NLR-N90076 ATTACHMENT 3
,,,.-- -5'T>04T::::o H:* r- 'i'(l(>l+O*~*-
'\\
PDR ADOCK 05000272 P
TAB LE 3.3-5 (Continued)
ENGINEERED SAFETY FEAT~ES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION
- 3. Pressurizer Pressure-Low
- a. Safety Injection (ECCS)
- b. Reactor Trip (from SI}
- c. Feedwater Isolation
- d. Containment Isolation-Phase *A*
- e. Containment Ventilation Isolation
- f. Auxiliary Feedwater Pu~s
- g. Service Water System 4..
Otfferei'ithl Pressure Between Steam Lines-High
- a. Safety Injection (ECCS) be Reactor Trip (from SI) c
- Feedwater Isolation
- d. Containment Isolation-Phase *A*
- e. Containment Yent11at1on Isolation
- f. Auxiliary Feedw~ter Pu~s
- g. Service Water System
- s. Steam F 1 ow 1 n two Steam l1 nes
- H19!! Coincident with T avg *-Law-LDW
- a. Safety Injection (ECCS)
- b. Reactor Trip (from SI)
- c. Feedwat!r lsol1tion
- d. Contaf n111nt Isolation.Phase *A*
- Conta1n11ent-Yentil1tion Isolation
- f. Au xi 11 ary FHdwater. Pull!ps
- g. Service Water System
- n. Steam L1 ne Iso 1at1 on SAW.
- UHIT 1 3/4 3-28 RESPONSE T !ME IN SEC ON C5
~ 21.0(1)112.0(2)
< 2.0
-< 7.0
-! 18.0(2}
Not App 11cab1 e
< 60
-! 49.o(l)/13.o(2)
! 12.0(2}/22.0(3)
! 2.0
! 7.0
! 11.0(2)/27.0(3)
Not Applicable
< 60
-! 1J.0(2)/4a.o(3)
! 15.75(2)/25.75(3)
! 5.75
! 10.75
! 20.75(2)/30.75(3)
Not Applicable
! 61.75
< 15.75(2)/50.75(3)
!1e.1s_~
Amendment No. 84
TABLE 3.3-5 (Cont1nu@d)
ENGINEERED SAFETY FEATlRES RESPONSE TIMES INITIATING SIGMA LAND FUNCTION
- 6. Ste111 flow fn Two Stea* Lf nes-Hf gh Co1ne1dwrtt with Stea* Lf n1 Pressure-low
- 1. Safety InJect1on (ECCS)
- b. R11ctor Trf p (fl"Oll SI)
- c. Feedlf1ter Isol1tf on
- d. Contaf ft91nt Isol1tton-Phas1 *A*
- Cont11ft9'nt ~ent11;t!Gi'i liol1tion
- f. Auxtl11ry Feedllfater Pull!ps
- g. SerY1 c1 Water Syst*
- h. Stu* Lfn1 Isol1t1on
- 7. Cont1i wnt Pressure-Hf gh-Hf gh
- 1. Contaf nmnt Spray
- b. Cont11nmnt Isol1tton-Phas1 -a*
- c. Stea* L1n1 Isolat1on
- d. Contaf "91nt Fan Cooler
- 8. St11* Generator Water lavel-Htq!!-Hf sh
- 1. Turbf ne Trip -
- b. Feedw1t1r Isolatton
- 9. St11* Generator Vat1r t.vel-1.ow*l.aw
- Motor*Drf ven Auxtltary FH*ater Putlps(4)
- b. Turbf n1*Dr1 v.n Auxf lfary Fftdw1ter Pumps (5)
SAi.EM
- lltIT 1 3/4 3-29 RESPONSE T lME IN SECON OS
< 12.0(2)/22.0(3)
-< 2.0
..! 7.0
.! 11.0<2>121.0(3)
Not Applicable
< 60
~ 14.0(2)/48.0(3)
<a;; ry 10.0
< 45.0 Not *PP 11cab1 e
~ r.f-4-[io.o J
< 40.0
< 2.5
-< 11.0
< 60.0
.! 60.0 Amendment No.
84 I
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION _____________
~~
3.7.l.5 Each main steam line isolation valve shall be OPERABLE.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
MODES 1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the.inoperable valve is either restored to OPERABLE status or closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; otherwise, be in. HOT SHUTDOWN within tha next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
MODES 2 - With one main steam line isolation valve inoperable, subsequent and 3 operation in MODES 1, 2 or 3 ~ay proceed provided;
- a.
The isolation valve is maintained closed.
- b.
The provisions of Specification 3.0.4 are not applicable.
Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEI°LL~NCE REQUIREMENTS 4.7.1.5 Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within ~econds when tested pursuant 'to Specification 4.0.5.
~
SAL2'!-UNrT 1 3/d. i-iO
)
TABLE 3.3-5 (Continued)
ENGINEERED SAFETY FEAT~ES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION
- 3. Pressu r'f zer Pressure-Low
- a. Safety Injection (ECCS)
- b. Reactor Trip (from SI)
- c. Feedwater Isolation
- d. Containment Isolation-Phase *A*
- e. Containment Ventilation Isolation
- f. Auxiliary Feedwater Pu111>s
- g. Service Water System
- 4. Dffferentfal Pressure Between Steam Lines-High lo S~fety Injection (ECCS)
- b. Reactor Trip (from SI)
- c. Feedwater Isolation
- d. Contain111ent Isolation-Phase *A~
- e. Containment Vent11at1on Isolation
- f. AuxiliJry Feedwater Puq>s
- g. Service Water System
- s. Steam Fl ow in two Steam Lines - High Cof nci dent with T avg -Low-Law
- a. Safety Injection (ECCS)
- b. Reactor Trip (from SI)
- c. Feedwater Isolation
- d. Contain111nt Isolation-Phase *A*
- Contain.. nt Ventilation Isolation
- f. Auxf 11ary FHdwater Pumps
- g. Service Water System
- h. Steam Line Isolatf on
- UNIT 2 3/4 3-29 RESPONSE TIME IN SEC ON CS
! 27.0(l)/12.0(2)
! 2.0
! 7.0
! 18.0(2)
Not App 11cab1 e
< 60
-! 49.0(l)/13.0(2)
! 12.0(2)/22.0(3)
! 2.0 i 7.0
.! 17.0(2)/27.0(3)
Not App 1f cab 1 e
< 60
-! 13.0(2)/48.0(3}
< 15.75(2)/25.75(3)
-! S.75
! 10.75
! 20.75(2)/30.75(3)
Not Applf cable
! 61.. 75
< 15.75(2)/50.75(3)
~ 18. 75 ""@*;.fl Amendment No.
56
l>
..i TABLE 3.3-5 (Continued)
ENGINEERED SAFETY FEATURES RESPONSE TIMES INITIATING SIGNAL AND FUNCTION
- 6.
Steam Flow in Two Steam Lines-High Coincident w~th Steam Line Pressure-Low
- a.
Safety Injection (ECCS)
- b.
Reactor Trip (from SI)
- c.
Feedwater Isolation
- d.
Containment Isolation-Phase "A"
- e.
Containment Ventilation Isolation
- f.
Auxiliary Feedwater Pumps
- g.
Service Water System
- h.
Steam Line Isolation
- 7.
Containment Pressure--High-High
- a.
- b.
Containment Isolation-Phase 11811
- c.
Steam Line Isolation
- d.
Containment Fan Cooler
- 8.
Steam Generator Water Level--High-High
- a.
- Turbine Trip
- b.
Feedwater Isolation
- 9.
Steam Generator Water Level --Low-Low
- a.
Motor-Driven Auxiliary Feedwater Pumps(4)
- b.
Turbine-Driven Auxiliary Feedwater Pumps(S)
RESPONSE TIME IH SECONDS i 12.0<2>122.oCJ)
- ii 2.0
- ii 7.0
- ii 17.0<2>121.oCl)
Not Applicable
< 60
~ 14. 0<2> /48. 0<3>.
- ii &rlt~
~
- ii 45.0 Not Applicable
- ii r.&-'(?o.o I
~ 40.0
~ 2.5
- S 11. 0
- ii 60.0
- S 60.0 SALEM - UNIT 2 314-3-30
PLANT SYSTEMS MAIN STEAM LINE ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.7. 1.5 Each main steam line isolation valve shall be OPERABLE.
APPLICABILITY:
MODES 1, 2 and 3.
ACTION:
MODES 1 - With one main steam line isolation valve inoperable, POWER OPERATION may continue provided the inoperable valve is either restored to OPERABLE status or closed within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />; Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
MODES 2 - Wi'th one main steam line isolation valve inoperable, subsequent and 3 operation in MODES 1, 2 or 3 may proceed provided;
- a.
The isolation valve is maintained closed.
- b.
The provisions of Specification 3.0.4 are not applicable.
Otherwise, be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.7.1.5 Each main steam line isolation valve shall be demonstrated OPERABLE by verifying full closure within~econds when tested pursuant to Specification 4.0.5.
~
SALEM - UNIT 2 3/4 7-10