Clinch River ESP - (External_Sender) FW: Updated Schedule for Alan
ML18064A210
Person / Time
Site: Clinch River
Issue date: 02/07/2018
From:
- No Known Affiliation
To:
References
+reviewed
Download: ML18064A210 (12)


Text

ClinchRiverESPHFNPEm Resource From: Schiele, Raymond Joseph <rjschiele@tva.gov>

Sent: Wednesday, February 07, 2018 9:53 AM To: Fetter, Allen Cc: Stout, Daniel Paul

Subject:

[External_Sender] FW: Updated Schedule for Alan Attachments: NRC Chapter Review Schedule_Visual Aide.pptx Allen, please find attached a visual representation of the ACRS schedule for planning purposes. When would be a good time to discuss? I am in meetings most of today, but will make time Thanks Ray From: Klein, Spencer Paul Sent: Wednesday, February 07, 2018 7:30 AM To: Schiele, Raymond Joseph

Subject:

Updated Schedule for Alan See attached Spencer Klein Associate Project Manager Clinch River Small Modular Reactor Project Tennessee Valley Authority 1101 Market Street Chattanooga, TN 37402 423-751-8197 (w) 865-466-9248 (m) spklein@tva.gov NOTICE: This electronic message transmission contains information that may be TVA SENSITIVE, TVA RESTRICTED, or TVA CONFIDENTIAL. Any misuse or unauthorized disclosure can result in both civil and criminal penalties. If you are not the intended recipient, be aware that any disclosure, copying, distribution, or use of the content of this information is prohibited. If you have received this communication in error, please notify me immediately by email and delete the original message.

1

Hearing Identifier: ClinchRiver_ESP_HF_NonPublic Email Number: 478 Mail Envelope Properties (0FA7144D673855418F1030CB8FBF3E612DF4AC98)

Subject:

[External_Sender] FW: Updated Schedule for Alan Sent Date: 2/7/2018 9:53:17 AM Received Date: 2/7/2018 9:59:48 AM From: Schiele, Raymond Joseph Created By: rjschiele@tva.gov Recipients:

"Stout, Daniel Paul" <dpstout@tva.gov>

Tracking Status: None "Fetter, Allen" <Allen.Fetter@nrc.gov>

Tracking Status: None Post Office: TVACHAXCH8.main.tva.gov Files Size Date & Time MESSAGE 1358 2/7/2018 9:59:48 AM image001.png 2604 image002.png 1234 image003.png 1971 image004.png 1977 image005.png 2065 image006.png 2130 image007.png 1985 image008.png 1922 NRC Chapter Review Schedule_Visual Aide.pptx 8380447 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

2016 2017 2018 2019 2020 ESPA NRC Advanced Safety Evaluation Report NRC Submitted Issues ESP 5-12-16 Review Schedule PSER &

RAIs 2.1 & 2.2 Geography and Demography and Nearby Industrial, Transportation, and Military Facilities 2.3 Meteorology 2.4 Hydrologic Engineering 2.5 Geology, Seismology, and Geotechnical Engineering 13.6 Physical Security 3.5.1.6 Aircraft Hazards 11.4.1 & 11.4.2 Radiological Effluent Releases (Gaseous & Liquid) 13.3 Emergency Planning 13.3.4.3.1 Methodology for EPZ Sizing 15.0.3 Radiological Consequences of DBAs 17.0 Quality Assurance Phase B Complete ACRS Meetings FSER Mandatory ASLB SER w/ no OIs Hearing Phase B Phase A Phase C Phase D PM, LA, QTE, BC, OGC concurrence (90 days +/-)

(8/4/17 - A) (3/26/19 - T) (8/17/19 - T)

(10/20/18 -T)

Phase B Advanced SE w/ no OIs TVA Tech NRC Tech Reviewer(s), NRC Team Interface SER Sections, ADAMS (Tech Branch BC transmittal date to DNRL)

Chapter Section(s) TVA Team Lead PM Reviewer(s) Office/Division Lead Chapter(s) Package Number(s) PM, LA, QTE, BC, OGC concurrence (90 days +/-)

2.1: Geography and Demography John Thomas/Alex Seshagiri Tammara (Rao), Allen Phase A - ML17116A283 2.2: Nearby Industrial, Enercon/Bechtel Michael Dudek 2/22/2018 (EPM)

Young NRO/DSEA Fetter Phase B - ML17289B043 Transportation, and Military Facilities 11.4.2, John Thomas/Alex Kevin Quinlan, Mike Mazaika, & Mallecia Phase A - ML17215A906 2.3: Meteorology Enercon Brad Harvey 13.3, & 5/21/2018 (EPM)

Young Jason White, NRO/DSEA Sutton Phase B - ML17289B135 15.0.3 D. Lundy/John Joe Giacinto, Yuan Cheng, & Laurel Bauer Mallecia Phase A - ML17215A906 2.4: Hydrologic Engineering BWSC/Bechtel 11.4 5/21/2018 (EPM)

Thomas/Alex Young Steve Breithaupt, NRO/DSEA (acting) Sutton Phase B - ML17289B135 Gerry Stirewalt, David Heeszel, 2.5: Geology, Seismology, and Bechtel/Rizzo/ Laurel Bauer Allen Phase A - ML17216A186 5/21/2018 (2.5.4 & 2.5.5) (EPM)

Wally Justice Ricardo Rodriguez, & Weijun 2.4 Geotechnical Engineering URS (acting) Fetter Phase B - ML17289B214 5/21/2018 (2.5.1, 2.5.2, & 2.5.3) (EPM)

Wang, NRO/DSEA John Thomas/Alex Seshagiri Tammara (Rao), Allen Phase A - ML17116A306 3.5.1.6: Aircraft Hazards Bechtel Michael Dudek 2/22/2018 (EPM)

Young NRO/DSEA Fetter Phase B - ML17289B272 11.4.1: Radiological Effluent Release (liquid) John Thomas/Alex Mallecia Phase A - ML17216A553 Bechtel Rich Clement, NRO/DSEA Michael Dudek 2.3 & 2.4 2/22/2018 (EPM) 11.4.2: Radiological Effluent Young Sutton Phase B - ML17289A671 Release (gaseous)

Joe Bruce Musico & Dan Barss, NRO Mallecia Phase A - ML17214A319 13.3: Emergency Planning Enercon Archie Manoharan Anderson/Dan 2.3 6/26/2018 (EPM)

DCIP Sutton Phase B - ML17291A039 Barss 13.3.4.3.1: Methodology for EPZ John Thomas/Archie Mallecia Phase A - ML17214A751 Enercon Michelle Hart, NRO/DSEA Michael Dudek 6/26/2018 (EPM)

Siting (input to EP) Manoharan Sutton Phase B - ML17291A069 Mallecia Phase A - ML17200D087 13.6: Physical Security Pat Asendorf Kevin Casey David Diec, NRO DCIP Alison Rivera 4/18/2018 (EPM)

Sutton Phase B - ML17291A090 15.0.3: Radiological John Thomas/Alex Seshagiri Tammara (Rao), Allen Phase A - ML17178A395 Consequences of Design Basis Bechtel Michael Dudek 2.3 2/22/2018 (EPM)

Young NRO/DSEA Fetter Phase B - ML17291A146 Accidents Aaron Allen Phase A - ML17215B021 17.0: Quality Assurance England/Rob Roger Scott Nicholas Savwoir, NRO DCIP Terry Jackson 5/21/2018 (EPM)

PLACE THE TITLE OF THE PRESENTATION HERE l 2 Fetter Phase B - ML17291A527 Seipel