ML18086A801
| ML18086A801 | |
| Person / Time | |
|---|---|
| Site: | 02700010, Salem |
| Issue date: | 07/02/1981 |
| From: | Joyner J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Schneider F Public Service Enterprise Group |
| Shared Package | |
| ML18086A802 | List: |
| References | |
| NUDOCS 8107230089 | |
| Download: ML18086A801 (2) | |
See also: IR 015000027/1981006
Text
UNITED ST ATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIA, PENNSYLVANIA 19406
i
JUL 1981
Public Service Electric and Gas Company
n.n'\\/'J
ATTN:
Mr. F. W. Schneider
c: C\\l£. CY~
Vice President - Production
\\t:. f
80 Park Plaza - 15A
Newark, New Jersey 07101
Gentlemen:
Subject:
Inspection 50-272/81-11 (159Q9927/81-06)
This refers to an announced
V office on March 31, 1981.
facility was inspected upon
site at Beatty, Nevada.
inspection conducted by W. M. Grayson of our Region
A shipment of radioactive waste shipped from your
arrival at the U. S. Ecology, Incorporated burial
Areas examined during the inspection and our findings are discussed in the en-
closed inspection report.
Within these areas, the inspection consisted of a review
of the shipping papers, placarding and labeling requirements, radiation measure-
ments, selective contamination surveys, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice (45
FR 66754) dated October 7, 1980.
You are required to respond to this letter and
in preparing your response, you should follow the instructions in Appendix A.
In accordance with 10 CFR 2.790 of the Commission 1 s regulations, a copy of this
letter and the enclosures will be placed in the NRC 1 s Public Document Room.
If
this report contains any information that you (or your contractors) believe to
be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a)
notify this office by telephone within ten (10) days from the date of this letter
of your intention to file a request for withholding; and (b) submit within 25 days
from the date of this letter a written application to this office to withhold such
information.
Consistent with section 2.790(b)(l), any such application must be
- accompanied by an affidavit executed by the owner of the information which identi-
fies the document or part sought to be withheld, and which contains a full state-
ment of the reasons on the basis which it is claimed that the information should
be withheld from public disclosure.
This section further requires the statement
to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The
information sought to be withheld shall be incorporated as far as possible into
a separate part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, the report will be placed in the Public Docu-
ment Room.
The telephone notification of your intent to request withholding, or
any request for an extension of the 10 day,,period which you believe necessary,
should be made to the Supervisor, Files, M~il and Records, USNRC Region I, at (215)
337-5223.
I
1:.o'-
~ /,
--
8107230089 810702
PDR ADOCK 02700010
C
i
Public Service Electric and Gas
Company
2
JUL 2
1981
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
~J::~i::
Technical Inspection Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-272/81-11 (15000027/81-06)
cc w/encls:
J. T. Boettger, General Manager, Corporate Quality Assurance
R. L. Mittl, General Manager - Licensing and Environment
H. J. Midura, Manager - Salem Generating Station
R. A. Uderitz, General Manager - Nuclear Production