Monthly Operating Rept for Dec 1993 for Palisades Nuclear Plant
ML18059A630
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1993
From: Vanwagner M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18059A629 List:
References
NUDOCS 9401130056
Download: ML18059A630 (4)


Text

OPERATING DATA REPORT DOCKET NO 50-255 DATE 12-31-93 COMPLETED BY MMVanWagner TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 931201-931231
3. LICENSED THERMAL POWER (MWt) 2530.0
4. NAMEPLATE RATING (GROSS MWe) 811. 7
5. DESIGN ELECTRICAL RATING (NET MWe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) **730
8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT GIVE REASOHS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744.0 8760.0 193167.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 4707.4 108440.0
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS.GENERATOR ON-LINE 744.0 4595.0 103801.6
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED CMWH) 1876608.0 11366847.b 223662819.0
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 619380.0 3728320.0 70618503.0
18. NET ELECTRICAL ENERGY GENERATED CMWH) 589739.0 3545655.0 66582735.0
19. UNIT SERVICE FACTOR 100.0% 52.5% 53.7%
20. UNIT AVAILABILITY. FACTOR 100.0% 52.5% 53. 7°!.
21. UNIT CAPACITY FACTOR (USING MDC NET) 108.6% 55.4% 51 .3%*
22. UNIT CAPACITY FACTOR (USING DER NET) 98.5% 50.3% 42.8%
23. rnl!T FORCED OUTAGE RATE 0.0% 8.5% 29.6%
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • -Based on condenser backpressure
. . -~ *r: *
  • Weighted Average (635 MWe used as MDC Net_ prior to October 1985)
          • 1  ;,w.*"940f130056."':940i"o6_.,.,1.tl*1....f".......................

l PJ)R ADOC~-- 05.090255 * *: - : :

' ,* R

  • ~ * ..... ,

' *, ' , ' "PM'.

. **:* ... ~, 1:_~*~ ,,!. ~ ,.

I I

...~ _ _

I '

r 1

i

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1993 The plant operated at full power for the entire month of December.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 01/06/94 COMPLETED BY MMVanWaqner MONTH _ ___,D=E=CE=M=B=ER_,___ TELEPHONE (616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 805 17. 791
2. 794 18. 790
3. 802 19. 790
4. 795 . 20. 790
5. 794 21. 791
6. 794 22. 791
7. 794 23. 792
8. 794 24. 791
9. 792 25. 793
10. 791 26. 793
11. 791 27. 793
12. 792 28. 793
13. 791 2.9. 793
14. 791 30. .793
15. 792 31. 786
16. 790 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to the nearest whole me~awatt.

DOCKET NO 50-255 UNIT Pali sades DATE 01/06/94 COMPLETED BY MMVanWagner*

RE PORT MONTH _ ___,D=E=C=EM=B=ER"--"1=99=3'---- TELEPHONE (616)764-8913 UNIT SHUTDOWNS AND POWER REDUCTIONS No. Date Type 1 Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Shutting Event Code 4 Code 6 Action to Down Reactor 3 Report # Prevent Recurrence NONE

1. 2. 3. 4. 5.

F: Forced Reason: Method: Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refue ling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)