Docket Nos. 50-272
50-311
Mr. Steven E. Miltenberger
Vice President and Chief Nuclear Officer
Public Service Electric and Gas Company
P.O. Box 236
Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
JUL 3 O 1992
. SUBJECT:
INSPEC~ON NOS. 50-272/92-ll; 50-311/92.:ll
This refers to the inspection conducted by Mr. W. Baunack of this office from* .
July 6*9, 1992. The inspection included a review of activities authorized for your Salem 1 *
and 2 facilities in HanGOCks Bridge, New Jersey. At the conclusion of the insp-ection, the
findings were discussed with those members of your *staff identified in the enclosed report.
Areas examined during the inspection are discussed in the enclosed inspection report. Within .
these areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, one of your activities. appeared to. be- in violation of
NRC regulations, as specified in the enclosed Notice of Violation (notice). This activity dealt
with the control of measuring and test equipment. The control of .this equipment is vital°to .
the satisfactory maintenance and testing of components important to safety.
.
.
'
.
You are required to respond to this letter and should follow the instructions specified in the
~nclosed Notice when preparing your response. In your response, you should document the
specific actions taken and any additional actions you plan to prevent recurrence. After
reviewing your response to this Notice, including your proposed corrective ~ctions and results
of future.inspection, the NRC will determine whether further NRC enforcement action is
- necessary. to.ensure compliance with.NRC regulatory requirements.
r* -
OFFICIAL RECORD COPY - S:SAL9211
9208050332 920730
ADOCK 05000272
G
Mr.' Steven E. Miltenberger
In accordance with 10 _CFR 2. 790 of the NRC's "Rules of Practice," a copy of this letter and
.
.
its enclosures will be placed .in the NRC Public Document Room. The responses directed by
this letter and the enclosed Notice are not subject to the clearance procedures of the Office of *
Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No~
96.511.
.
Enclosures:
1.
Sincerely,
~ul~~
Lee H. Bettenhausen, Chief
Operations Branch
Division of Reactor Safety
2.
Inspection Report Nos. 50-272/92-:11; 50-311/92-11
cc w/encls:
S. La.Bruna, Vice President, Nuclear Operations
C. Scbaefer, External Operations - Nuclear, Delmarva Power & Light Co.
C. Vondra, General Manager~ Salem Operations
F. Thomson, Manager, Licensing and Regulation
L. Reiter, General Manager - *QA and Nuclear Safety Review
J. Robb, Director, Joint Owner Affairs
A. Tapert, Program Administrator*
R. Fryling, Jr., Esquire
M. Wetterhahn, Esquire
J. Isabella, Director, Generation Projects. Department,
Atlantic Electric Company
Consumer Advocate, Office of Consumer Advocate
K .. Abraham, PAO (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of New Jersey
OFFICIAL RECORD COPY - S:SAL9211
Mr.* Steven E. Miltenberger
bee w/encls:
Region I Docket Room (with concurrences)
J. Stone; NRR
S_; Dembek, NRR
R. Lobel, OEDO
L. Bettenhausen, DRS
N. Blumberg, DRS
W. Baunack, DRS
A. Heggie, DRS
E. Wenzinger, DRP
J. White, DRP
DRS/ED SALP Coordinator
DRSS SALP Coordinator
DRS File (2)
3
DRS:RI
Baunack/gcb/ajk
ff.ii~
DRS:RI '(t-1]'
DRS:RI
~60;0
192
Blurnbergf '[//'
~au
sen
011{192
.
0'"/.,f!J92
OFFICIAL RECORD COPY - S:SAL9211