..11 d:>&...

t. I 6. 3.

St:Pl!.M bf~ \\ C\\ <\\ ~ AS.

1Y>> o 'i:>1 F1 e'Po

.1>y 4~f~OV6.D 6:-X E.l"\\PT10"'$.

UNIT 2 3/4 6-2 SALEM -

Amendment No.

-8'S

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

If any periodic Type A test fails to meet.75 L, the test schedule for subsequent Type A tests shall be reviewed aHd approved by the Commission.

If two consecutive Type A tests fail to meet.75 La, a Type A test shall be performed at least every 18 months until two consecutive Type A tests meet.75 L at which time the above ~est schedule ~ay be resumed.

a

c.

The accuracy* of each Type A test shall be verified by a supplemental test which:

1.

Confirms the accuracy of th~ Type A test by verifying that the difference between supplemental and Type A test data is within 0.25 La.

2.

Has a duration sufficient to establish accurately the change in leakage between the Type A test and the supplemental test.

3.

Requires the quantity of gas injected into the containment or bled from the containment during the supplemental test to be equivalent to at least 25 percent of the total measured leakage rate at design pressure (47.0 psig).

.b,.d'.

Type B and C tests shall be conducte with gas at design pressure (47.0 psig) at intervals no greater han 24 months except for tests involving air locks.

c~.

Air locks shall be tested and demonstrated OPERABLE er Surveillance Requirement 4.6. 1.3.

f.

All test leakage rates shall be calculated using observed data converted to absolute values.

Error analyses shall be performed to select a balanced integrated leakage measurement system.

The provisions of Specification 4.0.2 are not ap licable.

I"(

SALEM - UNIT 2 3/4 6-3