Dock~t Nos.*50-272/311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service E1ectric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038 Dear Mr. Miltenberger; October 31. 1989 e
DISTRIBUTION Docket Fi le NRC PDR Local PDR PDI-2 Reading WButler JS tone
. MThadani MO'Brien(2)
OGC DHagan EJordan BBoger BGrimes RJones TMeek(8)
Wanda Jones JCalvo ACRS(lO)
GPA/PA JDyer Jlinvi lle Rita Jaques,
SUBJECT:
INADEQUATE CORE COOLING INSTRUMENTJl.TION (TAC NOS. 71106/71107 /74626/74627)
ARM/LFMB RE:
SALEM GENERATING STATION, UNIT NOS. 1 AND 2 Your letter of October 17, 1989 provided a schedule for upgrading the Reactor Vessel Level Instrumentation System (RVLIS) and the Subcooling Margin Monitor (SMM).
In addition, a proposal for interim technical specifications for the RVLIS was included.
The staff has reviewed your proposed schedule for upgrading the two systems.
The schedule for upgrading the SMM on Salem Unit 2 should be moved to the upcoming refueling outage, Spring 1990.
This is a TMI Action Plan issue that has been known since 1983.
It is expected that PSE&G will make a concerted effort to fully implement this requirement as soon as possible.
The proposed schedule for upgrading the SMM on Salem Unit 1, Fall 1990, is acceptable.
For RVLIS upgrade, your proposed schedule, Fall of 1991 for Salem.2 and Spring of 1992 for Salem 1, is acceptable.
Revised Technical Specifications, to be used in the interim, along the lines of those contained in your October 17, 1989 letter, should be submitted for RVLIS for both Salem units.
For the SMM the Technical Specifications should be brought into agreement with GL 83-37 at this time or revised interim technical specifications proposed.
We request that you.respond to the above within 60 days of receipt of this Tetter.
he repnrting cind/or record keeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
cc:
See next page
[r:IL TE~' ERGER LETTER]
P. fh'fi -
PD I-2/PM
~JJWJe'n
(\\{~Stone: tr l 011Jf39 r \\0 l~o /89 Sincerely~ ~
~
Stone, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation PDI-2/D I ~
WButler if
'~131/89
~~p\\
'\\\\1
\\.~jl.R REGu, _
"""i;,
e e
l~-*
0
~
'.011~
UNITED STATES
<:(
0 s:
~
NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 I'
')
~o Docket Nos. 50-272/311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038
Dear Mr. Miltenberger:
October 31, 1989
SUBJECT:
INADEQUATE CORE COOLING INSTRUMENTATION (TAC NOS. 71106/71107/74626/74627)
RE:
SALEM GENERATING STATION, UNIT NOS. 1 AND 2 Your letter of October 17, 1989 provided a schedule for upgrading the Reactor Vessel Level Instrumentation System (RVLIS) and the Subcooling Margin Monitor (SMM).
In addition, a proposal for interim technical specifications for the RVLIS was included.
The staff has reviewed your proposed schedule for upgrading the two systems.
The schedule for upgrading the SMM on Salem Unit 2 should be moved to the upcoming refueling outage, Spring 1990. This is a TMI Action Plan issue that has been known since 1983.
It is expected that PSE&G will make a concerted effort to fully implement this requirement as soon as possible. The proposed schedule for upgrading the SMM on Salem Unit 1, Fall 1990, is acceptable.
For RVLIS upgrade, your proposed schedule, Fall of 1991 for Salem 2 and Spring of 1992 for Salem 1, is acceptable.
Revised Technical Specifications, to be used in the interim, along the lines of those contained in your October 17, 1989 letter, should be submitted for RVLIS for both Salem units.
For the SMM the Technical Specifications should be brought into agreement with GL 83-37 at this time or revised interim technical specifications proposed.
We request that you respond to the above within 60 days of receipt of this letter. The reporting and/or record keeping requirements of this letter affect fewer than ten respondents; therefore, OMB clearance is not required under
- p. L.96-511.
cc:
See next page Sincerely, 2:ts;;e~
Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
\\
~
Mr. Steven E. Milt~nberger Public Service Electric & Gas Company cc:
Mark J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Kathy Halvey Gibson, Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Commission Drawer I Hancocks Bridge, NJ 08038 Richard F. Engel Deputy Attorney General Department of Law and Public Safety CN-112 State House Annex Trenton, NJ 08625 Dr. Jill Lipoti, Ph.D New Jersey Department of Environmental Protection Division of Environmental Quality Radiation Protection Programs State of New Jersey CN 415 Trenton, NJ 08625 Maryland People's Counsel American Building, 9th Floor 231 East Baltimore Street Baltimore, Maryland 21202 Salem Nuclear Generating S~ation Richard B. McGlynn, Commission Department of Public Utilities State of New Jersey 101 Commerce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Mr. Scott B. Ungerer MGR. - Joint Generation Projects Atlantic Electric Company P.O. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Mr. Jack Urban General Manager, Fuels Department Delmarva Power & Light Company 800 King Street Wilmington, DE 19899 Public Service Commission of Maryland Engineering Division ATTN:
Chief Engineer 231 E. Baltimore Street Baltimore, MD 21202-3486