Text
...
L Docket Nos. 50-272 and 50-311 Mr. Steven E. Miltenberger March 28, 19
. DISTRIBUTION w/enclosure:
- ~ocket File *;
MO' Brien NRC PDR JStone Local PDR MThadani PDI~2 Reading OGC SVarga ACRS (10)
Vice President and Chief Nuclear BBoger EJordan,MNBB 3701 Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
WButler
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. 75125 AND 75126)
RE:
SALEM GENERATING STATION, UNITS 1 AND 2 By letter dated September 13, 1989 (NLR-N89033), Public Service Electric and Gas (PSE&G) requested amendments to Salem 1 and 2 technical specifications.
The request corrected a number of tables in the Salem technical specifications.
The staff has completed a preliminary review of the request. Additional information and clarifications, as detailed in the enclosure is necessary to complete our review.
Please provide the requested information within 60 days of receipt of this letter.
The reporting and/or recordkeeping requirements of this letter affect fewer.
than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Enclosure:
As stated cc w/enclosure:
See next page
[75125/6]
t PDI-2/PM JSt~~e:mj
~ !t;..'l /90 PDI-2/D l ? '
WButler \\.Jv
~0 ?;fl90 Sincerely, Isl James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
!12.
,JvV0 A/Pr/:J.
-r, UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-272 and 50-311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
March 28, 1990
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (TAC NOS. 75125 AND 75126)
RE:
SALEM GENERATING STATION, UNITS 1 AND 2 By letter dated September 13, 1989 (NLR-N89033), Public Service Electric and Gas (PSE&G) requested amendments to Salem 1 and 2 technical specifications.
The request corrected a number of tables in the Salem technical specifications.-
The staff has completed a preliminary review of the request. Additional information and clarifications, as detailed in the enclosure is necessary to complete our review. Please provide the requested information within 60 days of receipt of this letter.
The reporting and/or recordkeeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Enclosure:
As stated cc w/enclosure:
See next page Sincerely, James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
ENCLOSURE INFORMATION REQUEST Note:
Item numbers refer to the numbered paragraphs in Attachment 1 of PSE&G Letter Number NLR-N89033, dated September 13, 1989.
Item 1 ~ This change requested a reduction from 4 to 3 in the minimum number of Reactor Coolant Pump Undervoltage and Underfrequency channels required to be operable. The only justification provided was that the change was in agreement with the Westinghouse Standard Techni*cal Specifications (NUREG-0452, Rev 4).
PSE&G must provide a technical justification for changing the minimum number of channels from 4 to 3 by addressing such topics as, for example, effect on accident analysis, plant operation, etc.
Item 2 -
It is not clear why replacement of the* (asterisk) with 3*, 4*, 5*,
of Table 3.3-1 and Table 4.3-1 in the Mode column is being requested.
When in Mode 2 or in ~
other Mode when the control rod drive system is energized, as currently designated by the*, the listed number of channels must be operable.
By changing the* to 3*, 4*,
5*, confusion as to what is meant could result. The 3*, 4*, 5*,
could be interpreted to mean the listed number of channels must be operable when in Mode 3, 4, and 5,and wher.ever the control rod drive system is energized.
PSE&G needs to provide the reasoning behind this requested change (i.e. Has the current wording been misinterpreted? If so, how were the¥ misinterpreted and how will this change alleviate the situation?)
Item 5 -
This change from a 1-hour time allowance to conduct surveillance tests to a 2-hour time allowance when the number of channels required to be OPERABLE is one less than the total number of channels has been characterized as a typographical error. Also, the Westinghouse Standard Technical Specifications have been referenced for justification.
PSE&G must provide a technical justification for changing the allowed time from 1-hour to 2-hours, and why it is acceptable from a safety viewpoint.
Under the circumstances of this Action Statement, during the performance of the surveillance tests there would be 2-hours with no automatic initiation of auxiliary feedwater or automatic actuation of the steam line isolation.
o..L
~
~
-Mr. Steven E. Miltenberger Public Service E1ectric & Gas Company cc:
Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, MW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ
- 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Mr. Thomas P. Johnson, Senior Resident Inspector Salem Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Or. Jill Lipoti, Ph.D New Jersey Department of Environmental Protection Division of Environmental Quality Radiation Protection Programs State of New Jersey CN 415 Trenton, NJ 08625 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Mr. J. T. Robb, Director Joint Owners Affairs Philadelphia E1ectric Company 955 Chesterbrook B1vd., 51A-13 Wayne, PA 19087 Salem Nuclear Generating Station Richard B. McGlynn, Corrmission Department of Public Utilities State of New Jersey 101 Commerce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Mr. Jack Urban General Manager, Fuels Department Delma. rva Power & Light Company 800 King Street Wilmington, OE 19899 Public Service Commission of Maryland Engineering Division ATTN:
Chief Engineer 231 E. Baltimore Street Baltimore, MO 21202-3486