UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos. 50-272/311 Mr. Steven E. Miltenberger Vice President and Chief Nuclear Officer Public Service Electric & Gas Company Post Office Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Miltenberger:

RE:

SALEM GENERATING STATION April 14, 1989 The purpose of this letter is to request your prompt review and reporting of the status of implementation of TMI Action Plan Items at your facility.

As an enclosure we are providing a printout of all TMI items annotated where our tracking system indicates that implementation is not complete.

For the purpose of this request, implementation should be considered complete when, to the best of your knowledge, all actions necessary to satisfactorily meet the requirements of NUREG-0737 and NUREG-0737 Supplement 1 have been completed.

Where you have not fully completed an item as described above, we request that you mark-up the enclosure to reflect your projected implementation date.

Add a short note identifying remaining work (e.g., hardware, procedures, training, technical specifications). More explicit instructions are provided as part of the enclosure.

We request that this information reach this office by April 18, 1989.

The information we are requesting will be utilized to validate our existing data base so that we can accurately respond to congressional inquiries concerning the status of implementation of TMI Action Plan Items.

In view of the importance of the information we request your personal attention and certification that the information is correct to the best of your knowledge.

This request is covered by Office of Management and Budget Clearance Number 3150-0011, which expires December 31, 1989.

The estimated average burden hours is 40 person hours per owner response, including searching data sources, gathering and analyzing the data, and preparing the required letter. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Records and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission~ Washington, D.C.

20555; and to the Paperwork Reduction Project (3150-00llJ, Office of Management and Budget, Washington, D.C.

20503.

(~~-Oeo9r.0A4~2~1~0~3~1~8__,,8v9°0~4~1~4---~~~

I PDR ADOCK 05000272 II P

PDC

., Your prompt attention to this matter within the requested time frame is appreciated.

Sincerely, Thomas E. Murley, QJJLI:.e~w-Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/enclosure:

See next page

Mr. Steven E. Miltenberger Public Service Electric & Gas Company cc:

Mc J. Wetterhahn, Esquire Conner and Wetterhahn Suite 1050 1747 Pennsylvania Avenue, NW Washington, DC 20006 Richard Fryling, Jr., Esquire Law Department - Tower SE 80 Park Place Newark, NJ 07101 Mr. L. K. Miller General Manager - Salem Operations Salem Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. S. LaBruna Vice President - Nuclear Operations Nuclear Department P.O. Box 236 Hancocks Bridge, New Jersey 08038 Robert Traee, Mayor Lower Alloways Creek Township Munici pa 1 Ha 11 Hancocks Bridge, NJ 08038 Kathy Halvey Gibson, Resident Inspector Salem Nuclear Generating Station U.S. Nuclear Regulatory Co111T1ission Drawer I Hancocks Bridge, NJ 08038 Richard F. Engel Deputy Attorney General Department of Law and Public Safety CN-112 State House Annex Trenton, NJ 08625 Mr. David M. Scott, Chief Bureau of Nuclear Engineering Department of Environmental Protection State of New Jersey CN 411 Trenton, NJ 08625 Salem Nuclear Generating Station Richard B. McGlynn, Commission Department of Public Utilities State of New Jersey 101 Commerce Street Newark, NJ 07102 Regional Administrator, Region I U. S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Lower Alloways Creek Township c/o Mary 0. Henderson, Clerk Municipal Building, P.O. Box 157 Hancocks Bridge, NJ 08038 Mr. Bruce A. Preston, Manager Licensing and Regulation Nuclear Department P.O. Box 236 Hancocks Bridge, NJ 08038 Mr. David Wersan Assistant Consumer Advocate Office of Consumer Advocate 1425 Strawberry Square Harrisburg, PA 17120 Scott B. Ungerer I

MGR. - Joint Generation Projects Atlantic Electric P*. 0. Box 1500 1199 Black Horse Pike Pleasantville, NJ 08232 Delmarva Power & Light Company c/o Jack Urban General Manager, Fuel Supply 800 King Street P.O. Box 231 Wilmington, DE 19899

~-*

  • Your prompt attention to this matter within the requested time frame is appreciated.

Enclosure:

As stated cc w/enclosure:

See next page DISTRIBUTION: w/encl.

Docket File MRC PDR/LPDR PDI-2 Reading SVarga/BBoger MO'Brien JStone/MThadani OGC EJordan BGrimes ACRS (10)

TMurley JSniezek JPartlow

[SALEM TMI]

~DI-2/PM PDI-2/Dl/> NRR/DONRR WButler TMurley u 1rm1~~r t.f-!jl\\-f89 I

/8~

Sincerely,

/SI Thomas E. Murley, Director Office of Nuclear Reactor Regulation J

. l

---1--

.. e.

£ NCLOSU 12. 6 GUIDELINES FOR UPDATING TMI STATUS

1.

The enclosure provides a compll!te lict-inn nf a11 TNT *'!q11irements from NUREG-0737 and NUREG-0737 Supplement 1. Regulatory Guide 1.97 requiretnents. although addressed 1n Supple~nt 1 to NUREG-0737, are excluded since they did not or1g1nate fro11 the TKI Action Plan. This 11st1ng consists of a 111trix of 1tems applicable to both operat1ng reactors and operating license app11cants (NTOLS) as of Novmm>er, 1980, as shown 1n KUREG-0737 Enclosure 1 and 2, respectively. All 1tells which are not listed 1dent1cally in Enclosure 1 and 2 are 111rked w1th asterisks to indicate differences between operat1ng reactor and NTOL requ1r111ents.

Whenever these differences occur, enter data 1n accordance with the appropriate t1tle, regardless of the TMI Action Plan ite~ nulllber 11sted.

Your KRC Project Manager has indicated which issues are shown as uni111ple11ented in the KRC tracking syste*. Please review the entire listing for each licensed reactor unit. Where an 1te. was not applicable for your facility, 1111rk N/A 1n the implementation status colu11n.

2.

Where an 1te* was applicable to your facility but no changes were necessary. 1111rk NC in the 1mplementat1on status column.

3.

Where an item was applicable to your facility and changes are COll!plete mark C 1n the 1111pleinent1tion status colu1111.

If the date is readily available (1110nth and year) we request you provide ft, however, C ts sufficient.

4. *Where an item was applicable to your fac111~ and fs not fully 111plement1d, provide your projectep implementation d1t1 (110nth and*

year) end 1 short note identifyi~g the outstanding item (e.g. hardware, procedures, tr11n1ng, technical specif1cat1ons).

£ NCLOSU rz G GUIDELINES FOR UPDATING TMI STATUS

1.

The enclosure provides a compl"-!te 1fc:t1nn rif,.11 TMT "~quirements from NUREG-0737 and NUREG-0737 Supplement 1. Regulatory Guide 1.97 requirements. although addressed 1n Supple111t:nt 1 to NUREG-0737, are excluded s1nce they did not or1g1nate fl"Oll the TMI Action Plan. This listing consists of a matrix of items applicable to both operat1ng reactors and operating license app11cants (NTOLS) as of November, 1980, as shown in NUREG-0737 Enclosure 1 and 2, respectively. All ttems which are not 11sted identically in Enclosure 1 and 2 are 111arked wtth asterisks to fndfcate differences between operat1ng reactor and NTOL requ1r111ents.

Whenever these differences occur, enter data 1n accordance with the appropriate title, regardless of the TMI Action Plan ite~ nullber 11sted.

Your NRC Project Manager has tndicated wh1ch issues are shown as unimplemented in the NRC tracking system. Please review the entire lfsttng for each licensed reactor un1t. Where an item was not applicable for your facility, ~rk N/A in the implementation status colu111n.

2.

Where an item was appl1cable to your fac1lity but no changes were necessary, 11ark NC in the implementation status column.

3.

Where an item was applicable to your facility and changes are complete mark C 1n the tinplementation status column. If the date is readily available (111anth and year) we request you provide 1t, however, C 1s sufficient.

4. *Where an 1tem was app11cab1e to your facf 11ty and fs not fully t11plemented, provide your projected implementation date (month and*

year) and a short note tdent1fy1ng the autstanding ftem (e.g. hardware, procedures, tra1n1ng, technical spectf1cattons).

SALEM l/NIT I MULTI-PLANT ISSUE NUMBER ACTION NO.

1.A.1.1.1

  • I.A.1.1.2
  • I.A.l.1.3 FOOl
  • I.A.1.1.4 l.A.1.2 l.A.1.3.l F002 I.A.l.3.2 F002 1.A.2.1.1 I.A.2.1.2 l.A.2.1.3 l.A.2.1.4 F003
1. A. 2.1. 5 I.A.2.3 I.A.3.1.l

. l.A.3.1.2 l.A.3.1.3.A I.A.3.1.3.B "1.B.1.2 1.C.l.l l.C. 1.2.A F004 l.C.l.2.B F004 l.C.l.3.A FOOS I.C. 1.3.B F005 I. C. 2 I. C. 3 I. C. 4 l.C.5 F006 l.C.6 F007

  • I.C.7.1
  • I.C.7.2
  • I.C.8 1.0. 1 (See FOOS & F071) l.0.2.l F009 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS 6HI~T TECHNICAL ADVISOR - ON DUTY *****.,., *....*................***.***.******************************.*.**************.*

SHI T TECHNICAL ADVISOR - TECH SPECS ****..**.................*********************************************************

SHIFT TECHNICAL ADVISOR - TRAINED PER LL CAT B...............****.*************************.******************, ******* ::

SHIFT TECHNICAL ADVISOR - DESCRIBE* LONG TERM PROGRAM..........***************************************.******,:. ~.,~, ****

SHIFT SUPERVISOR RESPONSIBILITIES *********.**.............**.****.***.**.****************************..******* N. ~ ******

SHIFT MANNING - LIMIT OVERTIMES **************...*...........*.**********************************.******.****************

SHIFT MANNING - MIN SHIFT CREW **********.**.*..... -..............************************.*******************************

lfltE.DIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - SRO EXPER ***..*.****** ~ ************************.********* ~ *********

lfltEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - SRO'S BE RO'S lYR ********************.*****************************

ltl'IEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - 3 MO. TRAINING.*.**.***********************************.***********

ltl'IEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - MODIFY TRAINING *.*******.***.**************** *: *********************

Itl'IEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - FACILITY CERTIF ****************************************************

ADMINISTRATION OF TRAINING PROGRAMS **.**.*..*..*............*.***.****.*..*. * * * * * * * * * * * * * * * * *

  • r * * * * * * * * * * * * * * * * * * * * * * * *
  • REVISE SCOPE & CRITERIA FOR LICENSING EXAMS - INCREASE SCOPE..***.***************.****.*****..*****.*******.****.*******

REVISE SCOPE & CRITERIA FOR LICENSING EXAMS - INCREASE PASSING GRADE ***.****.*******.*******.*..**.*.*.****.*********.**

REVISE SCOPE & CRIT. FOR UC. EXAMS - SIMULATOR PLANTS WITH SIMULATORS ****.**********.*****.**..*..********.*** * **** *... ~.

REVISE SCOPE & CRIT. FOR UC. EXAMS - SIMULATOR.;. OTHER PLANTS *.*.********** ~ ********.**.********.****** *.**************

EVALUATION OF ORGANIZATION & MANAGEMENT..*..................*.**.*******.*.****.*****.***. * **. * * * * * * * * * * * * * * * * * * * * * * * * *

  • SHORT-TERM ACCIDENT & PROCEDURES REVIEW - SB LOCA.............***.*.*******.**.********.* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • SHORT-TERM ACCID. & PROCEDURES REV. - INADEQ. CORE COOL. REANAL. GUIDELINES ***.***************.**.******.*.***.*.*******

SHORT-TERM ACCID. & PROCEDURES REV. - INADEQ. CORE COOL. REVISE PROCEDURES.**.*******.*********.********.******..*******

SHORT-TERM ACCID. & PROCEDURES REV - TRANSIENTS & ACCDTS. REANAL GUIDELINES (PROC. GEN. PKG.).*****************.*.*****.

SHORT-TERM ACCID. & PROCEDURES REV. - TRANSIENTS & ACCDRS. REVISE PROCEDURES (UPGRADED EOP' S) ***** * * * * * * * * * * * * * *.* * * * * * *.-

SHI FT & RELi EF TURNOVER PROCEDURES.***..*..*............. :..*.*..***.*.******* * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • SHIFT-SUPERVISOR RESPONSIBILITY ***.***.....*.................**.******* *****************************************.********

CONTROL -ROOM ACCESS *******************.......*. * * * *. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • FEEDBACK OF OPERATING EXPERIENCE *******..*.....*........ **..*.* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • VERIFY CORRECT PERFORMANCE OF OPERATING ACTIVITIES............******.**************** ***********************************

NSSS VENDOR REV. OF PROC -

LOW POWER TEST PROGRAM..........**.*.**** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • NSSS VENDOR REV. OF PROC -

POWER ASCENSION & EMER~ PROCS..*..********* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • Pl LOT tl>N OF SELECTED EMERGENCY PROC FOR NTOLS................ * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

~CONTROL-ROOM DESIGN REVIEWS (ENTER DATA FOR MPA FOOS & MPA F-071) ********************.*****.*..*.*.*.**..*...***.*.*..*

PLANT-SAFETY PARAMETER DISPLAY CONSOLE - DESCRIPTION..........*.** **.*.*.************************************~********** * !*

.. ~ *.

MULTI-PLANT ISSUE NUMBER ACTION NO.

I.D.2.2 F009 1:0.2.3 F009

  • I.G.1.1
  • I.G.1.2
  • I.G.1.3 II.B.1.1 II.B.1.2 FOlO II.B.1.3 FOlO II.B.2.1
  • II.B.2.2
  • II.B.2.3 FOll
  • II.B.2.4
  • II.B.3.1
  • II.B.3.2
  • II.B.3.3
  • II.B.3.4 F012 II.B.4.1 F013
  • II.B.4.2.A F013
  • II.B.4.2.B F013 II.D.1.1
  • II.D.1.2.A
  • II.D.1.2.B F014 II.D.1.3
  • II.D.3.1
  • II.D.3.2
  • II.E.1.1.l FGlS (SEE NOTE 1)
  • II.E.1.1.2 FOlS (SEE NOTE 2)

II.E.1.1.3 FOlS (SEE NOTE 3)

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

  • PLANT-SAFETY PARAMETER DISPLAY CONSOLE.,. INSTALLED.........**...*..*........*.*..*..***.*..*...*.*........**..**.*.*.*..

PLANT-SAFETY PARAMETER DISPLAY CONSOLE - FULLY IMPLEMENTED *....*.*...*.....*....**.*..*.*...*..*.....*....*...*..*...**.

TRAINING DURING LOW-POWER TESTING -

PROPOSE TESTS...............**.......*.*.....*.....*......*............********.....

TRAINING DURING LOW-POWER TESTING - SUBMIT ANAL. & PROCS.....*...**....***.....*....*.*.*..*.***..*.......**.*** : ***.*.*

TRAINING DURING LOW-POWER TESTING - TRAINING & RESULTS..........*..*...****....*.*...*.**.*.******..........***.**.**..*

REACTOR-COOLANT SYSTEM VENTS - DESIGN VENTS.*.............**...***..**.......**.**.....*..*..*..*.***......**..**.****..

REACTOR-COOLANT SYSTEM VENTS - INSTALL VENTS (LL CAT B)......**........*.*...*..***.*.****.......*.........********.*...

-ft' REACTOR-COOLANT SYSTEM VENTS - PROCEDURES.**.*.............**..,..*...**......*.********.****....*..*..*...***.*..*..*..

PLANT SHIELDING - REVIEW DESIGNS ****.*.***...*.*..............*...*.*...***.*......*****.******....**.*.*..*.**.*.**.*..

PLANT SHIELDING - CORRECTIVE ACTIONS TO ASSURE ACCESS.. *..*.*.*..*.......*..**......******.***.****.*...*...**.***..*..**.

PLANT SHIELDING -

PLANT MODIFICATIONS (LL CAT B)...................*.......*...*.*..**..*...***.*..**.*.....*.*...... * *

  • PLANT SHIELDING - EQUIPMENT QUALIFICATION-NOT TRACKED AS A TMI ACTION ITEM..*...***..*.***...*....**.*.**.*..*.*..*.*.*

POSTACCIDENT SAMPLING - INTERIM SYSTEM.*.*......*..........**.*...**.*..******...**.*..**.*** ~....*.*... * * * * * * * * * * * * * * *

  • POSTACCIDENT SAMPLING - CORRECTIVE ACTIONS................**.***..*..**...*.*..**.*.*.....*.....*. * *..*. ****.. **********

POSTACCIDENT SAMPLING - PROCEDURES...**.*...*.......*.........*...**..**.....**...*..**.*. * * * * * * * * * * * * * * * * * * * * * * * * * * * ** *

  • POSTACCIDENT SAMPLING - PLANT MODIFICATIONS (LL CAT B) *......*.....**.**.****..*...*****.*....*.* * * * * * * * * * * * * * * * * * * * * * *
  • TRAINING FOR MITIGATING CORE DAMAGE - DEVELOP TRAINING PROGRAM.....*....*....*....**..****..*. *.. ***********************

TRAINING FOR MITIGATING CORE DAMAGE - INITIAL...........*.....*...*.*.*..**.*. *.... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • TRAINING FOR MITIGATING CORE DAMAGE - COMPLETE.............****.*...*.***.*... * * *.* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • RELIEF & SAFETY VALVE TEST REQUIREMENTS - SUBMIT PROGRAM......**..*...*........*.*...***...*....*.....*.........*...**..

RELIEF & SAFETY VALVE TEST REQUIREMENTS - COMPLETE TESTING....*.*.****.*.**. ********************************************

RELIEF & SAFETY VALVE TEST REQUIREMENTS - PLANT SPECIFIC REPORT...*......**.* *.** *. *************************************

RELIEF & SAFETY VAVLE TEST REQUIREMENTS - BLOCK-VALVE TESTING.***..**.....**...*..**.**.** * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • VALVE POSITION INDICATION - INSTALL DIRECT INDICATIONS OF VALVE POS *..***....*.**.....**..*.**..*...*..*..*..*. ********

VALVE POSTION INDICATION - TECH SPECS *...*........*.........*.*.****.....***** *.**. **************************** * * * * * * *

  • AFS EVALUATION-ANALYSIS ******.***.***.**.**..*...........*..**.*.****.* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • AFS EVALUATION-SHORT TERM MODS.****.****....**.*..*....*...*.*****.**. * * * * * * * * * * * * *; * * * * * * * * * * * * * * * * * * * * * * * * * *
  • AFS -LONG TERM MODS **.*.***.*.**.**....*....*........... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • NOTE 1 - THE ITEM LISTED IS FROM NUREG-0737, ENCLOSURE 2 AND IS APPLICABLE TO NTOLS'S ONLY NOTE 2 - THE ITEM LISTED IS FOR ALL PLANTS (OPERATING REACTORS AND NTOL'S)

NOTE 3 - THE ITEM LISTED IS FOR ALL PLANTS (OPERATING REACTORS AND NTOL'S)

MULTI-PLANT ISSUE NUMBER ACTION NO.

II.E.1.2.l.A Il.E.l.2.1.B F016 II.E.1.2.2.A

  • II.E.1.2.2.B
  • II.E.1.2.2.C F017
  • II.E.3.1.1
  • II.E.3.1.2 II.E.4.1.1
  • II.E.4.1.2
  • II.E.4.1.3 F018 II.E.4.2.1*:.-4
  • II.E.4.2.5.A
  • II.E.4.2.5.B Il.E;4.2.6 F019 Il.E.4.2.7 F019
  • II.E.4.2.8
  • II.F.1.1 F020
  • II.F.1.2.A F020
  • II.F.1.2.B F021
  • II.F.1.2.C F022
  • II.F.1.2.D F023
  • II.F.1.2.E F024
  • II.F.1.2.F F025
  • Il.F.2.1
  • II.F.2.2
  • II.F.2.3 F026
  • II.F.2.4 F026.
  • II.G.1.1
  • II.G.1.2 ll.K.l (Oper. Reactors Only)

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS ftFS INITIATION & FLOW-CONTROL GRADE.....................................................................................

AFS INITIATION & FLOW - SAFETY GRADE....................................................................................

AFS INITIATION & FLOW - FLOW INDICATION CONTROL GRADE...................................................................

AFS INITIATION & FLOW - LL CAT A TECH SPECS...................................................................... ~*......

AFS INITIATION & FLOW - SAFETY GRADE....................................................................................

EMERGENCY POWER FOR PRESSURIZER HEATERS - UPGRADE POWER SUPPLY..........................................................

EMERGENCY POWER FOR PRESSURIZER HEATERS - TECH SPECS......... ~...................... ~...................................

DEDICATED HYDROGEN PENETRATIONS - DESIGN................................................................ *...............

DEDICATED HYDROGEN PENETRATIONS - REVIEW & REVISE H2 CONTROL PROC.......................................................

DEDICATED HYDROGEN PENETRATION - INSTALL.............................................................. *. *..... * * * * * * * * *

  • CONTAINMENT ISOLATION DEPENDABILITY - IMP. DIVERSE ISOLATION.............................................................

CONTAINMENT ISOLAT. DEPENDABILITY - CNTMT PRESS. SETPT. SEECIFIY PRESS..................................................

CONTAINMENT ISO~TION DEPENDABILITY - CNTMT PRESSURE SETPT. MODS.............................. r*************************

CONTAINMENT ISOLATION DEPENDABILITY - CNTMT PURGE VALVES..................................... **.. ***********************

CONTAINMENT ISO~TION DEPENDABILITY - RADIATION SIGNAL ON PURGE VALVES..................................................

CONTAINMENT ISOLATION DEPENDABLITY - TECH SPECS.................................................................. **... ~**

ACCIDENT - MONITORING - PROCEDURES.................................................................. *****.. *.***********

ACCIDENT - MONITORING - NOBLE GAS MONITOR............................................................ ****.*.. ***********

ACCIDENT - MONITORING - IODINE/PARTICULATE SAMPLING.....................................................................

ACCIDENT - MONITORING - CONTAINMENT HIGH-RANGE MONITOR....................................... **.**:.********************

ACCIDENT - MONITORING - CONTAINMENT PRESSURE........................................ *..... ******************************

ACCIDENT - MONITORING - CONTAINMENT WATER LEVEL.................................. * * * *.... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • ACCIDENT - MONITORING - CONTAINMENT HYDROGEN....................................... **.... *******************************

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - PROCEDURES.............. ****...... *.... ***.. *******.. ******.. **

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING - SUBCOOL METER.................................................. --

INSTRUMENTATION FOR DETECT.. OF INADEQUATE CORE COOLING - DESC. OTHER....................................................

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE CLING INSTLL ADD 1L INSTRUMENTATION.......................................

POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - UPGRADE.................................................

POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - TECH SP.................................................

IE BULLETINS 05, 79-06, 79-08............................ * *....... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • MULTI-PLANT ISSUE NUMBER ACTION NO.
  • II.K.1.5
  • I I. K.1.10
  • II. K. l. 20
  • II.K.1.21
  • I I. K.1. 22
  • II.K.1.23
  • II.K.2.2
  • II.K.2.8 II.K.2.9 F027 II.K.2.10 F028
  • II.K.2.11 F029 II.K.2.13 F030 II.K.2.14 F031 I I. K. 2.15 II.K.2.16 F032 II.K.2.17 F033 II.K.2.19
  • II.K.2.20 F035
  • 11.K.3.l.A F036
  • 11.K.3.l.B Il.K.3.2 F037 11.K.3.3 F038 II.K.3.5.A F039 II.K.3.5.B F039 II.K.3.7 11.K.3.9 F040 II.K.3.10

. F041 11.K.3.ll I I. K. 3. 12. A II.K.3.12.B F042 11.K.3.13.A F043 ll.K.3.13.B F043 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

  • IE BULLETINS - REVIEW ESF VALVES ******. ~.**.****..*..*.....*.*..*.**.*********...*****.*******.**.*******.************...

IE BULLETINS - OPERABILITY STATUS *****..***.**...*.*..*...**..**.*.***.*****.***.**.*.*************...***...**********.**

IE BULLETINS -

PROMPT MANUAL REACTOR TRIP.*.................*.*.**..**.*.*..*****.*.***.***.*..***.***..*************.**

IE BULLETINS -

AUTO SG ANTICIPATORY REACTOR TRIP.....*.**..****.*..***.**..*******..***.*****.*******.*.*.****** : ****...

IE BULLETINS - AUX. HEAT REM SYSTEM, PROC.*.................*.*..*..*.*...**.*****..*...***.***..***..*.*..*************

IE.BULLETINS -

RV LEVEL, PROCEDURES ****..**.*.*......*...*.*.**.****.** ** *********. *************************************

A ORDERS ON B&W PLANTS -

PROCEDURES TO CONTROL AFW IND OF ICS............................................................. _.

ORDERS ON B&W PLANTS -

UPGRADE AFW SYSTEM ***.....*.........**.*...*****..***.****..******.....********* *..*****.***. * * *

  • ORDERS ON B&W PLANTS -

FEMA ON ICS ********.*.***.*.*.....*.*..******...*.****.****.****.**....**.***..********.***** * * *

  • ORDERS ON B&W PLANTS -

SAFETY-GRADE TRIP......................................................... -......................

ORDERS ON B&W PLANTS - OPERATOR TRAINING.**...*..****.....**..****..**.**..****.***.*****.*........******.****.***.****.

ORDERS ON B&W PLANTS -

THERMAL MECHANICAL REPORT (CE & W PLANTS ALSO).****.******.***..*.****..*..***.*****.*******...*.

ORDERS ON B&W PLANTS - LI FT FREQUENCY OF PORV' S & SV' s....................................... *...........................

ORDERS ON B&W PLANTS -

EFFECTS OF SLUG FLOW......................................................................... * * *

  • ORDERS ON B&W PLANTS -

RCP SEAL DAMAGE.......................................................................... * * * * * * *

  • ORDERS ON B&W PLANTS - VOIDING IN RCS (CE & W PLANTS ALSO).*.***.************.*.*******.*.**.****.**..*..*****..******.*

BENCHMARK ANALYSIS OF SEQUENTIAL AFW FLOW TO ONCE THROUGH STM GENERATOR ***.*..***.***...*..***...**.**********.***....*.

ORDERS ON B&W PLANTS -

SYSTEM RESPONSE TO SB LOCA.......................................... * * * * * * * * * *.. * * * * * * * * * * * * * * * *

  • B&O TASK FORCE - AUTOMATIC PORV ISOLATION DESIGN.................*.*.**.**.*****...*...* * ** *****************************

FINAL RECOMMENDATIONS, B&O TASK FORCE - AUTO PORV ISO TEST/INSTALL *******.*..*.*.*.*.****.*.*..****.***.**.*.....*...**.

B&O TASK FORCE -

REPORT ON PORV FAILURES **.................*.*******.*********. **** ** ***********************************

8&0 TASK FORCE - REPORTING SV & RV FAILURES AND CHALLENGES............................. *********************************

B&O TASK FORCE - AUTO TRIP OF RCP'S PROPOSED MODIFICATIONS...**.*.*.*...*******.***.*********.***.****.****.******...*..

A 8&0 TASK FORCE - AUTO TRIP OF RCP' S MODIFICATIONS......*.*.*******.***********.*.*****.*.** ** ** *************************..

B&o TASK FORCE - EVALUATION OF PORV OPENING PROBABILITIES..***********.***.***.*********.** * *.* * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE - PID CONTROLLER MODIFICATION.*.....*......*.*.*****.***************.*** ~********************************

B&o TASK FORCE -

PROPOSED ANTICIPATORY TRIP MODIFICATIONS ***.*********.**************** *********************************

B&O TASK FORCE - JUSTIFY USE OF CERTAIN PORV...***.......***.*****************.******** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE - ANTICIPATORY TRIP ON TURBINE TRIP PROPOSED MODS........................ ********.... ***.... *.. **.. *....
  • B&O TASK FORCE - ANTICIPATORY TRIP ON TURBINE TRIP INSTALL MODS.......*.*..*.*.*********.********.*****...*....*...*..*.

B&O TASK FORCE - HPCI & RCIC SYSTEM INITIATION LEVELS ANALYSIS............................ ****************.. *.. **.. *.. **

B&O TASK FORCE - HPCI & RCIC INITIATION LEVELS MODIFICATION..*....*.*********.*..*..**......**....**...**....*...*..**..

MULTI-PLANT ISSUE NUMBER ACTION NO.

  • II.K.3.14 f 044 II. K. 3.15 f 045 I I. K. 3.16A f 046 I I. K. 3. 16. B f 046 II.K.3.17 F047 I I. K. 3. 18. A f 048 I I. K. 3. 18. B f 048 I I. K. 3. 18. C f 048
  • II.K.3.19 f 049
  • I I. K. 3. 20 II.K.3.21.A f 050 II.K.3.21.B f 050 Il.K.3.22.A f 051 II.K.3.22.B f 051 Il.K.3.24 f 052 Il.K.3.25.A Il.K.3.25.B F053 II.K.3.27 F054 I I. K. 3. 28 f 055
  • I I. K. 3. 29 F056 II.K.3.30.A II.K.3.30.B F057 I I. K. 3. 30. C I I. K. 3. 31 F058
  • I I. K. 3. 40
  • II.K.3.43 Il.K.3.44 f 059 11.K.3.45 F060 I I. K. 3. 46 F061
  • Il.K.3.57 F062 Ill.A.1.1 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS
  • B&O TASK FORCE -

ISO CONDENSER ISOLATION ON HIGH RAO...*..*..*..******.***********.***.**********.***..*..**.*******..*.

B&o TASK FORCE - MODIFY HPCI & RCIC BRK DETECTION CIRCUITRY...*.*.****************.****.. ~.****.*********.**********.***

B&o TASK FORCE -

CHALLENGE & FAILURE OF RELIEF VALVES STUDY.**.....*.*..***.*..*.***********.********..*.***********.***

B&o TASK FORCE -

CHALLENGE & FAILURE OF RELIEF VALVES MODIFICATIONS **.....****..**...*.***.*...*****.*....***********.*.

B&o TASK FORCE -

ECC SYSTEM OUTAGES.***..*..................**.*.**********.*...*******.******..**.*.*..****************

B&o TASK FORCE -

ADS ACTUATION STUDY **..****..*...*.........**.*******.*.**...***.*.***.************...***.**********.*.

B&o TASK FORCE -

ADS ACTUATION PROPOSED MODIFICATIONS.......*********.****.*****..***.*****.*****.*.**...*************.*

B&O TASK FORCE - ADS ACTUATION MODIFICATIONS.*.......*..********.*****....**.*****.**********.*****.*.**...********...*.

B&O TASK FORCE -

INTERLOCK RECIRCULATORY PUMP MODIFICATIONS ***.**..*****..***...**...******************..*****.****.*.*.

B&o TASK FORCE -

LOSS OF SVC WATER AT BRP *.*****......*...*..**..*.*.***.*******.****.*...****.** _ ***..***.**.*******.***

B&o TASK FORCE -

RESTART OF CSS & LPCI LOGIC DESIGN.......*...**..*.***..***...*..*....****.*..*********....***.**..***.

B&o TASK FORCE -

RESTART OF CSS & LPCI LOGIC DESIGN MODIFICATIONS **.**...******.***.*.*.*****.****.****.*.***.*..*...***

B&o TASK FORCE - RCIC SUCTION VERIFICATION PROCEDURES.**************************************'***************************

B&o TASK FORCE - RCIC SUCTION MODIFICATION.............**..******..*..******.**.*.****.**.*********.*.* * ** **************

B&O TASK FORCE -

SPACE COOLING FOR HPCl/RCI LOSS OF AC POWER **....*.*.************....***.*.*.**..**.* * * * * ** * * * * * * * * *** *

  • B&O TASK FORCE -

POWER ON PUMP SEALS PROPOSED MODIFICATIONS...*..***....***.****..****.....*...... * **** *****************

B&O TASK FORCE -

POWER ON PUMP SEALS MODIFICATIONS......*.......***..**.********.**.**.**.*** * * ** * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE -

COMMON REFERENCE LEVEL FOR BWRS.....*.*..*.*****...**.*..**.....**.**.* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&o TASK FORCE - QUALIFICATION OF ADS ACCUMULATORS.*.......*.....***..*..********..*.**...*.*..**.*....**.*.***.**..*.*.

B&o TASK' FORCE -

PERFORMANCE OF ISOLATION CONDENSERS..****....*.*.**.*.*..*...**..****** ********************************

B&O TASK FORCE -

SCHEDULE FOR OUTLINE OF SB LOCA MODEL.*....**..*.**..*****.*******..*.......*.*****.*...*.*.*....*.***.

B&o TASK FORCE -

SB LOCA MODEL, JUSTIFICATION *..*.**.*......*...**.*..*. ************************************************.

B&o TASK FORCE -

SB LOCA METHODS NEW ANALYSES.*.***..*...*......*******. ************************************************

B&O TASK FORCE - COMPLIANCE WITH CFR 50. 46...***.**..*.....*...***.*..** * * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE -

RCP SEAL DAMAGE -

COVERED BY II. K. 2.16 ANO II. K. 3. 25 *********.****.***.** ** * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE -

EFFECTS OF SLUG FLOW -

COVERED BY II. K. 2.15.***.*********************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&o TASK FORCE ~ EVALUATE TRANSIENT WITH SINGLE FAILURE....*..*.*************.********** ********************************

B&o TASK FORCE - ANALYSES TO SUPPORT ***..*.**....*.......***.***************** * * * * * * * * ~ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • RESPONSE TO LIST OF CONCERNS FROM ACRS CONSUL TANT..*.....******************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • IDENTIFY WATER SOURCES PRIOR TO MANUAL ACTIVATION OF ADS..**.**************** *******************************************

EMERGENCY PREPAREDNESS, SHORT TERM ****...**.*.........*.. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • MULTI-PLANT ISSUE NUMBER ACTION NO.

111.A.l.2.1 111.A.1.2.2 (SEE F063, 111.A.1.2.3 (SEE F063, 111.A.2.l 111.A.2.2

  • 111. D. l.1.1
  • 111.D.l.l.2 111.D.3.3.1

.111.D.3.3.2 IIl.D.3.4.l

  • 111.D.3.4.2
  • III. D. 3.4. 3 MPA-F008 MPA-F063 MPA-F064 MPA-F065 MPA-F071 MPA-8072 MPA-8083 67.4.l F064, F065)

F064, F065)

F067 F068 F069 f 070 f 070 FOOS f 063 f 064 f 065 f 071 B072 B083 GOO!

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

'UPGRADE EMERGENCY SUPPORT FACILITIES - INTERIM TSC OSC & EOF..*.*.**..****..**.*..*.********...***..*....*.*********..**

UPGRADE EMERGENCY SUPPORT FACILITIES-DESIGN-INCORP. INTO F063/F064/F065 ***.** ~ *.*.****.***.****.**.**.****..*********.**

UPGRADE EMER SUPPORT FACILITIES -

MODS INCORPOR. INTO F063, F064 & FOGS....***..*.*.*..*.**.*******.***..************.**

UPGRADE PREPAREDNESS - UPGRADE EMERGENCY PLANS TO APP. E. 10 CFR 50..* ~.*.*..*.*.*.**********.*..*..*****.*********** ~ *.

UPGRADE PREPAREDNESS - METEOROLOGICAL DATA ***.*..........**..****..*....****....*.*****.**.*.*..*****.*.***.***.*****..*

PRIMARY COOLANT OUTSIDE CONTAINMENT - LEAK REDUCTION...*..*...***......**..****.*.**.*...**..*.**.*.**.***.**********..*

PRIMARY COOLANT OUTSIDE CONTAINMENT - TECH SPECS.......*......*.......****.*.*******..**..*.*....**.****..*.*********.*.

INPLANT RAD. MONIT. - PROVIDE MEANS TO DETER. PRESENCE OF RADIOIODINE ****..**.**.*..*********.*.*..**.**..********.*...**

INPLANT RADIATION MONIT. - MODIFICATIONS TO ACCURATELY MEAS. IODINE **.....**....*.*.***.****..**..*.*.***.*.*.*.*.**.*..

CONTROL ROOM HABITABILITY - REVIEW ****..****.*.....*.*.*.*... * ***..*...*..*..*.*.*.*.**.*..****.*.*..*****. *.***..***** **

CONTROL ROOM HABITABILITY - SCHEDULE MODIFICATIONS.....**..*..***.*.******.****.******...**** :..********* *** *** *********

CONTROL ROOM HABITABILITY -

IMPLEMENT MODIFICATIONS.*....*..*.****.*...***.*.***.**...*.*****..*** *** *..* ****************

1t I. D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN......*.***.******.**.****.**.***.* *. * *.* * * * * * * * * * * * * * * * * * * * * ***

  • I I I. A.1. 2 TECHNICAL SUPPORT CENTER *****.*.*.*..*..*....*.....**...**.*****.**********..**. * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • 111.A.l.2 OPERATIONAL SUPPORT CENTER.*.* ;..*....*.*.*.....*..*.******..****..*.*.*. *************************************

III.A.1.2 EMERGENCY OPERATIONS FACILITY.*..*..**...........*..*...*..*********..*.*.****. *******************************

°* I.0.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO F-8)..**. ~..***.***.*.***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *.*. *

  • NUREG-0737 TECH SPECS (GENERIC LETTERS 82-16 & 83-02)...**...***...**.*..**** * ** ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • 7'-TECH SPEC COVERED BY GENERIC LETTERS 83-26 & 83-37 FOR NUREG-0737 **....***.********.****.*.**.*.*..**.***....**.*....*.*

REACTOR COOLANT PUMP TRIP (GENERIC LETTER 85-12) *.......*..*.****......*****...******.*******......****..**..**.****.*.*...

\\

MULTI-PLANT ISSUE NUMBER ACTION NO.

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS I.A.1.1.l

  • I.A.1.1.2
  • I.A.l.1.3 FOO!
  • I.A.l.1.4 l.A.1.2 I.A.l.3.1 F002 l.A.1.3.2 F002 l.A.2.1.1 1.A.2.1.2 I.A.2.1.3 J.A.2.1.4 F003 1.A.2.1.5 l.A.2.3 1.A.3.1.l 1.A.3.1.2 J.A.3.1.3.A 1.A.3.1.3.8

,..1.B.1.2 J.C.1.1 l.C. 1.2.A F004 J.C. 1.2.B F004 l.C.1.3.A FOOS l.C.1.3.B FOOS I. c. 2 I. C. 3 I. C. 4 I. C. 5 F006 l.C.6 F007

  • J.C.7.1
  • J.C.7.2
  • I.C.8 J.U. 1 (See FOOS & F071) l.D.2.1 F009

~~IFT TECHNICAL ADVISOR -

ON DUTY ******,.***..*.................*.***********************************.******************

SH~FT TECHNICAL ADVISOR - TECH SPECS ****..**.....*.........*.**.********************************************************

FT TECHNICAL ADVISOR - TRAINED PER LL CAT B.*...........*.***.*.**********************.********************, *********

SHIFT TECHNICAL ADVISOR - DESCRIBE LONG TERM PROGRAM.........***.***********.******.************************ ~:*~~,.~if*; ******

SHIFT SUPERVISOR RESPONSIBILITIES ******.*.**.........*....**..******.*************************************** ~. 'i.<

1 *******

SHIFT MANNING - LIMIT OVERTIMES **********......*..........**.*.*********************************************************

SHIFT MANNING - MIN SHIFT CREW *************.*.****.........* *...*.*****************.*************************************

ltltEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - SRO EXPER **..***.***********************************************.**

ltltEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - SRO'S BE RO'S lYR **** * ******************************..**************

ltlfEDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - 3.MO. TRAINING ****.*********************************************.**

Ul4EDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - MODIFY TRAINING ********************.** ~ ***** :* *************.*****.**

1"'1EDIATE UPGRADING OF RO & SRO TRAINING AND QUAL. - FACILITY CERTIF **********************.*****************.***********

ADMINISTRATION OF TRAINING PROGRAMS ****.*..*...*............**.****************************.*,.***************.*** * *****

  • REVISE SCOPE & CRITERIA FOR LICENSING EXAMS -

INCREASE SCOPE............................................................

REVISE SCOPE & CRITERIA FOR LICENSING EXAMS - INCREASE PASSING GRADE.**.*************.*.****************.*.*************

REVISE SCOPE & CRIT. FOR LlC. EXAMS - SIMULATOR PLANTS WITH SIMULATORS ****************************.************.***** *~** **

REVISE SCOPE & CRIT. FOR UC. EXAMS - SIMULATOR - OTHER PLANTS............. ~.................................. *.... *****

EVALUATION OF ORGANIZATION & MANAGEMENT **..................*..**.****.*.**************.*.****** * * * * * * * * * * * * * * * * * * * * * * * *

  • SHORT-TERM ACCIDENT & PROCEDURES REVIEW - SB LOCA..........*..**.***.*******.************.***** * * * * * * * * * * * * *.. * * * * * * * * *
  • SHORT-TERM ACCID. & PROCEDURES REV. -

INADEQ. CORE COOL. REANAL. GUIDELINES *****.********..***..**********..********.****

SHORT-TERM ACCID. & PROCEDURES REV. - INADEQ. CORE COOL. REVISE PROCEDURES *****************.**.*.*******.****.****.*****

SHORT-TERM ACCIO. & PROCEDURES REV - TRANSIENTS & ACCDTS. REANAL GUIDELINES (PROC. GEN. PKG.) ********.****.***.***.*****

SHORT-TERM ACCID. & PROCEDURES REV. - TRANSIENTS & ACCDRS. REVISE PROCEDURES (UPGRADED EOP'S) ***.**********.*.**********

SHI FT & RELi EF TURNOVER PROCEDURES ****.*.*.....*................*.***********.**.**** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • SHIFT-SUPERVISOR RESPONSIBILITY ******..*.*................**...**********. **********************************************

CONTROL -ROOM ACCESS *******************.*.*...*.............*..**** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • FEEDBACK OF OPERATING EXPERIENCE ******.******.......*...*....***** * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • VERIFY CORRECT PERFORMANCE OF OPERATING.ACTIVITIES......*.***************************************************.*.********

NSSS VENDOR REV. OF PROC -

LOW POWER TEST PROGRAM..................... * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • NSSS VENDOR REV. OF PROC -

POWER ASCENSION & EMER. PROCS..****.**.****************************************.**.***.****.*

Pl LOT MON OF SELECTED EMERGENCY PROC FOR NTOLS...*.....*..*.****.**** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *.. * * * * * * *

.,C.. CONTROL-ROOM DESIGN REVIEWS (ENTER DATA FOR MPA FOOS & MPA F-071).*.-********************************.**.*..**..*******.

PLANT-SAFETY PARAMETER DISPLAY CONSOLE - DESCRIPTION....*.*.****** * ** ***************************************************...

  • \\*.

MULTI-PLANT ISSUE NUMBER ACTION NO.

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS I.0.2.2 I.0.2.3

  • I.G.1.1
  • I.G.1.2
  • I.G.1.3 Il.B.1.1 Il.B.1.2 Il.B.1.3 Il.B.2.1
  • II.B.2.2
  • II.B.2.3
  • II.B.2.4
  • II.B.3.1
  • II.B.3.2
  • II.B.3.3
  • II.B.3.4 II.B.4.1
  • II.B.4.2.A
  • II.B.4.2.B II.0.1.1
  • II.0.1.2.A
  • II.0.1.2.B II.0.1.3
  • II.D.3.1
  • II.0.3.2 F009.

f 009 f 010

  • FOIO f 011 f 012

. F013 f 013 f 013 f 014

  • II.E.1.1.1 F015 (SEE NOTE 1)
  • II.E.1.1.2 FOIS (SEE NOTE 2)

II.E.1.1.3 F015 (SEE NOTE 3)

  • PLANT-SAFETY PARAMETER DISPLAY CONSOLE.,. INSTALLED...........*.*.....*,...*.*.**...***.*.*.*......*.*...**.**.*.**.**.*.

PLANT-SAFETY PARAMETER DISPLAY CONSOLE -

FULLY IMPLEMENTED.*...*......*.....*.......**.*.*******.*..*..**.**********..*.

TRAINING DURING LOW-POWER TESTING -

PROPOSE TESTS............*....***....****.**..*.**....*.**..*...*......********.*...

TRAINING DURING LOW-POWER TESTING - SUBMIT ANAL. & PROCS........................................................ ~ ***....

TRAINING DURING LOW-POWER TESTING - TRAINING & RESULTS.....*..*.*.*.......**.*.*...**.*.*...*..*..**.*...**.***.****.**.

REACTOR-COOLANT SYSTEM VENTS - DESIGN VENTS......................................... * *..*.**.. *...* * * * *. * * * * * * * * * * * * * * *

  • A REACTOR-COOLANT SYSTEM VENTS - INSTALL VENTS (LL CAT B).................................................................

W

  • REACTOR-COOLANT SYSTEM VENTS - PROCEDURES....*.......*....***.*.*.*..***.......*.**..**...***.....**.*.*..*.*.**.****...

PLANT SHIELDING - REVIEW DESIGNS *.**.*.******...........*...*..*.*..... :.***.**..**....**..**.*.*...*.**...*.**.**.*.*..

PLANT SHIELDING - CORRECTIVE ACTIONS TO ASSURE ACCESS......**..***.*....*..***.*...*..**..**....*..*.**....*..*.....*.*..

PLANT SHIELDING - PLANT MODIFICATIONS (LL CAT B)...........**.*........*............*.*.*.*.*..*.....*... * * *. * * * ** * * * * *

  • PLANT SHIELDING - EQUIPMENT QUALIFICATION-NOT TRACKED AS A TMI ACTION ITEM *.**.*...***..****.......****..*....****..*..

POSTACCIDENT SAMPLING - INTERIM SYSTEM *.*....*..............*.....*...*.*.*...***.....*.*.*.* !.... * * * * * * * * * * * * * * * * * * * * *

  • POSTACCIDENT SAMPLING - CORRECTIVE ACTIONS.*..............*......**....*.***.*.*.***...*. * ***. * * * * * * * * * * * * * * * * * * * * * * * * *
  • POSTACCIDENT SAMPLING - PROCEDURES ***.***................*...****....*...*.*.*.* *.*.**.** * * * * * * * * * * * * * * * * * * * * * * * * * * * *.. *
  • POSTACCIDENT SAMPLING - PLANT MODIFICATIONS (LL CAT B) *..*...*..****......**........***.*..**.**.*..*....*....*... * *. *.
  • TRAINING FOR MITIGATING CORE DAMAGE - DEVELOP TRAINING PROGRAM.**.*..*.***.*......*..***.****.....*.*.*.**.*.**..* ***.**

TRAINING FOR MITIGATING CORE DAMAGE - INITIAL...............*.*.*******..**.*..*.*....***....*... * * * * * * * * * * * * * * * * * * * * * *

  • TRAINING FOR MITIGATING CORE DAMAGE - COMPLETE............*...*.........*....*....*....*..*....*. *.*********************
  • RELIEF & SAFETY VALVE TEST REQUIREMENTS - SUBMIT PROGRAM......*.*.*..**..*.***.*.*.****..*.....**. **********************

RELIEF & SAFETY VALVE TEST REQUIREMENTS - COMPLETE TESTING...*..**..*.*.**..*..**.**.****...*.*. ************************

jt-RELIEF & SAFETY VALVE TEST REQUIREMENTS - PLANT SPECIFIC REPORT **.*........*****.*..*.*****... **************************

RELIEF & SAFETY VAVLE TEST REQUIREMENTS - BLOCK-VALVE TESTING..*..*....*.*.* *.****************************************** e VALVE POSITION INDICATION - INSTALL DIRECT INDICATIONS OF VALVE POS *.*.....****......*..*. ** * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • VALVE POSTION INDICATION - TECH SPECS.*.......*..................*.......*.**.*.**.*....* -*.*..**.*....... ***************

AFS EVALUATION-ANALYSIS *..*.*.*..***...**...................*.....*. ****************************************************

AFS EVALUATION-SHORT TERM MODS *.....*..*........................*.****... ***********************************************

AFS -LONG TERM MODS *.*....**..**.**.................. ********************************************************************

NOTE 1 - THE ITEM LISTED IS FROM NUREG-0737, ENCLOSURE 2 AND IS APPLICABLE TO NTOLS'S ONLY NOTE 2 - THE ITEM LISTED IS FOR ALL PLANTS (OPERATING REACTORS AND NTOL'S)

NOTE 3 - THE ITEM LISTED IS FOR ALL PLANTS (OPERATING REACTORS AND NTOL'S)

MULTI-PLANT ISSUE NUMBER ACTION NO.

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

. 11.E.l.2.1.A 11.E.l.2.l.B 11.E.l.2.2.A

  • II.E.1.2.2.B
  • II.E.1.2.2.C
  • II.E.3.1.1
  • II. E. 3.1. 2 11.E.4.l.1
  • II.E.4.1.2
  • II.E.4.1.3 I I.E. 4. 2. 1-4
  • II.E.4.2.5.A
  • II.E.4.2.5.B Il.E.4.2.6 ll.E.4.2.7
  • II.E.4.2.8
  • ILF.1.1
  • II.F.1.2.A
  • II.F.1.2.B

. *Il.F.1.2.C

  • II.F.1.2.D
  • Il.F.1.2.E
  • II.F.1.2.F
  • Il.F.2.1
  • II.F.2.2
  • II.F.2.3
  • Il.F.2.4.
  • 11.G.l.l
  • II.G.1.2 II. K. l (Oper.

AFS INITIATION & FLOW-CONTROL GRADE *****, ******.*.*..**.***.*********************.*************************.*************

F016 AFS INITIATION & FLOW -

SAFETY GRADE ************.*..**..********************.****************************..*************

AFS INITIATION & FLOW -

FLOW INDICATION CONTROL GRADE *..*****.*******.*****.********************************************

AFS INITIATION & FLOW - LL CAT A TECH SPECS.............................................................................

F017 AFS INITIATION & FLOW - SAFETY GRADE ************.....*.**.**..***.***.*****.***********.*****************..*************

EMERGENCY POWER FOR PRESSURIZER HEATERS -

UPGRADE POWER SUPPLY ***************..***************.******.***..*****.****.**

EMERGENCY POWER FOR PRESSURIZER HEATERS - TECH SPECS *************************.********.**************.****************.*

DEDICATED HYDROGEN PENETRATIONS - DESIGN ******.*..*.........*******.**********.**.**.*******************.******.********

DEDICATED HYDROGEN PENETRATIONS - REVIEW & REVISE H2 CONTROL PROC ****.*********.*.******.***.******.**.****.*****.******

F018 DEDICATED HYDROGEN PENETRATION - lNSTALL. **.***...*....**.....*********.******.******..******************** * *. * ***. * * * *

  • CONTAINMENT ISOLATION DEPENDABILITY - IMP. DIVERSE ISOLATION..*.***..**********.****..*******..**..***.**.* * ******** ****

CONTAINMENT ISOLAT. DEPENDABILITY -

CNTMT PRESS. SETPT. SEECIFIY PRESS ********.*************.***.* ; *******.******.**.***

CONTAINMENT* ISOLATION DEPENDABILITY -

CNTMT PRESSURE SETPT. MODS **.***********.**.**.*....**..**.*..************.***.**.

I F019 CONTAINMENT ISOLATION DEPENDABILITY -

CNTMT PURGE VALVES *.*.**..*****.***..******.**.******..**.**..******.********..**.

F019 CONTAINMENT ISOLATION DEPENDABILITY - RADIATION SIGNAL ON PURGE VALVES ********.***.*******************.******.********.*

CONTAINMENT ISOLATION DEPENDABLITY - TECH SPECS.*.**...*************.************.*****.***..*****.**..***..***..* * * * ;*.

  • F020 ACCIDENT - MONITORING -

PROCEDURES **********..****...**..*.****.********** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • F020 ACCIDENT - MONITORING - NOBLE GAS MONITOR ****....*......*..*.********.********.**.***..*******.****** * * *. * * * * * * * * * * * * * *
  • F021 ACCIDENT - MONITORING - IODINE/PARTICULATE SAMPLING *..**.*.*..******.*************************** * * * * * * * * * * * * * * * * * * * * * * *
  • F022 ACCIDENT - MONITORING - CONTAINMENT HIGH-RANGE MONITOR.*.**...********************************* *************************

F023 ACCIDENT - MONITORING - CONTAINMENT PRESSURE.*....***.****.****************.****** ** **** ********************************

Fo2*4 ACCIDENT - MONITORING - CONTAINMENT WATER LEVEL.....*...*.************.*********** * * ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • F025 ACCIDENT - MONITORING - CONTAINMENT HYDROGEN **.*......**..********** * ****..* * ** ***** ** *************************~********

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING -

PROCEDURES **********.*******************.********.*********** '..

INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE COOLING -

SUBCOOL METER ***********.*******.**********.**.****************

F026 INSTRUMENTATION FOR DETECT *. OF INADEQUATE CORE COOLING - DESC. OTHER.................................. *......... *.. **....

F026 INSTRUMENTATION FOR DETECT. OF INADEQUATE CORE CLING INSTLL ADD'L INSTRUMENTATION *************************.*************

POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - UPGRADE **************************************.*.********

. POWER SUPP. FOR PRESSURIZER RELIEF, BLOCK VALVES & LEVEL IND. - TECH SP ********************** * *. *.********************.-.

Reactors Only)

IE BULLETINS 05, 79-06, 79-08 ******.****.*.**.**.**.*******************************.**************.*..************** :

MULTI-PLANT ISSUE NUMBER ACTION NO.

  • II.K.1.5
  • II. K.1.10
  • I I. K. l. 20
  • I I. K. 1. 21
  • II.K.1.22
  • II.K.1.23
  • II.K.2.2
  • II~ K. 2. 8 II.K.2.9 F027 I I. K. 2.10 F028
  • II.K.2.11 F029 I I. K. 2. 13 F030 I I. K. 2.14 F031 II.K.2.15 I I. K. 2.16 F032 II.K.2.17 F033 II.K.2.19
  • I I. K. 2. 20 F035
  • II.K.3.1.A F036
  • II.K.3.1.B II.K.3.2 F037 II.K.3.3 F038 II. K. 3. 5.A F039 II.K.3.5.B F039 II.K.3.7 II.K.3.9 F040 I I. K. 3.10 F041 II.K.3.11 Il.K.3.12.A ll.K.3.12.B F042 Il.K.3.13.A F043 II.K.3.13.B F043 ISSUE TITLE LICENSEE IMPLEMENTATION STATUS
  • IE BULLETINS - REVIEW ESF VALVES ******* ' ****.*................*..*.*****.*****.***.****....***.*.****.***.*****.*.***....

IE BULLETINS - OPERABILITY STATUS *****...**.*..*...............*************.*.******...**..****..***..*.*************.*

IE BULLETINS -

PROMPT MANUAL REACTOR TRIP **..**...........**..***.*****.***.***..***.**..*******.**..***************..*.

IE BULLETINS - AUTO SG ANTICIPATORY REACTOR TRIP........****.*.*****.**********..**...*.***.****.*.**..**.* -***** -~ ****...

IE BULLETINS - AUX. HEAT REM SYSTEM, PROC ****..*.........*********.*..*.***.***.****..*.*.*****....*******.***.*******..

IE BULLETINS -

RV LEVEL, PROCEDURES **********.*.*..*.......******....*****.*******.*..******..***...**..*..***********.*

ORDERS ON B&W PLANTS -

PROCEDURES TO CONTROL AFW IND OF ICS........ * * * * * * * * *.. *. * * * * * * *. * * * * * * *. * *.. * * *. *. * * * * * * * * * * *. *. e ORDERS ON B&W PLANTS -

UPGRADE AFW SYSTEM *...*.....*....*..*.***.****.***************.*****...****.**.*..******.****....

ORDERS ON B&W PLANTS -

FEMA ON ICS **********.*........*******.*.**.*********..*.*******..**.***.*.**.**.*******.******..

ORDERS ON B&W PLANTS -

SAFETY-GRADE TRIP................................................................................

ORDERS ON B&W PLANTS -

OPERATOR TRAINING **.****.*...*.....**...*.*.*...**.******.**.*..**...*.***..******..****.****.**.

ORDERS ON B&W PLANTS -

THERMAL MECHANICAL REPORT (CE & W PLANTS ALSO) *.*.****.*.****.**.*.***..*.*.*************.***....

ORDERS ON B&W PLANTS - LIFT FREQUENCY OF PORV'S & SV's....................................... * ********..***..**......****

ORDERS ON B&W PLANTS -

EFFECTS OF SLUG FLOW.......................................................................... *..

ORDERS ON B&W PLANTS -

RCP SEAL DAMAGE................................................................... **.. **... ****..

ORDERS ON B&W PLANTS -

VOIDING IN RCS (CE & W PLANTS ALSO)............................................... ***...... **.. **

BENCHMARK ANALYSIS OF SEQUENTIAL AFW FLOW TO ONCE THROUGH STM GENERATOR ***....**.....*.***.**.*****.**.**.****. *********

ORDERS ON B&W PLANTS -

SYSTEM RESPONSE TO SB LOCA............................................ * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE - AUTOMATIC PORV ISOLATION DESIGN.........*.*.*.*.*.*.*.******.*.*.. *************************************

FINAL RECOMMENDATIONS, B&O TASK FORCE -

AUTO PORV ISO TEST /INSTALL. *.*.**.************** * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE -

REPORT ON PORV FAILURES **. '..*.*...*......****.**.*.****.*******.** * * * * * * * * * * * * * * * * * * * * * * * * * * * *.. * * * * * *

  • B&O TASK FORCE - REPORTING SV & RV FAILURES ANO CHALLENGES.**..*****.*********.**.* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • B&O TASK FORCE - AUTO TRIP OF RCP' S PROPOSED MODIFICATIONS *.****.*.**************.* *************************************

A B&O TASK FORCE - AUTO TRIP OF RCP' S MODIFICATIONS.............*****.**..******.**** ************************************* W B&o TASK FORCE - EVALUATION OF PORV OPENING PROBABILITIES..****.**..************.**********..** *************************

B&O TASK FORCE - PIO CONTROLLER MODIFICATION..............***.******************.******.* *******************************

B&o TASK FORCE - PROPOSED ANTICIPATORY TRIP MODIFICATIONS.********************************* *****************************

B&o TASK FORCE - JUSTIFY USE OF CERTAIN PORV........................................ *........ * * * * *.... * * * * * * * *.. * * * * *.. *

. B&O TASK FORCE - ANTICIPATORY TRIP ON TURBINE TRIP PROPOSED MODS................ **.. ************.. **...... ****.. **......

B&O TASK FORCE - ANTICIPATORY TRIP ON TURBINE TRIP INSTALL MOOS................... **********.. *.. **.... ****........ *****

B&O TASK FORCE - HPCI & RCIC SYSTEM INITIATION LEVELS ANALYSIS............... ******.. ***.. ******.. **.. **********...... **

B&O TASK FORCE - HPCI & RCIC INITIATION LEVELS MODIFICATION **.*******..******* ******************************************

MULTI-PLANT ISSUE NUMBER ACTION NO.

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

  • II.K.3.14 II.K.3.15 II. K. 3.16A I I. K. 3. 16. B II.K.3.17 II.K.3.18.A I I. K. 3. 18. B I I. K. 3.18. C
  • II.K.3.19
  • II.K.3.20 II.K.3.21.A II.K.3.21.B II.K.3.22.A II.K.3.22.B Il.K.3.24 II.K.3.25.A II.K.3.25.B II.K.3.27 I I. K. 3. 28
  • II.K.3.29 I I. K. 3. 30. A Il.K.3.30.B Il.K.3.30.C Il.K.3.31
  • I I. K. 3. 40
  • II.K.3.43 I I. K. 3. 44 I I. K. 3. 45 I I. K. 3. 46
  • II. K. 3. 57 III.A.1.1 F044 F045 F046 F046 F047 f 048 f 048 F048 F049.

F050 F050 f 051 F051 F052 F053 F054 F055 F056 F057 F058 F059 F060 F061 F062

'8&0 TASK FORCE -

ISO CONDENSER ISOLATION ON HIGH RAD.......*...****.**.**********.**.*.********.**...**..*.****.******.*

B&O TASK FORCE - MODIFY HPCI & RClC BRK DETECTION CIRCUITRY ***....***.***...**.****...**.*.***.*...***.*...****.********

B&o TASK FORCE - CHALLENGE & FAILURE OF RELIEF VALVES STUDY.................................................... * ***.*.*

B&O TASK FORCE - CHALLENGE & FAILURE OF RELIEF VALVES MODIFICATIONS............................................ * ******.

B&O TASK FORCE -

ECC SYSTEM OUTAGES ***...**..*...*.......*...**..*.*....*****..***...***.*****.*...******...***.******.*

B&o TASK FORCE - ADS ACTUATION STUDY **.*...**......*...........*.*.*..*.***.****.**..*******...*...*****..****..*******.

B&o TASK FORCE - ADS ACTUATION PROPOSED MODIFICATIONS...*..**************.****.*.*..*..*..*..*....****.*...****.********

B&o TASK FORCE - ADS ACTUATION MODIFICATIONS.**......*.....*..******.***...*.*****.**.**********.* * **..** *** *** *********

B&o TASK FORCE - INTERLOCK RECIRCULATORY PUMP MODIFICATIONS.....*..*.*.*.****...*.*******.****.*.*.*****.*...*..**.*.**.

B&o TASK FORCE -

LOSS OF SVC WATER AT BRP...*.*.......*.*..**....*..*......***.***.......*******....**... * * * * *** * * * * * * * *

  • B&o TASK FORCE - RESTART OF CSS & LPCI LOGIC DESIGN.....*..*..*.*.*..***..***....********.*******...****.*..**..******..

B&O TASK FORCE - RESTART OF CSS & LPCI LOGIC DESIGN MODIFICATIONS..**.*.*..**..*....**.**********.*****.***.***.....*.**

B&O TASK FORCE - RCIC SUCTION VERIFICATION PROCEDURES....*.**.****************.****..**..**.. ~ *...*******...*.*.****** **

B&o TASK FORCE - RCIC SUCTION MODIFICATION..**.*.*..*....*...***.*.*********.***.*..*.. ;.*.......* *.**..*...... *********

B&O TASK FORCE - SPACE COOLING FOR HPCI/RCI LOSS OF AC POWER *.****.**..**.*...***.**.**..**.....****.*.**....** * * * * * * ***

  • B&O TASK FORCE -

POWER ON PUMP SEALS PROPOSED MODIFICATIONS ****.*..**..***.*******..****..******** *** ** ******************

B&O TASK FORCE -

POWER ON PUMP SEALS MODIFICATIONS.....*..*.**.*.*.*.*.*************..******** * ** * * * * * * * * * * * * * * * * * * * * * *

  • B&o TASK FORCE -

COMMON REFERENCE LEVEL FOR BWRS...........*.*.**.*******.**.**.*..*.*.********* * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE - QUALIFICATION OF ADS ACCUMULATORS.....*...***...**..*.*******.******.**.* ******************************

B&O TASK FORCE -

PERFORMANCE OF ISOLATION CONDENSERS...****..********..***********. * ****** * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE -

SCHEDULE FOR OUTLINE OF SB LOCA MODEL......******.**.*.*.******.*..***..***.***.*******..*****..***.***

B&o TASK FORCE -

SB LOCA MODEL, JUSTIFICATION.*.*.....*....*..*.*************.**.*. * ***** *******************************

B&O TASK FORCE -

SB LOCA METHODS NEW ANALYSES..*..*...*..*.*.**.************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • B&O TASK FORCE - COMPLIANCE WITH CFR 50. 46 **.......*.......**..***.*.******* * * *.. * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
  • B&o TASK FORCE -

RCP SEAL DAMAGE -

COVERED BY II.K.2.16 AND II.K.3.25 ***********.*****************.**...*.********.*****

B&O TASK FORCE - EFFECTS OF SLUG FLOW -

COVERED BY II. K. 2.15............................... * * * *** * * * * * * * * * * * * * * * * * * * * * *

  • B&o TASK FORCE - EVALUATE TRANSIENT WITH SINGLE FAILURE...**.***********.*********************.*************..**********

B&o TASK FORCE - ANALYSES TO SUPPORT ***.**.***.*...*.....***************.**** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

.RESPONSE TO LIST OF CONCERNS FROM ACRS CONSULTANT *....*....**.****..***************.*************...******.*.*..*****.**

IDENTIFY WATER SOURCES PRIOR TO MANUAL ACTIVATION OF ADS ************************ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

  • EMERGENCY PREPAREDNESS, SHORT TERM.................................... * * * * * * * * * * * * * * * * * * * * * *.. * * * * * * * * * * * * * * * * * * * * * * * * *
  • MULTI-PLANT ISSUE NUMBER ACTION NO.

III.A.1.2.1 III.A.1.2.2 (SEE F063, III.A.1.2.3 (SEE F063, III.A.2.1 III.A.2.2

  • II I.D.1.1.1
  • III.D.1.1.2 III.D.3.3.1 III.D.3.3.2 III.D.3.4.1
  • III.D.3.4.2
  • III.D.3.4.3 MPA-F008 MPA-F063 MPA-F064 MPA-F065 MPA-F071 MPA-8072 MPA-8083 67.4.1 F064, FOGS)

F064, F065) f 067 F068 f 069 f 070 f 070 f 008 f 063 f 064 f 065 F071 B072 8083 GOO!

ISSUE TITLE LICENSEE IMPLEMENTATION STATUS

' UPGRADE EMERGENCY SUPPORT FACILITIES - *INTERIM TSC OSC & EOF.....**.*.************..*....**.*******...*.***.***.***.*.**

UPGRADE EMERGENCY SUPPORT FACILITIES-DESIGN-INCORP. INTO F063/F064/f065...**..*.**.**.*.*.*..****.**....*.**********.*.*

UPGRADE EMER SUPPORT FACILITIES -

MODS INCORPOR. INTO F063, F064 & F065 *.***.*.**.**..**.**..*****...*******************

UPGRADE PREPAREDNESS -

UPGRADE EMERGENCY PLANS TO APP. E. 10 CFR 50 *****....**....**.***.*.***.*...*****..************..

UPGRADE PREPAREDNESS - METEOROLOGICAL DATA.*...***.. ~.**..**.******...****.****.****.***.....****..*.*.**...********.**.

PRIMARY COOLANT OUTSIDE CONTAINMENT -

LEAK REDUCTION.....**.****...**..**..*.**.*****.*..***.****....***.**********...*.

PRIMARY COOLANT OUTSIDE CONTAINMENT -

TECH SPECS......*.......**.******.****..*..**.*****.*...***....*.*.*..*******.****

INPLANT RAD. MONIT. -

PROVIDE MEANS TO DETER. PRESENCE OF RADIOIODINE. *.*.****...***..*..*....** *-* **.*....****.****.**..

INPLANT RADIATION MONIT. - MODIFICATIONS TO ACCURATELY MEAS. IODINE.**.**...*.*..*.****.***...**......*...***. ; *. ***.* **

CONTROL ROOM HABITABILITY -

REVIEW **.**..*...**...*...........*.*.**.*...*.*****..* *...****. *** ** **************.*********

CONTROL ROOM HABITABILITY -

SCHEDULE MODIFICATIONS........**.*.****.*************.*.*...**** !..... ****.. *******.i. * * * * * * *

IMPLEMENT MODIFICATIONS......*******.*****.***.*****...**...**.. ** ** ************************

-If-I.D.1.1 DETAILED CONTROL ROOM DESIGN REVIEW PROGRAM PLAN...***.*.****.**.*******.* ** *.. ** ** ******************************

III.A.1.2 TECHNICAL SUPPORT CENTER ****.****.............*.*.*.**.**********.**..*. * **.* ***********************-*********

III. A.1. 2 OPERATIONAL SUPPORT CENTER..**.*.**.....*..*......***.******...*.*. ** *** ****************************:*********

III.A.1.2 EMERGENCY OPERATIONS FACILITY..*...*.............*.********.****.**.*.**....**.*.*.***..*****....**.* ~ *..*.*...

7'r-I.D.1.2 DETAILED CONTROL ROOM REVIEW (FOLLOWUP TO F-8) *........**.*...*****.****.* * * * * * * * ** * * * * ** ** *** * * * * * *** *> * * * * * * *

  • NUREG-0737 TECH SPECS (GENERIC LETTERS 82-16 & 83-02)...*....*****...*...*******.*.*.*.***.*.**..******.......***.***.*.
  • TECH SPEC COVERED BY GENERIC LETTERS 83-26 & 83-37 FOR NUREG-0737.*.*.**.*****.***.**.*****. * * *. * * * * * * * * * * * * * * * * * * * * * * *
  • REACTOR COOLANT PUMP TRIP (GENERIC LETTER 85-12).........**..*.**.** * * ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ---------~--------

'..