ML18059A630

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1993 for Palisades Nuclear Plant
ML18059A630
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1993
From: Vanwagner M
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML18059A629 List:
References
NUDOCS 9401130056
Download: ML18059A630 (4)


Text

OPERATING DATA REPORT OPERATING STATUS:

1.

UNIT NAME

2.

REPORTING PERIOD:

Palisades 931201-931231

3.

LICENSED THERMAL POWER (MWt)

4.

NAMEPLATE RATING (GROSS MWe)

5.

DESIGN ELECTRICAL RATING (NET MWe)

6.

MAXIMUM DEPENDABLE CAPACITY (GROSS MWe)

7.

MAXIMUM DEPENDABLE CAPACITY (NET MWe) 2530.0 811. 7 805.0

    • 770
    • 730
8.

IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7)

GIVE REASOHS:

SINCE LAST REPORT

9.

POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe):

10. REASONS FOR RESTRICTIONS, IF ANY:
11. HOURS IN REPORTING PERIOD
12. NUMBER OF HOURS REACTOR WAS CRITICAL
13. REACTOR RESERVE SHUTDOWN HOURS
14. HOURS.GENERATOR ON-LINE
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED CMWH)
17. GROSS ELECTRICAL ENERGY GENERATED (MWH)
18. NET ELECTRICAL ENERGY GENERATED CMWH)
19. UNIT SERVICE FACTOR
20. UNIT AVAILABILITY. FACTOR
21. UNIT CAPACITY FACTOR (USING MDC NET)
22. UNIT CAPACITY FACTOR (USING DER NET)
23. rnl!T FORCED OUTAGE RATE This Month 744.0 744.0 744.0 1876608.0 619380.0 589739.0 100.0%

100.0%

108.6%

98.5%

0.0%

24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • -Based on condenser backpressure

-~

  • r:
  • Weighted Average (635 MWe used as MDC Net_ prior to October 1985)
          • 1;,w.*"940f130056."':940i"o6_.,.,1.tl*1.... f".......................

l PJ)R ADOC~-- 05.090255 *

,* R

', ' "PM'.

I I I

~ *

~,

1:_~*~ 1

~,.

...~ _ _

r i

Yr-to-Date 8760.0 4707.4 4595.0 11366847.b 3728320.0 3545655.0 52.5%

52.5%

55.4%

50.3%

8.5%

Forecast DOCKET NO 50-255 DATE 12-31-93 COMPLETED BY MMVanWagner TELEPHONE (616)764-8913 NOTES:

Cumulative 193167.0 108440.0 103801.6 223662819.0 70618503.0 66582735.0 53.7%

53. 7°!.

51.3%*

42.8%

29.6%

Achieved

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1993 The plant operated at full power for the entire month of December.

AVERAGE DAILY UNIT POWER LEVEL MONTH _ ___,D=E=C E=M=B=ER_,___

DAY AVERAGE DAILY POWER LEVEL (MWe Net)

1.

805

2.

794

3.

802

4.

795.

5.

794

6.

794

7.

794

8.

794

9.

792

10.

791

11.

791

12.

792

13.

791

14.

791

15.

792

16.

790 INSTRUCTIONS:

DAY

17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.

2.9.

30.
31.

DOCKET NO 50-255 UNIT Palisades DATE 01/06/94 COMPLETED BY MMVanWaqner TELEPHONE (616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 791 790 790 790 791 791 792 791 793 793 793 793 793

.793 786 On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.

Compute to the nearest whole me~awatt.

RE PORT MONTH _ ___,D=E=C=EM=B=ER"--"1=99=3'----

No.

Date Type 1 NONE

1.
2.

F:

Forced S:

Scheduled Duration Reason2 (Hours)

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refue ling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS Method of Licensee Shutting Event Down Reactor 3

Report #

3.

Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-0ther (Explain)

4.

System Code4 Component Code6 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Cause & Corrective Action to Prevent Recurrence

5.

DOCKET NO UNIT DATE COMPLETED BY TELEPHONE Exhibit I - Same Source 50-255 Pali sades 01/06/94 MMVanWagner*

(616)764-8913