ML18086A614

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-272/80-30 & 50-311/80-21.Corrective Actions Withheld (Ref 10CFR2.790)
ML18086A614
Person / Time
Site: Salem  
Issue date: 04/03/1981
From: Schneider F
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18086A611 List:
References
NUDOCS 8106040067
Download: ML18086A614 (1)


Text

    • .

rederick W. Schneider Vice President Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/430- 7373 Production April 3, 1981 Mr. Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

COMBINED INSPECTION NOS. 50-272/80-30 AND 50-311/80-21 INSPECTION DATE NOVEMBER 17-21, 1980 SALEM UNITS 1 AND 2 DOCKET NOS. 50-272 AND 50-311 We have reviewed the report of the security inspection conducted November 17-21, 1980, which was transmitted with your letter dated March 3, 1981 and received on March 5, 1981.

Our response to the items of non-compliance in Appendix A of the Inspection Report are contained in Appendix A to this letter.

The information contained in Appendix A to this letter identifies security measures for the physical protection of Salem Generating Station, and should be withheld from public disclosure. in accord-ance with the provisions of the Nuclear Regulatory Commission's Rules and Regulations, 10CFR2.790 {d).

Sincerely, Attachment CC NRC Off ice of Inspection and Enforcement (w/o Appendix A)

Division.of Reactor Operations Inspection Wash~ngton, DC 20555

  • 8106 0.4o Ob t