ML18085A534

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1980
ML18085A534
Person / Time
Site: Salem 
Issue date: 01/12/1981
From: Midura H
Public Service Enterprise Group
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML18085A535 List:
References
NUDOCS 8101210455
Download: ML18085A534 (9)


Text

c~

Q;i

~:;

~.!'!:-""**

l~l c0:;,'~

L\\J,-~*-*-

~;,j l-j0)

LJ..J cc::

PS~G Public Service Electric and Gas Company P. 0. Box #168 Hancocks Bridge, New Jersey 08038 January 12, 1981 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In compliance with section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of December 1980 are being sent to you.

C'~!

(/)'

L0 Lt.J u

Q'I cc.

~-

cu b~~~~

l)~* SC:<

C*J

~:

-.)

c..

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Summary of Safety Related Maintenance Refueling Information Sincerely yours, H. J. Midura "II.-:-'*

c,Ji:

U"\\*

Manager -

Salem Generating Station LKM:vd cc:

Mr. Boyce H. Grier Director of U.S. NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 Enclosures Page 1 of 9 8-l-7.R4 The Energy Peopl~r"'*

8101210 '-\\J) 95-2189 (5M) 10-79

I I

~

~NIH December 19.80 AVERAGE DAILY UNIT POWER. LEVEL DJCKET NO.

50-311

~~~~~~~~

UNIT Salem No. 2 DATE January 12, 1981 COMPLETED BY L. K. Miller TELEPHONE 609-365-7000 Ext. 507 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5

6 7

8 9

10 11 12 13 14

15.

16 Pg.

2 of 9 8.1-7.Rl (MWe-NET) 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

(MWE-NET) 17 0

18 0

19 0

20 0

21 0

22 0

23 0

24 0

25 0

26 0

27 0

28 0

29 0

30 0

31 0

e OPERATING ~

RE!?ORl' OPERAT:JN; STATOS

l. Unit Nane:

Salem No. 2 Notes:

2.

Reporting Period:

December 1980

3.

Licensed 'llla:nal Power (!+lt):

3411

4.

Nalrepl.ate Rating (Gmss !-Ha):

1162

5.

Design Electrical Rating (Net Kole) :

1115

6.

Maximllm Dependable capacity "(Gross ma): 1149.

.....;;;~..;...... __ _

7.

Maximllm Dependable Capacity (Net Kole) :

1104 e

occKEr ro.:

50-311 DATE :

January 12, 1981 o:M'LETID BY:

L.K. Miller

~: 609-365-7000 Ext. 507

a. If Changes Occur in Capacity Ratings (Ite!!B NUIJCer 3 'lllmugh 7) Sina! Last Report, Give Reason:
9.

Power IeveJ. To Which Restricted, u Arr:! (Net M-1el : ____

s_%_T-.he

... * =-rm a...

1 ______________ _

10.

Beasons For Restrictions, If Aey:

pending Full Power Operating Liscense

'Ibis M:lnth Year to Date Cunul.ative

11.

Hours In Re[:mting Period 744 6169 6169

12.

Nuni:ler Of Hours :Reactor Was Critical 0

268.2 268.2

13.

Reactor Reserve Shuta::Jwn Hours 0

14.

Hours Generator On-Line.

0 0

0

15. Unit Reserve Shutdown Hours 0

0 0

16.

Gmss 'lbmral Energy Generated (Mia) 0 0

0

17.

Gross Electrical Energy Generated (mH) 0 0

0

18.

Net Electrical Energy Generated (MWH) 0 0

0

19. Unit Service Factor 0

0 0

20.

Unit Avai Jabi lity Factor 0

0 0

21. Unit Capacity Factor (Using MOC Net)
  • o 0

0

22. Unit Capacity Factor (Using DER Net) 0 0
23. Unit Forced Outage Rate 0

()

0

24.

Shutda.ms Scheduled OVer Next 6 Months (Type, Date, and Duration of Each):

.25. If Shut Down At End of Report Period! Estimated Date of Startup: ---------------....---

.26.

Units In Test Status (Prior to camercial Cperation):

S-l-7.R2 Pg. 3 of 9 INITIAL CRITICALITY' INITIAL ~CITY"

~OPERATION Forecast 6/30/80 9/0l/80 N/A Achieved 8/2/80 N/A N/A l

00.

1 DATE F: Forced s: Scheduled Page 4 @f 9 8-1-7.Rl TYPif 2

UNIT sm~s l\\ND PCl'lER RE!Xx:rIONS REPORT mm11 December 19 8 0 ME:TIDD OF OOAATIOO

~

SHt11TI~

(llXJRS) r.nlN RF.ACIDR Reason:

A-Equip!Ellt Faiiure(Explain)

B-Maintenanoe or Test C-Refueling

(>-Regulatory Restriction LICENSE E.VENI' REPORT I E--Cperator Training & License EKamination F-.Administrative G-q>erational Error(Explain)

H-other (Explain)

SYSTEM CXH'rnFNl' cmE" aJDES 3

~thod:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Continuation of Previous Outage 5-Load Reduction 9-0ther 4

DOCKET NO.: 50-311

~~~~~~~~~-

UNIT 1NAME:

Salem #2 DATE:

January 12, 1981 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000 Ext. 507 CAUSE 1\\ND aJRROCTIVE ACTIOO 'ID PRE.VEN!' REOJRRENCE N/A Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (UR) File (NURID-0161) 5 Exhibit 1-sane Source

WORK ORDER NUMBER 911997 912334 929516 934081 934082 934155 937123 939261 944715 945350 DEPT M"i)

MD MD MD MD MD MD MD MD MD Page 5 of 9 SALEM GENE~NG STATION SAFETY RELATED EQUIPMENT WORK ORDER LOG UNIT 2 EQUIPMENT IDENTIFICATION EXPLANATION OF WORK PERFORMED Vent Duct Description Of Problem

- Seal hole around vent duct from Unit 2 A/C Room to Flux Mapping Valve, 23MS167.

Valve, 22RH19 Valve, 21SJ40 2F 4KV Bus 22 Fan Coil Unit 2 Reactor Sump Pump 2A Emergency Diesel 25 Service Water Screen Unit 2 Control Room.

Corrective Action Taken - Filled hole with cera blanket, then filled remaining hole with simkit.

Description Of Problem

- Reinstall flux thimbles into reactor.

Corrective Action Taken - Reinstalled flux thimbles.

Description Of Problem

- Valve will not indicate open.

Corrective Action Taken -

Repacked valve.

Description Of Problem

- Closing coil does not close.

Corrective Action Taken -

Replaced 3 relays.

Description Of Problem 230V ACB trips during valve operation.

Corrective Action Taken - Readjusted breaker at lA east vital 230V control center.

Description Of Problem Underfrequency alarm is on.

Corrective Action Taken -

Repaired alarm.

Description Of Problem

- outboard fan bearing temperature 200°F tripped unit.

Corrective Action Taken - Put new grease in both bearing housings.

Description of Problem Pump failed to shutdown.

Corrective Action Taken -

Cleaned contacts.

Description Of Problem

- Failure alarm is annunciated.

Corrective Action Taken -

Rewired switch TD7332.

Description Of Problem

- Reduction gear needs a plug.

Corrective Action Taken - Installed plug.

e WORK ORDER NUMBER 945388 945400 945964 946097 911698 928455 928464 928465 928481 928482 928562 DEPT MD MD MD MD PD PD PD PD PD PD PD Page 6 of 9 EQUIPMENT IDENT;IJ?ICATION EXPLANATION OF WO:RK PE;RFOR,ME,D 25 Service Water Strainer Description Of Problem Flush and grease.

Pressurizer Relief Tank 2C Safeguard Emergency Cabinet Transient Data. Recorder Air Particular Detector Instru, 2R41A Instru, NR46 Instru, 2R41B Instru, 2Rl2B Corrective Action Taken - Flushed and added oil.

Description Of Problem

- Repair ruptured disc.

corrective Action Taken - Installed new disc and gasket.

Description of Problem Loss of voltage alarm, local trouble alarm will not clear.

Corrective Action Taken -

Replaced card in Slot 44.

Description of Problem

- Auto reverse micro switch inoperable.

Corrective Action Taken -

Replaced stop screw.

Description of Problem Flow reading below spec's.

Corrective Action Taken -

Replaced filter paper..

Description Of Problem Investigate-comm 1 errors.

Corrective Action Taken -

Replaced 866I module with new one.

Description Of Problem

- Pen does not respond.

Corrective Action Taken - overhauled recorder.

Description Of Problem Investigate comm 1 errors.

Corrective Action Taken -

Repaired 866I module.

Description Of Problem

- Analyzer module upper window is.629 volts.

Corrective Action Taken - Adjusted upper and lower windows.

Instru, 2N31-35, 2N32-36 Description Of Problem Perform electrical test for comparison with Unit No. 1 valves.

Corrective Action Taken - Rebuilt connectors at SR pre-amp.

Instru, 2Rl2B Description Of Problem No scan to compute.

Corrective Action Taken -

Reprogrammed and changed module.

__J

WORK ORDER NUMBER 932637 923653 932658 933972 934074 934075 934080 934091 934092 934147 934271 DEPT PD PD PD PD PD PD PD PD PD PD PD Page 7 of 9 EQUIPMENT IDE~TifICATION EXPLANATION OF WO~K PE:IU'OR,MED Instru, 2RllA Description Of Problem

- Investigate comm 1 errors to computer.

Instru, 2Rl2B Instru, 2PT536 Valve, 22AF21 Valve, 2NT35 21 Accumulator Pressure Valve, 23AF11 Valve, 21AF11 Valve, 22AF11 Audio Count Rate Drawer Instru, N41 Power Range Drawer Corrective Action Taken Replaced buffer and opto-couplers on receiver portion of comm loop.

Description Of Problem

- Analyzer module upper window out of spec.

Corrective Action Taken - Reset upper and lower window.

Description Of Problem 2BS536A resetting out of spec.

Corrective Action Taken - Replaced defective comparator.

Description Of Problem

- Exceeds stroke time.

Corrective Action Taken - Stroked valve and calibrated.

Description Of Problem

- Console valve position inaication erratic.

corrective Action Taken -

Replaced meter movement..

Description Of Problem

- Failed center scale.

Corrective Action Taken - Calibrated indicator, cleaned contacts.

Description Of Problem Does not make up open limit switch.

Corrective Action Taken - Adjusted limit switch.

Description Of Problem

- Exceeds required stroke time.

Corrective Action Taken - Stroked valve and adjusted positioner.

Description Of Problem

- Exceeds stroke time.

Corrective Action Taken - Stroked valve and adjusted positioner.

Description Of Probl_em Remove from Unit 2 and install in Unit 1.

Corrective Action Taken - Moved audio count rate channel from Unit 2 to Unit 1.

Description Of Problem Drawer found out of spec.

Corrective Action Taken Adjusted NM301, NM302, NM306, NM307.

Adjusted ion current gain for B detector.

J

r e

WORK ORDER NUMBER 934277 934350 937078 937166 937167 987192 944866 DEPT PD PD PD PD PD PD PD Page 8 of 9 EQUIPMENT IDEN~lrICATlON Instru, 2FT510 Instru, RMS System Boron Inj. Tank Flow Valve, 2CV172 Valve, 21MS18 Valve, 2SJ18 Instru, 2R41A I

EXPLANATlON or WO~K PERFOR.MEP Description Of Problem Loop found out of calibration.

Corrective Action Taken - Calibrated output.

Description Of Problem Reboot computer and reset failed channels.

Corrective Action Taken - Reinitialized computer.

Description Of Problem Flow meter is stuck at 5 gpm.

Corrective Action Taken - Valve was red tagged, flow went to normal.

Description Of Problem Doesn't make either limit switch.

Corrective Action Taken -

Repositioned actuator.

I Description Of Problem

- Doesn't have any open indication.

Corrective Action Taken - Tightened loose bolts around actuator.

Description Of Problem

- Repair air supply bleedoff.

Corrective Action Taken - Repaired bleedoff petcock.

Description Of Problem

- Filter tear alarm.

Corrective Action Taken -

Changed paper tape.

J

REFUELING INFORMATION MONTH:~ __

D_e_c_em_b_e_r __

l_98_o ________________ _

DOCKET NO. :

50-311

~-..;..~=-------~

UNIT:

Salem 112 DATE:

January 12, 1981 COMPLETED BY: L.K. Miller TELEPHONE: 609-365-7000 Ext. 507

l.

Refueling information has changed from last month:

YES NO X

2.

Scheduled date of next refueling:

March 20, 1982

~------------------------------~~

3.

Scheduled date for restart following refueling:

June 13, 1982

4.
  • A.

Will Technical Specification changes or other license amendments be required?

YES NO ---

NOT DETERMINED TO-DATE December 1980 B.

Has the reload fuel design been reviewed by the Station Operating Review Committee?

YES NO x

If no, when is it scheduled?

March 1982

~------....;...--------------------~--~

5.

Scheduled date(s) for submitting proposed licensing action:

March 1982 (If Required)

6.

Important licensing considerations associated with refueling:

None

7.

Number of Fuel Assemblies:

A.

In-Core 193 B.

In Spent Fuel Storage 0

8.

Present licensed spent fuel storage capacity:

1,170 Future spent fuel storage capacity:

1,170

  • 9.

Date of last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Page 9 of 9 8-l-7.R4 Discharge March 1999