Provides Status of NUREG-0737,Items II.D.1,II.F.2,II.K.2.13, II.K.3.3,II.K.3.30,II.K.3.31 & III.D.3.4,in Response to NRC 840302 Ltr.Util Interprets NRC Goals as Meaning Items Listed in Recent Edition of NUREG-0748
ML18092A154
Person / Time
Site: Salem  PSEG icon.png
Issue date: 04/18/1984
From: Liden E
Public Service Enterprise Group
To: Varga S
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-0748, RTR-NUREG-737, RTR-NUREG-748, TASK-2.D.1, TASK-2.F.2, TASK-2.K.2.13, TASK-2.K.3.03, TASK-2.K.3.30, TASK-2.K.3.31, TASK-3.D.3.4, TASK-TM NUDOCS 8404240346
Download: ML18092A154 (3)


Text

- - *

, _.l-.,_*i e

OPS~G Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Nuclear Department April 18, 1984 U. s. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Division of Licensing Washington, D. C. 20555 Attention: Mr. Steven A. Varga, Chief Operating Reactors Branch, No. 1

Dear Mr. Varga:

COMPLETION OF NUREG-0737 ITEMS SALEM GENERATING STATION UNITS NO. 1 AND 2 DOCKET NOS. 50-272 AND 50-311 In your letter dated March 2, 1984, you presented the NRC staff's goal for completing technical reviews and implementing Technical Specifications for all NUREG-0737 items, excluding Supplement 1, by September, 1984.

PSE&G interprets this as meaning those items listed in the most recent edition of NUREG 0748 "Operating Reactors Licensing Actions Summary."

For the items currently listed as active in NUREG-0748, Volume 4, No. 1, the status is as follows:

Item II.D.l, RV and SV Testing: PSE&G transmitted its plant specific report on the safety and relief valve test program in a letter dated January 3, 1983. Discharge piping support modifications are scheduled to be completed during the current Unit #1 outage and during the next refueling outage for Unit

  1. 2, except for insulating the loop seal. The vendor cannot supply the insulation until September 1, 1984, at the earliest: however, it can be installed on Unit #1 at some reasonable time during cold shutdown.

8404240346 840418 PDR ADOCK 05000272 P PDR The Energy People 95-2168 (75M) 12-83

,Mr. Steven A. Varga 4/18/84 All technical documentation will be available for NRC review by September 1, 1984.

Item II.F.2.3, Inadequate Core Cooling Instrumentation: The status of the Reactor Vessel Level Indication System (RVLIS) was provided in our letter dated April 4, 1984. The detailed description of integrated display system will be provided after resolution of the core exit thermocouple (CET) design.

Additionally, the RVLIS Emergency Operations Procedures (EOPs) cannot be validated until March, 1985.

Except as noted for the CETs and EOPs, all technical documen-tation will be available for NRC review by September 1, 1984.

Item II.K.2.13, Thermal Mechanical Report: PSE&G stated in its letter dated December 22, 1981, that the Westinghouse ge-neric report is applicable to Salem and that plant-specific analyses would be submitted if necessary.

Since the NRC has not requested additional information, PSE&G considers that documentation for this item is complete.

Item II.K.3.3, Report on RV/SV Failures (Unit #1): PSE&G provided its report to the NRC in a letter dated October 21, 1982.

PSE&G considers that documentation for this item is complete.

Item II.K.3.30, SB LOCA Outline: This item is complete and all technical documentation will be available for NRC review by September 1, 1984.

Item II.K.3.31, Compliance with 10 CFR 50.46 (Accept~nce Criteria for ECCS): This item is complete and all technical documentation will be available for NRC review by September 1, 1984.

Item III.D.3.4, Control Room Habitability (Unit #1): This item is complete and all technical documentation will be available for NRC review by September 1, 1984.

.Mr. Steven A. Varga 4/18/84 In accordance with Generic Letter 83-37, NUREG 0737 Technical Specifications, we have established with our Project Manager that Technical Specification changes for NUREG 0737 items will be submitted by September 1, 1984.

Should you have any questions, please do not hesitate to contact us.

Sincerely, Manager - Nuclear Licensing and Regulation C Donald C. Fischer Licensing Project Manager Mr. James Linville Senior Resident Inspector