Text
,>
Novemb~7, 1989 I
Docket Nos. 50-272/311 DISTRIBUTION w/enclosure Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Ga~.
Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
Doc'l<et-Fi 1 e JS tone NRC PDR MThadani Local PDR OGC PDI-2 Reading EJordan SVarga ACRS. (10)
BBoger JLinville,RI WButler WRegan,HFAB MO'Brien
SUBJECT:
RE:
PROCEDURES GENERATION PACKAGE (TAC NOS. 44338/44339)
SALEM GENERATING STATION, UNITS 1 AND 2
References:
- 1.
Letter Liden, PSE&G to Varga, NRC dated May 20, 1983
- 2.
Letter McNeil (PSE&G) to Noonan, NRC dated December 30, 1986 The NRC staff has reviewed PSE&G's submittals (Ref. 1 and 2) that forwarded the Procedures Generation Package (PGP) and revised writer's guide.
The staff finds that the program described in the submittals is deficient in some respects. These deficiencies, if not corrected, could impair your ability to develop and maintain high quality Emergency Operating Procedures (EOPs).
The staff's findings are discussed in detail in the enclosed Safety Evaluation (SE).
It is requested that you revise your PGP to reflect the concerns identified in.
the SE, or provide justification why such revisions are not necessary.
As stated in the SE, submission of the revised PGP or justifications is not required.
However, it is requested that the schedule for revising the PGP and performing the EOP review based on the revised PGP be provided within 60 days of receipt of this letter. The reporting and/or record keeping requirements of this lette~ affect fewer than ten respondents; therefore OMB clearante is not required under P.L.96-511.
Enclosure:
Safety Evaluation cc w/enclosure:
See next page
[44338/9]
Sincerely,
/s/
James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-272/311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric and Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
November 17, 1989
SUBJECT:
RE:
PROCEDURES GENERATION PACKAGE (TAC NOS. 44338/44339)
SALEM GENERATING STATION, UNITS 1 AND 2
References:
1~
Letter Liden, DSE&G to Varga, NRC dated May 20, 1983
- 2.
Letter McNeil {PSE&G) to Noonan, NRC dated December 30, 1986 The NRC staff has reviewed PSE&G's submittals (~ef. 1 and 2) that forwarded the Procedures Generation Package (PGP) and revised writer's guide.
The staff finds that the program described in the submittals is deficient in some respects. These deficiencies, if not corrected, could impair your ability to develop and maintain high quality Emergency Operating Procedures (EOPs).
The staff's findings are discussed in detail in the enclosed Safety Evaluation (SE).
It is requested that you revise your PGP to reflect the concerns identified in the SE, or orovide justification why such revisions are not necessary.
As stated in the SE, submission of the revised PGP or justifications is not required.
However, it is requested that the schedule for revising the PGP and performing the EOP review based on the revised PGP be provided within 60 days of receipt o~ this letter. The reporting and/or record keeping requirements of this letter affect fewer than ten respondents; therefore OMB clearance is not required under P.L.96-511.
Enclosure:
Safety Evaluation cc w/enclosure:
See next page Sincerely, James C. Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:
Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Mjller General Manager - Salem Operations Salem Generating Station P. 0. Box 236 Hancocks Bridge; NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Kathy Halvey Gibson, Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Richard F. Engel Deputy Attorney General Department of Law and Public Safety CN-112 State House Annex Trent.on, NJ 08625 Dr. Jill Lipoti, Ph.D New Jersey Department of Environmental Protection Division of Environmental Quality Radiation Protection Programs State of New Jersey CN 415 Trenton, NJ 08625 Maryland People 1s Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Salem Nuclear Generating Station Richard B. McGlynn, Commission Department of Public Utilities State of New Jersey 101 Commerce Street Newark, NJ 07102 Regional Administrator, Region I IJ. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Mr. Jack Urban General Manager, Fuels Department Delmarva Power & Light Company 800 King Street Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division ATTN:
Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486