ML18059A630
| ML18059A630 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 12/31/1993 |
| From: | Vanwagner M CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18059A629 | List: |
| References | |
| NUDOCS 9401130056 | |
| Download: ML18059A630 (4) | |
Text
OPERATING DATA REPORT OPERATING STATUS:
- 1.
UNIT NAME
- 2.
REPORTING PERIOD:
Palisades 931201-931231
- 3.
LICENSED THERMAL POWER (MWt)
- 4.
NAMEPLATE RATING (GROSS MWe)
- 5.
DESIGN ELECTRICAL RATING (NET MWe)
- 6.
MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)
- 7.
MAXIMUM DEPENDABLE CAPACITY (NET MWe) 2530.0 811. 7 805.0
- 770
- 730
- 8.
IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7)
GIVE REASOHS:
SINCE LAST REPORT
- 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
- 11. HOURS IN REPORTING PERIOD
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL
- 13. REACTOR RESERVE SHUTDOWN HOURS
- 14. HOURS.GENERATOR ON-LINE
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED CMWH)
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
- 18. NET ELECTRICAL ENERGY GENERATED CMWH)
- 19. UNIT SERVICE FACTOR
- 20. UNIT AVAILABILITY. FACTOR
- 21. UNIT CAPACITY FACTOR (USING MDC NET)
- 22. UNIT CAPACITY FACTOR (USING DER NET)
- 23. rnl!T FORCED OUTAGE RATE This Month 744.0 744.0 744.0 1876608.0 619380.0 589739.0 100.0%
100.0%
108.6%
98.5%
0.0%
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- -Based on condenser backpressure
-~
- r:
- Weighted Average (635 MWe used as MDC Net_ prior to October 1985)
- 1;,w.*"940f130056."':940i"o6_.,.,1.tl*1.... f".......................
l PJ)R ADOC~-- 05.090255 *
,* R
', ' "PM'.
I I I
~ *
~,
1:_~*~ 1
~,.
...~ _ _
r i
Yr-to-Date 8760.0 4707.4 4595.0 11366847.b 3728320.0 3545655.0 52.5%
52.5%
55.4%
50.3%
8.5%
Forecast DOCKET NO 50-255 DATE 12-31-93 COMPLETED BY MMVanWagner TELEPHONE (616)764-8913 NOTES:
Cumulative 193167.0 108440.0 103801.6 223662819.0 70618503.0 66582735.0 53.7%
- 53. 7°!.
51.3%*
42.8%
29.6%
Achieved
SUMMARY
OF OPERATING EXPERIENCE FOR DECEMBER 1993 The plant operated at full power for the entire month of December.
AVERAGE DAILY UNIT POWER LEVEL MONTH _ ___,D=E=C E=M=B=ER_,___
DAY AVERAGE DAILY POWER LEVEL (MWe Net)
- 1.
805
- 2.
794
- 3.
802
- 4.
795.
- 5.
794
- 6.
794
- 7.
794
- 8.
794
- 9.
792
- 10.
791
- 11.
791
- 12.
792
- 13.
791
- 14.
791
- 15.
792
- 16.
790 INSTRUCTIONS:
DAY
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
- 23.
- 24.
- 25.
- 26.
- 27.
- 28.
2.9.
- 30.
- 31.
DOCKET NO 50-255 UNIT Palisades DATE 01/06/94 COMPLETED BY MMVanWaqner TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 791 790 790 790 791 791 792 791 793 793 793 793 793
.793 786 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.
Compute to the nearest whole me~awatt.
RE PORT MONTH _ ___,D=E=C=EM=B=ER"--"1=99=3'----
No.
Date Type 1 NONE
- 1.
- 2.
F:
Forced S:
Scheduled Duration Reason2 (Hours)
Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refue ling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain)
UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor 3
Report #
- 3.
Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)
- 4.
System Code4 Component Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Cause & Corrective Action to Prevent Recurrence
- 5.
DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Pali sades 01/06/94 MMVanWagner*
(616)764-8913