UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
..
KING OF PRUSSIA, PENNSYLVANIA 19406
, . ' ~- **MAR f 981
Docket Nos. 50-21..2 --
50-3fL
Public Ser'ri~e Electric and Gas Company
ATTN:
Mr. F. W. Schneider
Vice President - Production
80 Park Plaza - 15A
Newark, New Jersey 07101
Gentlemen:
Subject:
Combined Insection Nos. 50-272/80-30 and
50-311/80-21
This refers to the routine inspection conducted by Mr. R. J. Bailey of this
office on November 17-21, 1980, at the Salem Nucle~r Generating Station Units 1
and 2,*Hancocks Bridge, New Jersey of activities authorized by NRC License Nos.
DPR-70 and DPR-75 and to the discussions of our findings held by Mr. R. J.
Bailey with members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
cF
and Enforcement Report which is enclosed with this letter. Within these areas, *
the inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations*by the inspector.
Our inspector also verified the steps you have taken to correct the items of
noncompliance brought to your attention in a letter dated August 22, 1980.* We
note that items 2 and 3, have n*ot been fully corrected. .
Item 2 in the Notice of Violation enclosed with this letter is a repeat item and
was identified during a previous inspection of your licensed activities on July
14-18, 1980.
Your letter to this office dated September 15, 1980 stated, that
the corrective action was, "the Security Force has been instructed to look for
similar situations during their fence line patrols.
11
Since the item was repeated
it appears that your described action was not implemented or was ineffective.
Based on the results of this inspection, it appears that c~rtain of your activities
were not conducted in full compliance with NRC requirements as set forth in the
.
Notice of Violation, enclosed herewith as Appendix A~ These items of noncompliance
have been categorized into the levels described in the Federal Register Notice
{45 FR 66754) dated October 7, 1980.
In addition to the need for corrective
action regarding these specific items of noncompliance, we are concerned about _
the implementation of your management control systems that permitted them to
occur.
Consequently, in your reply, you should describe in particular, those
actions takeQ or planned to improve the effectiveness of your management control~
systems.
- *.
Public *Service Electric and Gas Company
2
- 3 MAR 198\\
Recurrent gnd uncorrected items of noncompliance are given additional weight iR
the consid~r~tion and selection of appropriate enforcement action.
Therefore,
in your re~ppnse to this letter, you should give particular attention to those
actions taKen or planned to ensure that identified items of noncompliance will*
be completel~ corrected and will not recur.
-
In accordance with Section.2.790(d) of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, documentation of findings of your control
and accounting procedures for safeguarding special nuclear materials and your
facility security measures for physical *protection are deemed.to be commercial
or financial infonnation within the meaning of 10 CFR 9.5(a}(4) and shall be
subject to disclosure only in accordance with the provisions of 10 CFR 9.12;
therefore, the enclosures to this-letter, and your response to this letter will
- not be placed in the Public Document Room and will receive limited distribution.
Should you have any questions concerntng this inspecti'on, we wi.11 be pleased to
discuss them with you.
Sincerely,
4~i:w
Director
Enclosures:
.
1. Appendix A, Notice of Violation (Contatns 2. 790(d} Information)
2.
Combined Office.of Inspection and *Enforcement
Inspection Report Nos. 50-272/80-30 and 50-311/80-21
(Contains 2.790(d} Information)
. * . _ * :-
cc (w cy of report cover sheet only):
J. T. Boettger~ General Man.ager, Corporate Quality Assurance
R. L. Mittl, General Manager - Licensing and Environment
H. J. Midura, Manager - Salem Generating Station
R. A. Uderitz, General Manager*- Nuclear Production