IR 05000247/2017006

From kanterella
(Redirected from ML18058A058)
Jump to navigation Jump to search
Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2017006 and 05000286/2017006, Report 05000247/2017402 and 05000286/2017402, Report 05000247/2017501 and 05000286/2017501)
ML18058A058
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 02/28/2018
From: Daniel Schroeder
Reactor Projects Branch 2
To: Vitale A
Entergy Nuclear Operations
Schroeder D
References
IR 2017006, IR 2017402, IR 2017501
Download: ML18058A058 (7)


Text

ary 28, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR INDIAN POINT ENERGY CENTER, UNITS 2 AND 3 (REPORT 05000247/2017006 AND 05000286/2017006, REPORT 05000247/2017402 AND 05000286/2017402, REPORT 05000247/2017501 AND 05000286/2017501)

Dear Mr. Vitale:

The NRC has completed its end-of-cycle performance assessment of Indian Point Energy Center, Units 2 and 3, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Indian Point Energy Center, Units 2 and 3, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In addition to the baseline inspections, the NRC will conduct Inspection Procedure (IP) 60845, Operation of Inter-Unit Fuel Transfer Canister and Cask System, IP 60855.1, Operation of an Independent Spent Fuel Storage Facility (ISFSI) at Operating Plants, and IP 92709, Contingency Plans for Licensee Strikes or Lockouts. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5262 with any questions you have regarding this letter.

Sincerely,

/RA/

Daniel L. Schroeder, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure:

Inspection Activity Plan Report cc w/encl: Distribution via ListServ

ML18058A058 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer DSchroeder DATE 2/27/18 2/28/18

IP 22 Inspection Activity Plan Report Indian Point 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count UNIT 2 INSERVICE INSPECTION 1 2 03/26/2018 04/06/2018 IP 71111.08P 000702 Inservice Inspection Activities - PWR RP RAD HAZARD, ALARA, AIRBORNE 01, 02, 03 1 2, 3 03/26/2018 03/30/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 03/26/2018 03/30/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 03/26/2018 03/30/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation REMP 07 1 2, 3 06/11/2018 06/15/2018 IP 71124.07 000731 Radiological Environmental Monitoring Program TRIENNIAL HEAT SINK 1 2, 3 07/16/2018 07/20/2018 IP 71111.07T 000700 Heat Sink Performance -Triennial OPERATION OF INTER-UNIT FUEL TRANSFER 1 2, 3 08/01/2018 08/31/2018 IP 60845 000588 Operation of Inter-Unit Fuel Transfer Canister and Cask System RAD HAZARD, ALARA and DOSE ASSESS 01, 02, 04 1 2, 3 08/06/2018 08/10/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 08/06/2018 08/10/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 08/06/2018 08/10/2018 IP 71124.04 000728 Occupational Dose Assessment FORCE-ON-FORCE PLANNING & EXERCISE WEEK 7 2, 3 09/10/2018 09/14/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 2, 3 10/01/2018 10/05/2018 IP 71130.03 000735 Contingency Response - Force-On-Force Testing EP EXERCISE INSPECTION 4 2, 3 09/24/2018 09/28/2018 IP 71114.01 000716 Exercise Evaluation 2, 3 09/24/2018 09/28/2018 IP 71151 001397 Performance Indicator Verification IP2 REQUAL INSP WITH P/F RESULTS 2 2 10/15/2018 10/19/2018 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 2 10/15/2018 10/19/2018 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial This report does not include INPO and OUTAGE activities. Page 1 of 4 This report shows only on-site and announced inspection procedures.

2/15/2018 9:54:52 AM Enclosure

IP 22 Inspection Activity Plan Report Indian Point 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count DBAI - Team 7 2, 3 10/22/2018 10/26/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

2, 3 11/05/2018 11/09/2018 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

ACCESS AUTH & CONTROL, SGI CONTROL, FFD 3 2, 3 10/29/2018 11/02/2018 IP 71130.01 000733 Access Authorization 2, 3 10/29/2018 11/02/2018 IP 71130.02 000734 Access Control 2, 3 10/29/2018 11/02/2018 IP 71130.06 000738 Protection of Safeguards Information 2, 3 10/29/2018 11/02/2018 IP 71130.08 000740 Fitness For Duty Program 2, 3 10/29/2018 11/02/2018 IP 71151 001338 Performance Indicator Verification RAD HAZARD, ALARA, AIRBORNE, DOSE ASSESS, PI's 01, 02, 03, 04, PR01, OR01 1 2, 3 12/03/2018 12/07/2018 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 12/03/2018 12/07/2018 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 12/03/2018 12/07/2018 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 12/03/2018 12/07/2018 IP 71124.04 000728 Occupational Dose Assessment 2, 3 12/03/2018 12/07/2018 IP 71151 000746 Performance Indicator Verification INDIAN POINT 2 INITIAL OL EXAM 4 2 12/17/2018 12/21/2018 OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

2 02/04/2019 02/15/2019 EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)

INSERVICE INSPECTION - UNIT 3 1 3 03/18/2019 03/29/2019 IP 71111.08P 000702 Inservice Inspection Activities - PWR RAD HAZARD, ALARA, AIRBORNE .01, .02, .03 1 2, 3 03/18/2019 03/22/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 03/18/2019 03/22/2019 IP 71124.02 000726 Occupational ALARA Planning and Controls 2, 3 03/18/2019 03/22/2019 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation EQ PROGRAM 3 2, 3 06/10/2019 06/14/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

2, 3 06/24/2019 06/28/2019 IP 71111.21N 000714 Design Bases Assurance Inspection (Programs)

EP PROGRAM INSPECTION 2 2, 3 07/15/2019 07/19/2019 IP 71114.02 000717 Alert and Notification System Testing This report does not include INPO and OUTAGE activities. Page 2 of 4 This report shows only on-site and announced inspection procedures.

2/15/2018 9:54:52 AM

IP 22 Inspection Activity Plan Report Indian Point 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count EP PROGRAM INSPECTION 2 2, 3 07/15/2019 07/19/2019 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 2, 3 07/15/2019 07/19/2019 IP 71114.05 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies 2, 3 07/15/2019 07/19/2019 IP 71151 001397 Performance Indicator Verification PI&R BIENNIAL 4 2, 3 07/29/2019 08/02/2019 IP 71152B 000747 Problem Identification and Resolution 2, 3 08/12/2019 08/16/2019 IP 71152B 000747 Problem Identification and Resolution RAD GAS AND LIQUID EFFLUENT TREATMENT (RETS) 06 1 2, 3 08/12/2019 08/16/2019 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment ACCESS CONTROL, EQUIP PERF, TRAINING 3 2, 3 09/09/2019 09/13/2019 IP 71130.02 000734 Access Control 2, 3 09/09/2019 09/13/2019 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 2, 3 09/09/2019 09/13/2019 IP 71130.07 000739 Security Training 2, 3 09/09/2019 09/13/2019 IP 71151 001338 Performance Indicator Verification DOSE ASSESS, INSTRUMENTATION, 04, 05 1 2, 3 09/16/2019 09/20/2019 IP 71124.04 000729 Occupational Dose Assessment 2, 3 09/16/2019 09/20/2019 IP 71124.05 000729 Radiation Monitoring Instrumentation CYBER MS8 2 2, 3 09/16/2019 09/20/2019 IP 71130.10P 000741 Cyber Security 2, 3 09/30/2019 10/04/2019 IP 71130.10P 000741 Cyber Security ISFSI OPERATIONAL INSPECTION 2 2, 3 10/07/2019 10/11/2019 IP 60855 001001 Operation Of An ISFSI 2, 3 10/07/2019 10/11/2019 IP 60855.1 000590 Operation of an Independent Spent Fuel Storage Installation at Operating Plants IP3 REQUAL INSP WITH P/F RESULTS 2 3 10/14/2019 10/18/2019 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance -

Annual 3 10/14/2019 10/18/2019 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance -

Biennial This report does not include INPO and OUTAGE activities. Page 3 of 4 This report shows only on-site and announced inspection procedures.

2/15/2018 9:54:52 AM

IP 22 Inspection Activity Plan Report Indian Point 01/01/2018 - 12/31/2019 Unit Start End Activity CAC Title Staff Count MC&A 1 2, 3 10/21/2019 10/25/2019 IP 71130.11 000742 Material Control and Accounting (MC&A)

RAD HAZARD,DOSE ASSESSMENT, PI's 01, 04, PR01, OR01 1 2, 3 12/09/2019 12/13/2019 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls 2, 3 12/09/2019 12/13/2019 IP 71124.04 000729 Occupational Dose Assessment 2, 3 12/09/2019 12/13/2019 IP 71151 000746 Performance Indicator Verification This report does not include INPO and OUTAGE activities. Page 4 of 4 This report shows only on-site and announced inspection procedures.

2/15/2018 9:54:52 AM