Clinch River ESP - (External_Sender) Draft NRC ACRS Review Schedule
ML18064A215
Person / Time
Site: Clinch River
Issue date: 02/12/2018
From:
- No Known Affiliation
To:
References
+reviewed
Download: ML18064A215 (4)


Text

ClinchRiverESPHFNPEm Resource From: Schiele, Raymond Joseph <rjschiele@tva.gov>

Sent: Monday, February 12, 2018 9:00 AM To: Fetter, Allen

Subject:

[External_Sender] DRAFT NRC ACRS Review Schedule Attachments: NRC Chapter Review Schedule_Visual Aide (1).pptx Allen, Please find attached the latest draft Ray 1

Hearing Identifier: ClinchRiver_ESP_HF_NonPublic Email Number: 481 Mail Envelope Properties (0FA7144D673855418F1030CB8FBF3E612DF4C4C3)

Subject:

[External_Sender] DRAFT NRC ACRS Review Schedule Sent Date: 2/12/2018 8:59:39 AM Received Date: 2/12/2018 9:03:16 AM From: Schiele, Raymond Joseph Created By: rjschiele@tva.gov Recipients:

"Fetter, Allen" <Allen.Fetter@nrc.gov>

Tracking Status: None Post Office: TVACHAXCH8.main.tva.gov Files Size Date & Time MESSAGE 55 2/12/2018 9:03:16 AM NRC Chapter Review Schedule_Visual Aide (1).pptx 8364133 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

NRC Advanced Safety Evaluation Report Review Schedule 2018 2019 Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Jan Feb Mar Apr May Jun 13.6 Physical Security 2.1 & 2.2 Geography and Demography and Nearby Industrial, Transportation, and Military Facilities 2.3 Meteorology 2.4 Hydrologic Engineering 2.5 Geology, Seismology, and Geotechnical Engineering 3.5.1.6 Aircraft Hazards 11.2 & 11.3 Radiological Effluent Releases (Gaseous & Liquid) 13.3 Emergency Planning 13.3.4.3.1 Methodology for EPZ Sizing 15.0.3 Radiological Consequences of DBAs 17.0 Quality Assurance Phase B Complete ACRS Meetings SER w/ no OIs Phase B PM, LA, QTE, BC, OGC concurrence (90 days +/-)

(10/20/18 -T)

Phase B Advanced SE w/ no OIs TVA Tech NRC Tech Reviewer(s), NRC Team Interface (Tech Branch BC transmittal date to DNRL)

Chapter Section(s) TVA Team Lead PM Reviewer(s) Office/Division Lead Chapter(s) PM, LA, QTE, BC, OGC concurrence (90 days +/-)

2.1: Geography and Demography John Thomas/Alex Seshagiri Tammara (Rao), Allen 2.2: Nearby Industrial, Enercon/Bechtel Michael Dudek 2/22/2018 (EPM)

Young NRO/DSEA Fetter Transportation, and Military Facilities 11.3, John Thomas/Alex Kevin Quinlan, Mike Mazaika, & Mallecia 2.3: Meteorology Enercon Brad Harvey 13.3, & 5/21/2018 (EPM)

Young Jason White, NRO/DSEA Sutton 15.0.3 D. Lundy/John Joe Giacinto, Yuan Cheng, & Laurel Bauer Mallecia 2.4: Hydrologic Engineering BWSC/Bechtel 11.4 5/21/2018 (EPM)

Thomas/Alex Young Steve Breithaupt, NRO/DSEA (acting) Sutton Gerry Stirewalt, David Heeszel, 2.5: Geology, Seismology, and Bechtel/Rizzo/ Laurel Bauer Allen 5/21/2018 (2.5.4 & 2.5.5) (EPM)

Wally Justice Ricardo Rodriguez, & Weijun 2.4 Geotechnical Engineering URS (acting) Fetter 5/21/2018 (2.5.1, 2.5.2, & 2.5.3) (EPM)

Wang, NRO/DSEA John Thomas/Alex Seshagiri Tammara (Rao), Allen 3.5.1.6: Aircraft Hazards Bechtel Michael Dudek 2/22/2018 (EPM)

Young NRO/DSEA Fetter 11.2: Radiological Effluent Release (liquid) John Thomas/Alex Mallecia Bechtel Rich Clement, NRO/DSEA Michael Dudek 2.3 & 2.4 2/22/2018 (EPM) 11.3: Radiological Effluent Young Sutton Release (gaseous)

Joe Bruce Musico & Dan Barss, NRO Mallecia 13.3: Emergency Planning Enercon Archie Manoharan Anderson/Dan 2.3 6/26/2018 (EPM)

DCIP Sutton Barss 13.3.4.3.1: Methodology for EPZ John Thomas/Archie Mallecia Enercon Michelle Hart, NRO/DSEA Michael Dudek 6/26/2018 (EPM)

Siting (input to EP) Manoharan Sutton Mallecia 13.6: Physical Security Pat Asendorf Kevin Casey David Diec, NRO DCIP Alison Rivera 2/16/2018 (EPM)

Sutton 15.0.3: Radiological John Thomas/Alex Seshagiri Tammara (Rao), Allen Consequences of Design Basis Bechtel Michael Dudek 2.3 2/22/2018 (EPM)

Young NRO/DSEA Fetter Accidents Aaron Allen 17.0: Quality Assurance England/Rob Roger Scott Nicholas Savwoir, NRO DCIP Terry Jackson 5/21/2018 (EPM)

Fetter Seipel