Docket Nos. 50-272
50-311
Public Service Electric and Gas Company
ATTN:
Mr. S. E. Miltenberger
Vice President and Chief Nuclear Officer
P.O. Box 236
Hancocks Bridge, NJ
08038
Gentlemen:
10 MAY 1989
Subject:
Inspection No. 50-272/89-03; 50-311/89-03
This letter transmits the findings of the routine, resident safety inspection
conducted by Mrs. Kathy Halvey Gibson and Mr. Stephen M. Pindale from March
21, 1989 to April 30, 1989, at the Salem Nuclear Generating Station.
The
findings were discussed with Mr. Lynn K. Miller of your staff.
Based on the results of this inspection, it appears that the manning of the
Nuclear Safety Review Department does not meet Te~hnical Specification require-
ments, as set forth in the Notice of Violation enclosed herewith as Appendix A.
You are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
I am concerned about the apparently unexplained change in differential
pressure associated with Unit 2 steam flow indication.
A meeting has been
scheduled on May 15, 1989 at Region I to review this matter.
The letter also acknowledges receipt of your response to the vioiation cited
in the NRC Inspection Report 50-272/88-24; 50-311/88-27.
The acceptability of
your corrective actions will be reviewed in future inspections.
The response directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduc.tion Act of i980 PL-511.
Yo~r co6peration with us is appreciated.
Enclosures:
Sincerely,
Edward C. Wenzinger, Chief
Projects Branch No. 2
Division of Reactor Projects
1.
Appendix A, Notice of Violation
2.
NRC Inspection Report No. 50-272/89-03; 50-311/89-03
- 90510
() ~.5 (J (l (l 2 *7 :;~:
F'IiC
OFFICIAL RECORD COPY
CIR SALEM 89-03 -
05/11/89
0001.0.0 1\\ \\
_fo[J/
Public Service Electric and
Gas Company
cc w/encl:
2
s~ LaBruna, Vice President - Nuclear Operations
L. K.
Mill~r. General Manager - Salem Operations
10 MAY 1989
Jack Urban, General Manager, Fuels Department, Delmarva Power & Light
Co.
B. A. Preston, Manager, Licensing and Regulation
- S. Lingerer, Manager, Joint Generation Projects Department, Atlantic
Electric
M. J. Wetterhahn, Esquire, Conner & Wetterhahn
R. Fryling, Jr., Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC).
NRC Resident Inspector
State of New Jersey
bee w/encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
DRP Section Chief
G. Meyer, Senior Resident Inspector, Hope Creek
L. Rossbach, Senior Resident Inspector, Indian Point 2
Robert J. Bores, DRSS
TI Coordinator, DRP
J. Stone, NRR Project Manager
R. J. Kiessel, NRR
8. Clayton, EDO
l!J
,/!J
h (Dudley
Swet 1 and
5/ I 0/89
511 o /89
OFFICIAL RECORD COPY
5/ \\(:/89
~~~JI'
~ger
5//f' /89
CIR SALEM 89-03 - 0002.0.0
05/10/89