AVERAGE DAILY UNIT POWER LEVEL Completed by Pell White Docket No.
Unit Name Date Telephone Extension Month December 1987 Day Average Daily Power Level Day Average Daily (MWe-NET)
(MWe-NET) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
P. 8.1-7 Rl 50~272 -----
Salem # 1 January 11, 1988 609-935-6000 4451 Power Level
le OPERATING DATA REPORT Docket No.50-272
_,,,__,__~~~--,,.-:=-=-=-
Date:
January 11,1988 Completed by Pell White Telephone: 935-6000 Extension: ~4~4~5~1~-=~~-=-=~
Operating Status
- 1.
Unit Name Salem No. 1 Notes
- 2.
Reporting Period December 1987
- 3.
Licensed Thermal Power (MWt) 3411
- 4.
Nameplate R_ating (Gross MWe)
ITio
- 5.
Design Electrical Rating (Net MWe) 1115
- 6.
Maximum Dependable Capacity(Gross MWe)1149
- 7.
Maximum Dependable Capacity (Net MWe) 1106
- 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
-=-=~-=~-=-=-=-=~~-=o---,----=~-=-=-=~~~-=-=~~-=~~
- 9.
Power Level to Which Restricted, if any (Net MWe)
NA
-=-=~-~~-=,----=~~-=~
- 10. Reasons for Restrictions, if any N/A
-=-=~~~-=-=~~-=-=-=-=-=~-=-=-=-=~~
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor was Critical
- 13. Reactor Reserve Shutdown Hrs.
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Elec. Energy Generated (MWH)
- 18. Net Elec. Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (using MDC Net)
- 22. Unit Capacity Factor (using DER Net)
- 23. Unit Forced Outage Rate This Month 744 0 0---
0 0
0 0
-3093 0
0 0
0 0
Year to Date 8760 6412.5 0
6363.2 0
19612962.8 6496490 6211441 7 2. 6 72.6 64.1 63.6 0.60 Cumulative 92089 57695.1 0
55791. 8 0
172269008.8 57194490 54396209 61.1 60.6 53.4 53.0 24.2
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
1-12-88 8-l-7.R2
Completed by Pell White Duration No.
Date Type Hours 1
UNIT SHUTDOWN AND POWER REDUCTIONS REPORT MONTH DECEMBER 1987 Method of Shutting Reason Down
- 2 Reactor License Event System Report Code 4 Docket No. 50-*272 Unit Name
~S-a~l-e_m_,.N~o-.~1,..-~~
Date January 11,1988 Telephone 609-935-6000 Extension 4451 Component Code 5 Cause and Corrective
.Action to Prevent Recurrence 0280 10-02-87 s 2070 c
1 zz zzzzzz REFUELING OUTAGE
. 0356 12-24-87 1
F: Forced S: Scheduled 2839 B
4 2 Reason A-Equipment Failure-explain B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensing Exam F-Administrative G-Operational Error-explain H-Oth.er-explain WA zzzzzz 3 Method 1-Manual 2-Manual Scram.
3-Automatic Scram.
4-Continuation of Previous Outage 5-Load Reduction 9-0ther SERVICE WATER REPAI~
4 Exhibit G Instructions for Prepara-tion of Data Entry Sheets for Licensee Event Report
{LER) File
{NU REG 0 161 )
5 Exhibit 1 Salem as Source
WO NO 871016100 870127015 870127061 870127151 870220022 PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
- 1 STATION AIR COMPRESSOR FAILURE DESCRIPTION:
STATION AIR COMPRESSOR HAS SEVERAL LEAKS, REPAIR.
1 11SJ15 2 FAILURE DESCRIPTION:
VALVE IS LEAKING PAST THE CLOSED SEAT.
1 1 CC48 FAILURE DESCRIPTION:
REPAIR OR REPLACE SEAT AND WEDGE IN VALVE 1CC48.
1 12RH36 FAILURE DESCRIPTION:
VALVE HAS A PINHOLE LEAK IN THE BODY TO BONNET SEAL WELD.
1 lEP 460V TRANSFORMER FANS FAILURE DESCRIPTION:
lEP 460V TRANSFORMER FANS DID NOT AUTO START.
WO NO 870226027 87 02*260 55 870311007 870327082 870403043 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
1CV75 XA26 FAILURE DESCRIPTION:
REPLACE VALVE BONNET AND REPACK WITH CHESTERTON.
1 12CV292 FAILURE DESCRIPTION:
VALVE SEIZED SHUT, NEEDS TO BE REPLACED.
1 1TA7206/15 CFCU FAILURE DESCRIPTION:
1TA7206/15 CFCU OUTBOARD BEARING TEMPERATURE FAILED, REPAIR.
1 1VHE018 DAMPER AIR REGULATOR FAILURE DESCRIPTION:
lVHEOl.8 DAMPER AIR REGULATOR SUPPLY LINE LEAKING.
REWORK.
1 SPDS FAILURE DESCRIPTION:
SPDS HAS DISAGREEING POINTS BETWEEN SPDS RACK AND CONTROL.
WO NO 870501128 870529086 870601090 870604036 870622027 870623030 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
13SW065/13CFCU FAILURE DESCRIPTION:
13SW065/13 CONTAINMENT FAN COIL UNIT OUTLET WATER FLOW.
REPLACE AIR REGULATOR.
1 FC-3-21T FAILURE DESCRIPTION:
FC-3-21T REPLACE SW EXPANSION JOINT.
1 1CH168 FAILURE DESCRIPTION:
lCH168 CAAC CONTROL VALVE STRUCK AT 50% OPEN POSITION.
INVESTIGATE 1
START UP PUSHBUTTON FAILURE DESCRIPTION:
WHEN THE START UP PUSHBUTTON IS DEPRESSED DURING START UP, WII.L NOT RESET ROD COUNTERS.
1 12MS9 FAILURE DESCRIPTION:
12MS9 BODY TO BONNET LEAK (D-25), REPAIR VALVE.
1 14GB2 FAILURE DESCRIPTION:
PACKING GLAND WAS DRILLED AND FURMANITED.
REPLACE VALVE.
WO NO 870727061 870801092 870805022 870805084 870806121 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
SPOOL 1SW-P-1077A 1
FAILURE DESCRIPTION:
14" S. W. PIPING HAS A PIN HOIJE LEAK IN SPOOL l-SW-P-1077A.
12 REACTOR COOLANT PUMP FAILURE DESCRIPTION:
INSPECT AND REPLACE 12 RCP SEAL.
1 12 CV291 FAILURE DESCRIPTION:
VALVE SEIZED SHUT, REPLACE MARK NO. FA-127 1
11 SJ94 FAILURE DESCRIPTION:
11SJ94 COVERED WITH BORON CRYSTALIZATION.
1 11RH19 FAILURE DESCRIPTION:
BODY TO BONNET LEAK.
REMOVE VALVE OPERATOR, REPLACE VALVE GASKET.
WO NO 870811120 870831088 870831091 870928195 870930102 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
1SJ24 5 1
FAILURE DESCRIPTION:
1SJ245 IS FROZEN, AND STEM IS BROKEN, REPLACE WITH A NEW VALVE.
SPOOL l-SW-493 FAILURE DESCRIPTION:
4" SPOOL 1-SW-493 HAS A HOLE IN A WELD.
1 lA 125DC BATTERY FAILURE DESCRIPTION:
lA 125 VOLT DC BATTERY.
REPLACE COMPLETE BATTERY 1
11 FAN COIL UNIT 1
FAILURE DESCRIPTION:
INLET PIPING LEAK.
REMOVE LEAKING SPOOL PIECE.
11 SW2 FAILURE DESCRIPTION:
llSW2 IS HANGING PARTIALLY-OPEN.
INSTALL REBUILT VALVE FROM WO # 870318046.
SALEM UNIT 1 WO NO UNIT EQUIPMENT IDENTIFICATION
~~~~~~~---'-"~*~~~~~~~~~~~~~~~~~~~
871011053 871011062 871016060 871016076 871017057*
1 PIPE SPOOL l-SW-637B FAILURE DESCRIPTION:
X-RAY SHOWED PITTING AND CORROSION AROUND WELD l-SW-637B-298.
1 SPOOL l-SW-3146 FAILURE DESCRIPTION:
DURING THE 10 YEAR HYDRO, LEAKING WELDS ON SPOOL 1SW3146 WERE FOUND.
1 lSS 27 FAILURE DESCRIPTION:
1SS27 ACCUMULATOR SAMPLE VALVE FAILED LEAK RATE TEST.
1 12 BAT PUMP FAILURE DESCRIPTION:
12 BORIC ACID TRANSFER PUMP HAS A MECHANICAL SEAL LEAK.
REPLACE SEAL.
1 13CV29 5 FAILURE DESCRIPTION:
13CV295 HAS FAILED THE LEAK RATE TEST FA-17 VALVE, REWORK.
WO NO 871105086 871106044 871123195 871130206 871209057 871209080 S P.~LEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
P250 FAILURE DESCRIPTION:
P250 IS FAILED, INVESTIGATE AND REPAIR.
1 12SW39 FAILURE DESCRIPTION:
12SW39 TEETH ON VANE ARM BROKEN, STUCK IN OPEN POSITION, FIX.
1 lA DIESEL JACKET WATER COOLER l
FAILURE D~SCRIPTION:
HEAD ON lA DIESEL JACKET WATER COOLER IS.LEAKING.
REPLACE.
1 lA DIESEL FAILURE DESCRIPTION:
lA DIESEL, REPAIR VARIOUS FUEL OIL, LUBE OIL AND JA.CKET WATER LEAKS.
1 12 RCP OIL COOLER FAILURE DESCRIPTION:
12 RCP OIL COOLER LOWER FLANGE HAS INSUFFICIENT THREAD.
1 15 CFCU FAILURE DESCRIPTION:
15 CFCU WILL NOT START IN HIGH SPEED AND ALSO IN LOW.
TROUBLESHOOT.
WO NO 871006179 871006180 871006181 871010044 871010045 871011049 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
- 15 FCU MOTOR COOLER PIPE FAILURE DESCRIPTION:
SPOOL l-SW-3062A HAS A THRU WALL LEAK.
1
- 12 FCU MOTOR COOLER PIPE FAILURE DESCRIPTION:
DURING THE 10 YEAR HYDRO, A LEAK WAS FOUND IN SPOOL l-SW-3001A.
1 1CV55 FAILURE DESCRIPTION:
1CV55 CHARGING CONTROL VALVE STUCK OPEN, CAN NOT CONTROL.
1 1NT34 FAILURE DESCRIPTION:
1NT34 FAILED LEAK RATE TEST.
DIASSEMBLE VALVE AND INSPECT, REPAIR MARK NO. D-22.
1 1NT26 FAILURE DESCRIPTION:
1NT26 FAILED LEAK RATE TEST.
DIASSEMBLE VALVE AND INSPECT, REPAIR MARK NO. D-21.
1 1SW553A PIPING F~JLURE DESCRIPTION:
X-RAY SHOWED THAT WELD l-SW-553A-69 HAS LACK OF FUSION.
WO NO 871019088 871019089 871019093 871023063 871026086 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
12CA36 0 FAILURE DESCRIPTION:
12CA360 FAILED LEAK RATE TEST, DISASSEMBLE, INSPECT AND REWORK AS NECESSARY, D-72.
1 12CA33 0 FAILURE DESCRIPTION:
12CA330 FAILED LEAK RATE TEST, DISASSEMBLE, INSPECT AND REWORK AS NECESSARY, A-171.
1 1PR17 FAILURE DESCRIPTION:
1PR17 VALVE FAILED LEAK RATE TEST.
DISASSEMBLYv CLEAN AND REPAIR MARK NO. XA-21.
1 14SW223-AO FAILURE DESCRIPTION:
14SW223-AO REPAIR BROKEN AIR SUPPLY TUBING.
TlIBING IS PULLED OUT AND BROKEN OFF.
1 13SW243 FAILURE DESCRIPTION:
THE SIXTH ELBOW DOWNSTREAM OF 13SW243 IS LEAKING.
REPAIR.
WO NO 871027061 871027158 871030040 871101128 SALEM UNIT 1 UNIT EQUIP:MENT IDENTIFICATION 1
12RH19 FAILURE DESCRIPTION:
12RH19 BODY TO BONNET LEAK.
REMOVE VALVE OPERATOR, REPLACE VALVE GASKET.
1 12 RHR HEAT EXCHANGER FAILURE DESCRIPTION:
12 RHR HEAT EXCHANGER HEAD GASKET LEAKS, REPLACE GASKET.
1 11 RHR HEAT EXCHANGER FAILURE DESCRIPTION:
11 RHR HEAT EXCHANGER HEAD GASKET LEAKS, REPLACE GASKET.
1 1SW139 FAILURE DESCRIPTION:
REPLACE THE PIPING UPSTREAM OF lSWl 39 (VAINE) THAT IS CRACKED.
WONO 871212059 871219143 871219145 871219161 871219178 SALEM UNIT 1 UNIT EQUIPMENT IDENTIFICATION 1
12CS 48 FAILURE DESCRIPTION~
12CS48 FAILED LEAK RATE TEST.
TROUBLESHOOT.
1 13SJ54 FAILURE DESCRIPTION:
DURING MANUAL S.I. TESTING, 13SJ54 IS REQUIRED TO OPEN, DID NOT, TROUBLESHOOT.
1 lC D/G FAILURE DESCRIPTION:
lC D/G FIELD FLASH FAILED, TROUBLESHOOT FIELD FLASH CIRCUIT.
1 1 CV55 FAII,URE DESCRIPTION:
lCV55 CHARGING PUMP FLOW CONTROL VALVE, TROUBLESHOOT VALVE PROBLEM.
1 HEAT TRACE CIRCUIT 418 FAILURE DESCRIPTION:
HEAT TRACE # 418 IS DAMAGED (SHORTED TO THE PIPING).
REWORK.
WO NO 871228113 871228125 SALEM UNIT l UNIT EQUIPMENT IDENTIFICATION 1
1CV77 FAILURE DESCRIPTION:
1CV77 EXCEEDS ITS PREVIOUS STROKE TIME BY 25%,
TROUBLESHOOT.
1 1CV79 FAILURE DESCRIPTION:
1CV79 EXCEEDS ITS PREVIOUS STROKE TIME BY 25%,
TROUBLESHOOT.
MAJOR PLANT MODIFICATIONS REPORT MONTH DECEMBER 1987
- DCR NO.
PRINCIPAL SYSTEM DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
SUBJECT 50-311 Salem 2 January 11,1988 J. Ronafalvy 609/339-4455~~~-
Information not available for this report due to changes in system.
This information will be included in next report.
Design Change Request
SALEJ\\1 GENERATING STATION MONTHLY OPERATING
SUMMARY
UNIT NO. 1 DECEMBER 1987 The Unit entered the period shutdown as the Seventh Refueling Outage continued.
During the period, the Reactor Flux Thimble wear inserts were machined using the electro-discharge method (EDM) to eliminate interference problems with the fuel assemblies.
A total of twenty five Type I and 1 Type II wear inserts were machined.
Following completion of the EDM machining job, the core was reloaded and the Reactor reassembled.
The Steam Generator ten year hydro's were completed and the plant entered Mode 5 on December 12, 1987.
Charging System Full Flow and Manual Safety Injection Tests were also completed.
Two Service Water System related problems occurred during the period.
On December 23, 1987, the No. 1 Service Water Bay flooded completely due to the failure of an isolation valve during maintenance.
The Service Water Bay 1 flood recovery activities continued throughout the remainder of the period.
On December 29, 1987, a severe Service Water flange leak developed in the Auxiliary Building while returning No. 11 Service Water Header to service.
The flange leak was repaired and the header returned to service later that evening.
REFUELING INFORMATION DOCKET NO.:
50-27 2 CO.MPLETED BY:
J. Ronafalvy UNIT NAME:
Sale_m_l _____.
DATE:
TELEPHONE:
EXTENSION:
January 11,1988 609/935-6000 4497 Month DECEMBER 1987
- 1.
Refueling information has changed from last month:
YES X
NO
- 2.
Scheduled date for next refueling:
March 4, 1989
- 3.
Scheduled date for restart following refueling: April 18, 1989
- 4.
A)
Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO DATE X
B)
Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES NO X
If no, when is it scheduled?
January 1989
- 5.
Scheduled date(s) for submitting proposed licensing action:
January if required
- 6.
Important licensing considerations associated with refueling:
NONE
- 7.
Number of Fuel Assemblies:
A}
Inc ore B)
In Spent Fuel Storage
- 8.
Present licensed spent fuel storage capacity:
Future spent fuel storage capacity:
- 9.
Date of last refueling that can be discharged to spent fuel pool assuming the present 193 464 11 70 1170 licensed capacity:
~September 2001 8-l-7.R4
OPS~G Pub I ic Service Electric and Gas Company P.0. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 January 11, 1988 In compliance with Section 6.9.1.6, Reporting Requirements for the Salem Technical Specifications, the original copy of the monthly operating reports for the month of December 1987 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Safety Related Maintenance Major Plant Modification Operating Summary Refueling Information Sincerely yours, J.tt:::f.
General Manager -
Salem Operations RH:sl cc:
Mr. William T. Russell Regional Administrator USNRC Region I 631 Park Avenue King of Prussia, PA 19406 Enclosures 8-l-7.R4 The Energy People 95-2189 (11 M) 12-84