Proposed Changes to Tech Specs Section 6.6.3,providing Surveillance Requirements for Containment pressure-vacuum Relief Isolation Valve Opening Angle Limit
ML18092A438
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/07/1984
From:
Public Service Enterprise Group
To:
Shared Package
ML18092A437 List:
References
LCR-84-25, NUDOCS 8412190124
Download: ML18092A438 (2)


Text

.. '

CONTAINMENT SYSTEMS SURVEILLANCE RE WIREMENTS (Continued) 4.6.3.1.2 Each isolatio~ valve specified in Table 3.6-1 shall be demonstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once.per 18_months by:

a.

Verifying that on a Phase A containment isolation test signal, each Phase A isolation.valve actuates to its i so 1 at i o n po s i t i o n *

b.

Verifying that on a Phase B containment isolation test

  • signal, each Phase B -isolation valve actuates to its i so 1 at i o n po s i ti o n *
c.

.Verifying that on a feedwater isolation test signal, each*

feedwater isolation valve actuates to its isolation position.

d.

Verifying that on a Contai nrent Purge and Pressure-Vacuum Relief isolation test signal, each Purge and Pressure-Vacuum Relief valve actuates to its isolation position.

e.

Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to ~ 60° opening angle.

4.6.3.1.3 At least once per 18 months, veri.fy that on a main steam isolation test signal, each main steam isolation valve specified in Table 3.6-1 actuates to its isolation position.

4.6.3.1.4 The isolation tine of each power operated or automatic valve of Table 3.6-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.

4.6.3.1.!:> Each containment purge isolation valve shall be demonstrated OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after each closing of the.valve, except when the valve is being used for multiple cyclings, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that when the neas1:1red leakage rate is added to the leakage rates determined pursuant to Specification 4.6.l.2d. for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60La.

4.6.3.1.6 A pressure drop test to identify excessive. degradation of resilient valve seals shall be conducted on the:

a.

Containment Purge Supply and Exhaust Isolation Valves at least once per 6 months.

b.

Containment Pressure - Vacuum Relief Isolation Valves at

  • 1east once per 3 months.

r

.. --~ 8412190124 e4fifo7* - ----..,

I PDR ADOCK 05000272

1.

P PDR SALEM - UNIT 1 3/4 6-13

CONTAINMENT SYSTEMS SURVEILLANCE REQJIREMENTS (Continued) 4.6.3.2 Each isolation valve specified in Table 3.6-1 shall be dennnstrated OPERABLE during the COLD SHUTDOWN or REFUELING MODE at least once per 18 roonths by:

a.

Verifying that on a Phase A containment isolation test signal, each Phase A isolation valve actuates to.its i so 1 at io n po s it i o n *

b.

Verifying that on a Phase B containment isolatfon test signal, each Phase B isolation valve actuates to its i so 1 at io n po s i t io n *

c.

Verifying that on a feedwater isolation test signal, each feedwater isolation valve actuates to Hs isolation position.

d.

Verifying that on a Containment Purge and Pressure-Vacuum Relief isolation test signal, each Purge and Pressure-Vacuum Relief valve actuates to its isolation position.

e.

Verifying that the Containment Pressure-Vacuum Relief Isolation valves are limited to~ 60° opening angle.

4.6.3.3 At least once per 18 roonths, verify that on a main steam isolation test signal, each main steam isolation valve specified in Table 3.6-1 actuates to its isolation position.

4.6.3.4 The isolation time of each power operated or automati'c valve of Table 3.6-1 shall be determined to be within its limit when tested pursuant to Specification 4.0.5.

4.6.3.5 Each containment purge isolation valve shall be deroonstrated OPERABLE within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after each closing of the valve, except when the valve is being used for multiple cyclings, then at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, by verifying that when the measured leakage rate is added to the leakage rates determined pursuant to Specification 4.6.l.2d. for all other Type Band C penetrations, the combined leakage rate is less than or equal to 0.60La.

4.6.3.6 A pressure drop test to identify excessive degradation of resilient valve seals shall be conducted on the:

a.

Containment Purge Supply and Exhaust Isolation Valves at least once per 6 roonths.

b.

Containment Pressure - Vacuum Relief Isolation Valves at least once per 3 months.

SALEM -

UN IT 2 3/4 6-15