PALISADE~ NUCL~AR PLANT EMERGENCY IMPLEMENTATION PROCEDURE Revision and Approval Summary TITLE:

POST ACCIDENT SAMPLING - PCS LIQUID/GAS AND CONTAINMENT AIR

1.

Prepa ed

~:::::::::::::..-=-:ec...-===-~-~re:::L.~~--- /#4-fk,'Z Date

3.

Q-List Yes Recommend Approval

s.

Approved

-~*C0 Final Approver

6.

Word Processing Incorporated

7.

ei1182-0021c154-93

  • ,.~p¢2 Date Date Date Date Date
2.
4.

TCN Proc No EI-7.1 Revision 9 Date 01/ 10/90

,, r

. '.~

H

  • 1.0 2.0 3.0 4.0 4.1 4~2 4.3 5::;.0 5.1 5.2 5.2.1 5.2.2 5.2.3 5.2.* 4 5.2.5 5.2.6 5.2.7 5.2.8 PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMP~ATION PROCEDURE Revision 9 Page 1 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR Table of Contents PERSONNEL RESPONSIBILITY

  • PURPOSE

'REFERENCES

  • INITIAL CONDITIONS AND REQUIREMENTS DOSIMETRY REQUIREMENTS * * * *

~ * *

  • ANTI-CONTAMINATION. CLOTHING REQUIREMENTS * * * * ** *

'.GENERAL.'RADIOLOGICAL *.PRECAUTIONS

.*PROCEDURE PRESAMPLE SURVEY PASM PANEL PREPARATION * * * *

  • Sample Cask Preparation Sample Cask Positioning Evacuation of PCS Liguid Sample Section Evacuation of PCS Offgas Section
  • Containment Air Evacuation * *
  • PASM Setup and Evacuation Completion Notification Sam~le PCS Liguid/Gas 1

1 1

1 1

1 1

2 2

3 4

7 8

9 9

11

  • 12
  • 12 5.2.9 -- LPSI Sample Purge _(Only}_
  • -~ - *-.

-*.15 5.2.10 Liguid Sample Purge

  • 15 5.3 OPERATION OF INLINE INSTRUMENTS pH DISSOLVED OXYGEN 16 5.3.1 Capturing the Pressurized Liquid Sample in SF-1
    • 16 eil182-002lbl54

5.3.2

5.3.3 TITLE

PALISADES NUCLEAR PLANT EMERGENCY I'.MPLEMEHTATIOH PROCEDURE POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR Table of Contents Chem Tech at the PASM Panel Chem Tech at the EC-168 Panel 5.3.4 PASM Liquid Sample Section Flush (DI Water) 5.4 PCS OFFGAS - (Hz AND ACTIVITY) ***

5.4.1 Diluted Offgas Sample Acquisition ****

5.4.2 Undiluted Offgas Sample Acquisition Proc No EI-7.1 Revisi'?n 9 Page ii

    • 17
  • 18 18 19
  • 19
  • ** 21

. S.5

.DILUTED'_LIQUID... SAMPLE.'(BORON,,AND ACTIVITY).: ACQUISITION.*.*.*.*.*

  • 23 5\\.6

.UNDILUTED LIQUID-SAMPLE (pH AND CHLORIDES)

.** 24 5.7 POST SAMPLE FLUSH.........

    • 25
5. 7.1 Cask Needle and Sample Flask Flush *
  • *
  • 25 5.7.2 MC-1 Flush * * * * * *......

26 5.7.3 N7 Purge to Gas Chromatograph Coelescing Filter

      • 27 5.8 CONTAINMENT AIR SAMPLE (DILUTED) 27 5.8.1 Sample Purge **********
  • 27 5.8.2 GC Sample Collection and Analysis ** *

. ** 29 5.8.4 PASM Shutdown

  • 30 6.0 ATTACHMENTS... ~

31 ei 1182-0021 bl54

~.

Ii

Jp.

TEMPORAilY CHANGE NUMBER

£.I-90-tJIJ3 Pree No 10.41 Revision 12 Page 1 of 2 TEMPORARY CHANGE TO A PROCEDURE Procedure Type,G,erc;e,uc.y r.....,;,.,.,... tid>i,£,P~cedure No Ex-7, I Rev No/Date 9

I 3 7 D (Y

r c

Procedure Titlefesr Acc1DRA./T :{41U:µL1A/G--- ks L1Q1-t11f/64 ~ti-Nu fP/VTA-/.N/ftpVTA-t R Word Paragraph No,.:s; 2r J Attachment N fa.

Processing No

,6,5- ~

I Reason for this change: Aoc.g-,QqRA-L-t::::A/4-N<f,.:cf.ifc:Oy1 gg.2) To OpeRA-Te: ~

  • c-/o3 ;>A-Ne-L_ ~v.!{,-kr -d(S V.:t/vc..,- fflv-1ftJ W??1FV 14fv-/"113{"G-Z~) 15

/.IV 7fe_

2 o{::_/oc.k j;)OS/bO/V,

!JI Vs:-.

1FV,4/v-19/J e::,.-zs. /~ /"IJ -Iii 202-/oc os160N",.

£o7e---rzr #lv-/91"3 (<f.-

1 25-)r;;ct:_.v To /ef e 2 c;~/oc<1:J05r'bC/-v 7

Vs--~,-r=V #v-1913 {&-2£"""),,1,s

//r./ -!fe 2 o 'C./oc:::,k-oas*rc/o,.f...-

7 Reconunend change be made permanent?

(Yes~ If NO, expiration date 1/-7-?lt:?

Does the Procedure require PRC review per~nistrative Proce~421 ~

No)

The above meets the criteria on the reverse side

~~~

13-7-/o Initiator Date Approved

(/J;ftll~1 3-1-ro Approved PRC Member Date Change to become permanent? (Yes No)

PRC Review Meeting Number Change Approved?

(Yes No)

I Department Manager Date ad0582-0003e-93 COPY

I

  • ~
  • PALISADES NUCI.EAR PLANT Proc No EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 1 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR 1.0 PERSONNEL RESPONSIBILITY The Operations Support Group Leader in the Technical Support Center (TSC) shall initiate this procedure.

In the absence of the Operations Support Group Leader, the Site Emergency Director shall delegate this responsibility.

The Operational Support Center (OSC) Chemistry Supervisor shall implement this procedure.

2.0 PURPOSE 3.0 3~ 1

.J-.2 3.3 3.4 4.0 4.1 To describe the sequential method of sampling the Primary Coolant System and/or the Containment Atmosphere during a post accident condition using PASM.

REFERENCES

.EI-7.0, "Emergency Post Accident Sampling.Decision Process" EI-7.2, "Emergency Post Accident Analysis" EI-16.2, "PASM - Supplies and Equipment Checklists" EI-11.2, "Estimation of Core Damage from Post Accident Sampling" INITIAL COBDITIONS AND REQUIREMENTS DOSIMETRY REQUIREMENTS Each individual that may handle a post accident sample shall as a minimum wear beta/gamma TLD's on their chest and on the inside of both wrists.

Additionally, a ring TLD shall be worn on both index fingers with the TLD faced inward.

4.2 ANTI-CONTAMINATION CLOTHING REQUIREMENTS Minimum clothing shall be determined by the OSC Health Physics Supervisor.

Any persons who will handle samples shall wear lineman's gloves, or heavy rubber gloves in addition to their other clothing.

4.3 GENERAL RADIOLOGICAL PRECAUTIONS

a.

Sampling with general area radiation levels in excess of 10 R/hr shall not be performed without the approval of the Site Emergency Director

  • eill82-002lal54

l NOTE:

.494

4.5 TITLE

PALIS~ES NUqLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR When conditions warrant, more conservative stay times may be appropriate.

Proc No El-7.1 Revision 9 Page 2 of 31

b.

Stay times for technicians performing post accident sampling shall be based on the formula:

Stay Time = RQ x 0.9.

DR Where:

"RQ" is the individuals remaining quarterly exposure and "DR" is the area's general. area dose rate.

The Radiation Safety Technician shall ensure that the Chemistry Technician reads his dosimeter frequently and does not exceed 90% of his remaining quarterly exposure.

Hand :handling :of.. samples' shall. be *minimized. -~*When *.samples must* be

handled,: a.: beta* radiation :.dose rate:*.reduction: can :be assumed for lineman's gloves *. Dose to,the extremities shall*be.*limited to 7.5R as measured by the ring* TLD pending a.**dose determination based on the beta/gamm~ TLDs.

Heavy rubber gloves may be substituted.

When not being handled, samples shall be stored in a shielded or remote location. All open samples should be handled in vent hoods.

4.6 If problems are encountered in,operating the PASM panel contact the

  • OSC Chemistry Supervisor prior to proceeding.

4.7 In all instances where flush or purge times equal or exceed 2 minutes, consideration should be given to moving to a lower dose rate area, when possible, depending on panel area dose rat.es.

4.8 CV-1910 and CV-1911 will close on a high containment radiation alarm or a high containment pressure alarm.

In order to sample through PASM, these valves must be opened through a special jumpering procedure (see EI-7.0, "Emergency Post Accident Sampling Decision Process", Attachment 1).

5.0 PROCEDURE 5.1 PRESAKPLE SURVEY 5.1.1 Suit Heal th Physics Technician( s) in anti-contaminat*ion clothing and wholebody dosimetry.

eill82-002lal54 I

I

~

  • PALISADES NUCLEAR. PLANT Proc No EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 3 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR 5.1.2

. Dispatch the HP technician( s) to Room 233 (PASM), NSSS room and th~

nitrogen bottle rack area to conduct initial radiation and *air sample surveys.

The technician(s) shall also survey the hall leading to and including the Hot Chem Lab, Counting Room and the Radwaste Lab.

The technician(s) shall return to the assembly area upon completion of the surveys.

5.1.3 Calculate the stay time in each area based on the results of the surveys in Step 5.1.2 using 4.3b *.

5.1.4 Report the results to the OSC Health Physics Supervisor. If the applicable areas are habitable, then dispatch two Chem Tech teams (two persons each).

One.team to the PASM Panel (Room 233), the other to the AriaLysis Station (eg*, Hot Chem Lab, High Level Count Room, Radwaste Lab and, as back up, Low Level Count Room)(including the

necessary. keys) *..The.PASM.. Panel.shall be.set.up per. the. applic~.ble.

~sections~of :~hi~~procedure as:determined by.the OSC*Chemistry

  • . /.Supervisor.*using EI-7.O, '.'Emergency* Post.Accident* Sampling Decis'ion

.*i..

.Process."

5.1.5 NOTE:

5.2.

A qualified Health Physics Technician shall accompany the Chemistry Technicians to the PASM Panel (Room 233) and a second Health Physics Technician should accompany the Chemistry Technicians* to the Analysis Station for monitoring during analysis.

a.

An air sampler shall be set up for continuous sampling during the Post Accident Sampling Process.

b.

Monitor the area in front of the sample panel during all sampling operations.

c.

Monitor all PASM samples for beta and gamma radiation.

Procedure Steps 5.2 through 5.8.3 may be perofme_d in' any order.

PASH PAREL PREPARATION A checklist in the right-hand margin is to be used by "checking" (/) each blank as that step is being performed.

A copy of this procedure can be obtained from the OSC Chemistry Supervisor-or-from the PASM Supply-Cabinet so that-the checklist can be implemented.

As one Chem.Tech is checking out the PASM Panel per this procedure, the other Chem Tech shall open up the PASM Supply Cabinet and PASM Analysis Cabinet.

/

eill82-002lal54 CHECK

TITLE:

PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE Proc Ho EI-7.*1 Revi'sion 9 Page 4.of 31 POST ACCIDENT SAMPLING -

PCS LIQUID/GAS' AND CONTAINMENT AIR r,;..

I *

  • CHECK 5.2.1 NOTE:

Grab Sample Panel (PCS) Setup and Evaluation

a.

Open two (2) n1trogen cylinder Isolation Valves in the Valve Gallery.

b~ Turn ventilation fan switch HS-1922 at the panel by the J-670, needle control panel, to "on".

c.

Verify nitrogen pressure at PI-1904 is 110 to 140 psig.

d.

Verify diluter reservoir greater than 50% full, if not, obtain demineralized water from Hot Lab and fill diluter.

e. Fill dilution inject syringe from diluter reservoir.

Verify that the 23 cc injection stop is in place.

-.f. **:*Place**.Containment 'Air* Heat: Trace.on* at EC-168.. panel.

  • ,Place.Containment :Air. Heat Trace HT-410.on at Panel B of
  • C-103-1.

Throughout this procedure, coordinates are given for component locations on the panel.

These coordinates should be read aloud if the individual manipulating valves cannot locate the component.

g.

To-ensure that rinse water has not collected in the sample loop:

1.

Place a beaker underneath the needle assembly in the cave *.

2.. At the needle Control Panel J-670, place Control Switch HS-1918 to the "LOWER CYLINDER" position.
3.

IF "CART ENGAGED" lamp does not light, position HS-1918 to "RAISE," THEN repeat Step 2.

4.

WHEN "CART ENGAGED" pilot light is lit, place HS-1918 to "INSERT NEEDLE" position.

Needle is in proper position when "NEEDLE INSERTED" pilot light is lit.

5.

Place Control Switch HS-1918 to the "HOME" position.

6.

Rotate MV-1907 (V-23) clock.wise to the 6 o'-clock position.

7.

Rotate MV-1926 (S-23) clockwise to _the 3 o'clock position, N2 flow.

B.

Purge for three (3) minutes.

9.

Rotate MV-1907 counterclockwise to the 12 o'clock position.

eill82-002lal54

I "

PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPLinlENTATION PROCEDURE Revision 9 Page 5 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

10.

Rotate MV-1926 counterclockwise to the 12 o'clock position.

11.

At the needle Control Panel (J-670), place the Control Switch HS-1918, to the "RAISE" position.

12.

When. the "CYLINDER CLEAR" pilot light (J-670) is lit, place switch HS-1918 to the "HOME" position.

13.

Remove the beaker from the cave.

h.

To ensure that the gas chromatograph coelescing filter is dry:

1.

At Panel B of C-103 Panel, place HS-1907 in the "OPEN" position *

.. 2.

. Verify.MV:-:1911 is :at 9.o.~.clock *

. 3. *. **.Rotate*: MV-1910.:counterclockwise *:(ccw)to. 6 :o '.cloc~.

4.

Wait 3 minutes *

5.

Rotate MV-1910 clockwise (cw) to 9 o'clock.

6.

Place HS-1907 (Panel B) to "CLOSED"

  • eill82-002lal54 CHECK

TITLE:

PALISADES NUCLEAR PLANT EMERGENCY IMPL.KHENTATIOH PROCEDURE Proc Ho EI-7.1 Revision 9 P.age 6*of 31 POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

. I..

CHECK lo Verify the following valves in the specified positions on the EC-103-1 Sample-Panel.

Valve Coordinates Position MV-1910 E-19 9 o'clock

. MV-1926 S-23 12 o'clock MV-1923 M-18 Closed MV-1924 0-18 Closed MV-1925 L-14 Closed PCV-1916 P-16 Closed MV-1909 R-14 Open MV-1921 M-16 Closed MV-1920 N-17 Open MV-1927 L-25 Closed

  • MV:-1913 G:-25 J o'.clock
  • .. MV-PCS109

.West.Wall in Open

\\

  • .Vacuum Degasi-fer Room MV-1907 V-23 6 o'clock MV-1911 H-17 9 o'clock MV-1905 E-15 9 o'clock
  • MV-1903 Q-20 Open MV-1904 L-20 Open MV-1938
  • 0-21 Closed MV-1906 E-13 9 o'Clock MV-1912 D-17 6 o'clock MV-1928 H-23 3 o'clock MV-1916 V-28 3 o'clock MV-1917 V-29 3 o'clock MV-1939 R-16 12 o'clock
j. For sampling during accident conditions or simulating operation with demin water, verify HS-1930, located at EC-167 panel, open for flow to the equipment drain tank.

For routine sampling, verify HS-1929 (located at EC-167 panel) open for flow to the VCT.

k.

Open MV-1949 (W-15).

Verify DMW pressure at PI-1905 (100-200 psig). If no pressure is observed, check open Demin Water Valve MV-PMW132 and MV-PMW122 located above Auxiliary Building stairwell door and on the south wall of the PASM Panel Roam* respectively.

ei1182-0021al54

I 5.2.2 PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPLF;MENTArION PROCEDURE Revision 9 Page 7 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

1.

To ensure that -rinse water has not collected in the needle assembly:

1.

Ensure HS-1918 is in "HOME" pos1t1on and that "CYLINDER CLEAR" lamp is lit.

2.

Rotate MV-1917 (V-29) CW to 6 o'clock.

3.

Wait three minutes.

4.

Rotate MV-1917 (V-29) CCW to 3 o'clock.

Sample Cask Preparation a~ Locate the following equipment in the Emergency Cabinet:

~l.

-~Hand'Speed~Wrench 2 *. Screwdriver 3

  • Inner Cask Lifting Device
4.

Tritium Vial with Septum

b.

Prepare two sample casks in a low level radiation area as follows:

1.

Loosen bolts on cask top shield.

2.

Lift cask top shield from cask and set aside.

3.

Loosen and remove screws from holding ring.

4.

Remove holding ring and gasket and set aside.

5.

Screw inner cask lifting device onto inner cask two turns.

6.

Lift inner cask out of sample cask

  • CHECK eill82-0021al54

5.2.3 NOTE:

PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE Proc No EI-7~1 Revision 9 Page 8 of 31 TITLE.:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS*

AND CONTAINMENT AIR

7.

Place tritium vial in cask as follows:

IF CASK FOR THEN THEN Undiluted Gas Evacuate Vial Follow Steps 9,10,12 Diluted Gas Evacuate Vial Follow Steps 9.10.12 Containment Air

, Evacuate Vial Follow Steps 9,10,12 Evacuate Vial, Diluted Liquid Place in Cask Follow Steos 8 through 12 Place Vial Undiluted Liquid in Cask Follow Steos 8 thru 12

. :8. _._:Reinstall :inner*.. cask:.in :*sample *cask *

. 9.

ReinstalL:gasket'.and :.holding ring *.

CHECK

r.
10. Reinstall screws in holding ring, tighten with screwdriver * *
11.

Remove inner cask lifting device from inner cask.

12.* Label cask diluted sample or undiluted sample.

Sample Cask Positioning

a.

Transport the sample cart to the PASM panel.

b.

Remove cask top shield.

c.

Roll the sample cart.into the PASM panel cave and center the cart against the stops.

d.

At needle control station J-670, place control switch HS...;1918 to the "lower cylinder" position.

Needle is in proper position for sampling, when "nnedle inserted" pilot light is on.

e.

When "cart engaged".pilot light is lit, move switch to "insert needle" position. If "car engaged" light does not light,' position HS-1918 to "raise," recenter the cart against the stops, then repeat Steps d and e.

ei1182-002lal54

5.2.4 5.2.5 PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 9 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

f. Place needle control switch HS-1918 to the "HOME" position.

Evacuation of PCS Liguid Sam2le Section

a.

Rotate MV-1926 (S-23) ccw to 6 o'clock.

b.

Rotate MV-1907 (V-23) ccw to 12 o'clock.

c.

Open MV-1906 (E-13).

d.

Evacuate the eductor to less than 2.0 psia, as indicated on PI-1903, Channel 2, at the EC-168 panel.

Verify PI-1903 is less than 2.0 psia.

e.

Close MV-1905 (E-15).

f. * :close MV-1906 :(E-13).
  • g. :Observe:.pressure.readout. on PI":"l903, Channel 2 for evidence of leakage, rate must be less than.0.10 psia rise in one minute. If leakage is excessive, contact the OSC Chemistry Supervisor.
h.

Close MV-1903 (Q-20).

1.

Close MV-1904 (L-20).

Evacuation of Pcs-offgas Section

a.

Place the 15cc evacuated vial in an offgas sample tong.

Use the sample tong labeled, "Rad-Gas Sample."

b.

Place the offgas sample tong in the guide tube marked "SN-1 11

  • Push the vial onto the needle and rotate the offgas sample tong into the locked position.
c.

Rotate MV-1912 (D-17) CW to 9 o'clock position for flow to MV-1905 (E-15)

d.

Open MV-1905 (E-15).

e.

Open MV-1906 (E-13).

f.

Rotate MV-1911 (H-17) CCW to 6 o'clock position

  • CHECK eill82-002lal54

PALISADES NUCLEAR PLANT EMERGENCY IMPL,EMENT.t\\TION PROCEDURE Proc. No EI-7.1 Revision 9 P~ge 10- of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

g.

Evacuate usi;..:c :i1e eductor to less than 2.0 psia as indicated ~

~£-1903, Channel 1 at the EC-168 Panel.

Verify PI-jJJ is < 2.0 psia IF PI-1903 Channel 1 is inoperable, THEN use Channel 2 according to the following steps:

1.

Rotate MV-1910{E-19 CCW to the 9 o'clock position.

2.

Verify PI-1903, Channel 2 is < 2.0 psia.

3.

Rotate MV-1910{E-19 CW to the 12 o'clock position.

h.

Rotate MV-1911 {H-17) CW to 9 o'clock position for flow to EV-lA {I-19).

  • .1 *. Close.MV-1905 :{E-15).
j.

Close MV-1906 {E-13).

k.

Check that no greater rise than 0.2 psia occurs on PI-1903, Channel 1.

{If the rise is greater than 0.2 psia, verify needle of SN-1 is secure and vial septum is secure.)

IF PI-1903 Channel 1 is inoperable, THEN use Channel 2 according to the following steps:

1.

Rotate MV-1910{E-19) CW to the 9 o'clock position.

2.

Verify PI-1903, Channel 2 indicates no greater rise than 0.2 psia.

3.

Rotate MV-1910{E-19) CW to the 12 o'clock position.

ei 1182-002lal54 CHECK

PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPL~ATION PROCEDURE Revision 9 Page 11 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

1. Rotate MV--1911 CCW to 6 o'clock position and check that there is no greater rise than 0.2 psia on PI-1903, Chaqnel 1.

IF PI-1903 Channel 1 is inoperable, THEN use Channel 2 according to the following steps:

1.

Rotate MV-1910(E-19) CCW to the 9 o'clock position.

2.

Verify there is no greater rise than 0.2 psia*on PI-1903, Channel 2.

3.

Rotate MV-1910(E-19) CW to the 12 o'clock position.

m.

Rotate MV-1912 CCW to the 6 o'clock position.

Si-.2.6 -*-containment-Air-Evacuation

a. -. Verify *.the *contairunent air heactracing.is On at EC-168.

(Temperature control TIS-1900 at EC-168 is set for 300°F

+/- 5°F. If the heat tracing fails to activate, a sample can still be collected.)

b.

Verify that containment air heat tracing, internal to EC-103-1 panel, is On at Panel B of EC-103-1.

c. Verify the following valves in the specified positions on the EC-103-1 Panel (containment air)

Valve Coordinates Position MV-1930 V-15 9 o'clock MV-1932 I-3 3 o'clock MV-1931 F-3 6 o'clock MV-1933

, F-2 3 o'clock MV-MGS200 F-7 3 o'clock MV-1934 H-7 6 o'clock MV-1943 H-14 9 o'clock

d.

Place the 15 cc evacuated vial with septum in a sample tong.~ -Us e-t-he--sampl-e-t-ong----1-a bel-ed-,-----'!Gont-ai-nment--Ai-r * "

e.

Place the sample tong in the guide tube marked "SN-2."

Push the vial onto the needle and rotate the sample tong into the locked position *

f.

Open MV-1906 (E-13).

ei1182-002lal54 CHECK -

5.2.7 PALISADES NUCLEAR PLANT EMERGENCY IMPiEMENTATIOH PROCEDURE Proc No EI-7.1 TITLE:

Revision '9 Page 12 of POST ACCIDENT SAMPLING - PCS LIQUID/GAS AND CONTAINMENT AIR

.1

31.
  • CHECK g.*

At "Panel 811 of EC-103-1, ensure lamp identified "SN-2 VAC OK" is lit. If light does not come on, contact the OSC Chemistry Supervisor.

\\

h.

Rotate MV-MGS-200 (F-7) CW to 6 o'clock position.

i. Close MV-1906 (E-13).
j. Observe "SN-2 VAC. OK" light. It should remain illuminated for a minimum of one minute. If iight does not remain lit, contact the OSd Che~istry Supervisor.
k.

Rotate MV-1934 (H-7) CW to 9 o'clock position.

PASM Setup and Evacuation Completion Hotif ication a *. * :.Notify :the.OSC.. *Chemistry:;Supervisor when *the.Grab :.Sample

.*Panel.(PCS.Liquid :and Gas' Sample).and :the Containment Air

-.Sample Panel. setups and.evacuations are complete.

b.

Notify the OSC Chemistry Supervisor when the preparation of the PASM Panel (PCS Liquid/Gas and Containment Air) and the analysis Stations (Hot Lab, High Level Count Room, Low Level Count Room, Radwaste Lab) are completed. If the sampling is not to begin immediately, the Chemistry Techs should move to a low dose rate area.

I

c.

OSC Chemistry Supervisor instructs to sample:

Time Check Sample

-Containment Air PCS Liquid/Gas*

d.

If sampling:

PCS Liquid/Gas Go to Step '5.2.8 Containment Air Go to Step 5.8 Sample PCS Liguid/Gas

a.

Analysis Required*

1.

pH, Chlorides - 4.0 mL of undiluted PCS liquid in 15 cc tritium vial contained in sa~ple cask.

eil182-002la154

NOTE:

NOTE:

PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 13 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS

, AND CONTAINMENT AIR

2.

Boron, Liquid Activity - 6 mL.of diluted (1322:1) PCS liquid in 10 cc shielded syringe, transferred to sample cask.

3.

Dissolved Hydrogen, Offgas Activity - 15 cc of diluted or undiluted PCS offgas in 15 cc serum vial, transported in sample tong placed in sample c_ask.

b *. Contact OSC Chemistry Supervisor to determine which sample stream ~o sample.

IF THEN Go to Ste 5.2.9

c...Request, :*thru. the.:osc.*Chemistry.,. to.. open.CV-1910. and cv...:.1911.

CV-1910 and CV-1911 are opened using Procedure EI-7.0, "Emergency Post Accident Sampling Decision Process", Attachment 2.

1.

Check open MV-PCSlOO, located behind NSSS panel EC-32 *.

2.

Check open MV~ESSlOO, located behind NSSS panel EC-32.

Completion of Steps 5.2.Bc.3 opens CV-1903.

3.

Position HS-1901 to position #3 (SX-1023), at NSSS panel E-32.

4.

Place HS-1901 solenoid in the "ON" position.

5.

Verify CV-1903 open, red valve position indicator light, at EC~l68 panel, lit

  • CHECK eill82-002la154

/

TITLE:

PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE Proc. No EI-7.i Revision 9 Page 14. of 31 POST ACCIDENT SAMPLING -

PCS LIQUID/GAS.

AND CONTAINMENT AIR

d.

At the EC-168 panel:

1.

Place SS-0211 to ON.

2.

Place HS-1912 to the "RC Sample" posi.ti.on.

The position indicator for CV-1912 should go from green to red.

3.

Verify HS-19'19 is in the "Auto" position. If not,.

place in "Auto" position.

4.

Place sample switch HS-1916 to "Sample" position.

Position indicator for sv~l916 should go from green to red *

. 5.

.PI;..1907 arid' 'PI-1908 :at. the.'PASM '.Panel. should <indicate

.. primary system* pressure. :If :no :pressure.is. indicated

  • On PI-1907and :PI-1908, verify system pressure on PI-1900.

If no pressure was indicated on PI-1907 and CHECK PI-'19.08, notify OSC Chemistry Supervisor.

Record PI-1907 psig ______ _

Record PI-1908 psig __ _

r

6.

Notify the OSC Chemistry Supervisor of the pressure*

readings from*PI-1907 and PI-1908.

IF THEN PI-1907 Pressure > 150 psi2 Go to Step 5.2.10 Contact OSC PI-1907 Pressure < 150 psi2 Chemistry Supervisor THEN I

Go to Step 5.2.9

- i ei1182-0021a154

5.2.9 NOTE:

PALISADES NUCLEAR PLANT Proc Ho EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 15 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR LPSI Sample Purge (Only)

PS-1903 indicator lamp on EC-168 must be lit to obtain a LPSI sample.

a. Verify the following are placed in the indicated positions:

CV-1903 CV-1910 CV-1911 MV-ESSlOO MV-PCSlOO HS-1912 HS-1916 HS-1919

.SS-0210 CLOSED CLOSED CLOSED OPEN OPEN.

OFF OFF AUTO

.ON

b. :Place' HS-1912 to *.the "LP.INJ".. position..The :position
  • indicator for. CY,-1913 should go :from green.to *red.
c. Place sample switch HS-1914 to "Sample" position. Position indicator for SV-1914 should go from green to red.

CHECK 5.2.10 Liquid Sample Purge IF THEN LPSI Sample Required Open PCV-1916 (P-16) continue to purge for 30 minutes PCS Hot Leg Sample Required Open PCV-1916 (P-16) until Flow Indicator FI-1912 reads 0.40 gal/min, continue to purge for 30 minutes

  • ei 1182-002lal54

.,I

TITLE:

PALISADES NUCLEAR PI.ART EMERGENCY IMPLEMENTATION PROCEDURE Pree No EI-7.l Revision 9 Page l~ of 31 POST ACCIDENT SAMPLING -

PCS LIQUID/GAS*

AND CONTAINMENT AIR CHECK 5.3 OPERATION OF INLINE INSTRUMENTS; pH, DISSOLVED OXYGEN 5.3.1

-a*

Ensure that the following sections have been completed before continuing with this Section:

5.2.1, 5.2.2, 5.2.3, 5.2.4, 5.2.5, 5.2.6, 5.2.7, 5.2.8 and 5.2.9 (LPSI sample purge only).

b.

Turn PCV-1916 (P-16) clockwise (cw) until the flow indicator FI-1912 reads 0.05 gal/min.

c.

Open MV-1924 (0-18).

d.

Open MV-1923 (M-18).

e.

Close MV-1920 (N-11) *

. f.. If::MV-1939.is :.aligned* for: flow.: to. the* pH: and **conductivity

inline instruments,do:not overpressurize PI-1909.greater
  • than 40 psi. -_.Should.pressure.exceed -40.psi, *turn PCV-1916 clockwise (cw) to reduce pressure.

Notify Chemistry Supe~visor of this action.

g.

Rotate MV-1939 (R-16) counterclockwise (ccw) to 6 O'clock

  • for flow to the inline instruments.
h.

At.the C-167 Panel, place the 29022 Orbisphere Dissolved Oxygen Analyzer to the "ON" position.

1.

At the C-167 Panel, place Leeds and Northrup pHIT 1902 in the "READ" position by pushing in the standardization knob.

Ensure proper operation by verifying standardization setting using the standardization data in the Hot Lab.

j. At the J-673 Panel (Hot Chemistry Lab), place pHR 1902 and OXR1900 to "ON".

Capturing the Pressurized Liquid Sampe in SF-1 The collection of the sample should be a team effort.

One Chem Tech should operate the PASM Panel valves and controls, while the other Chem Tech reads aloud the procedural instructions and also conducts the EC-168 panel duties.

The HP Tech shall survey the work of the Chem Techs with the applicable radiation monitoring equipment including the relative activities of each sample collected.

This information should be recorded as it will prove useful in sample handling and analysis.

ei llS2-002la:l54

5.3.2 PALISADES NUCLEAR PI.ABT Proc No EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 17 of 31 TITLE:

POST ACCIDENT SAMP.LING -

PCS LIQUID/GAS AND CONTAINMENT AIR Chem Tech at the PASM Panel

a.

Turn PCV-1916 (P-16) CW until the flow indicator reads 0.05 gal/min.

If MV-1939 is aligned for flow to the pH and conductivity in-line instruments, do not overpressurize PI~l909 greater than 40 psig.

Should pressure exceed 40 psig, turn PCV-1916 CW to reduce pressure, notify Chemistry Supervisor of this action.

b.

Open MV-1924 (0-18).

c ** Open MV-1923 (M-18).

d.

Close the bypass valve MV-1920 (N-17), check FI-1912 for a flow of.05 gal/min.

Adjust PCV-1916 (P-16) as necessary to,: get: 0~05 ;gal/min.on.F.I:-:1912 *

. e. 'Wait:five.:minutes.

f.

Record pHIT 1902 and Orbisphere 29022 readings.

g.

At the C-167 Panel, place pHIT' 1902 to standby.

h.

At the C-167 Panel, place the Orbisphere 29022 Analyzer to "OFF".

i. Close MV-1923 (M-18).
j. Wait approximately 30 seconds.
k.

Close MV-1924 (0-18).

1.

Record time MV-1924 closed as sample time.

Sample Time

m.

Record sample temperature from TI-1902 (PCS sample) or TI-1903 (LPSI sample) on EC-168 panel.

Sample Temperature

n.

Notfy the Hot Lab Analysis Team to place pHIR 1902 and OXR1900 to "OFF."

CHECK eill82-002lal54

I PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENTATION PROCEDURE Proc No EJ-7.1 Revision 9 P.age 18 of 31..

f

5.3.3 TITLE

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR*

Chem Tech at the EC-168 Panel

a.

Place HS-1916 (or HS-1914 if using LPSI) to "OFF".

The SV-1916 pilot light should go from red to green. If a LPSI sample was used, the SV-1914 pilot light should go from red to green.

b.

For a PCS sample only:

Request," through the OSC Chemistry Supervisor, CV-1910 and CV-1911 be shut by the Control Room Operator.

The red valve position indicators for CV-1910 and CV-1911 will not be lit when CV-1910 and CV-1911 are closed.

NOTE:

CV-1903 is left open after sampling to reduce unneccessary

  • *.radiation.. doses.

c~V-1910

~losed CV~l911 Closed 5.3.4 PASM Liquid Sample Section Flush (DI Water)

a.

Carefully crack open MV-1921 (N-16).

As the system pressure bleeds off, as indicated by PI-1907 or PI~l908, open MV-1921 (N-16) fully.

b.

When PI-1907 and PI-1909 indicate zero (0) pressure, close MV-1909 (R-14).

c.

Open MV-1925 (L-14).

d.

Open PCV-1916 (P-16) until flowmeter (FI-1912) reads 0.12 gpm to 0.22 gpm.

e.

Wait approximately two minutes.

f.

IF THEN THEN Move HS-1914 SV-1915 light LPSI Samole Taken to Flush goes from green Move HS'-1916 SV-1917 light PCS Sample Taken to Flush goes from green eill82-002lal54 to red to red CHECK

PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 19 of 31 TIT:OE0:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR CHECK

g.

Close MV-1921 (N-16).

h.

Open MV-1909* (R-14)

i. Wait approximately two minutes.
j.

IF THEN LPSI Samole Taken Place HS-1914 to OFF PCS Samole Taken Place HS-1916 to OFF

k.

Place control switch HS-1912 (EC-168) in off position.

  • 1. *:Verify*: nGreen"**.condi tion*. for:
    • SV-1916
sv-1911 CV-1912 CV-1913 SV-1914 SV-1915
m.

Close MV-1925 (L-14).

n.

Close MV-1909 (R-14).

5 *. 4 PCS OFFGAS -

(Hz ABD ACTIVITY)

If an undiluted liquid sample is required, go to Step 5.4.2.

5.4.1 Diluted Offgas Sample Acquisition

a.

Verify MV-1911 (H-17) is in the 9 o'clock position.

b. -~=ri_fy_ _M_V_-19~2 C~=:_l ?} __ i_s -~~- ~~~ _?_o~~-~-~ck __ P~~1:_t_~~l1~--... --------~- ___ _
c.

Open MV-1904 (L-20) "slowly", record pressure of sample from PI-1903 Channel 2 READING: psia __ _

eill82-002lal54

PALISADES NUCLEAR PLANT Proc No EI-7.l EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 2Q of 31 TITT~E:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS*

AND CONTAINMENT AIR

d.

Open MV-1938 (P-20) "slowly", record pressure of sample plus nitrogen from PI-1903 Channel 2 (it should be approximately 25-30 psia).

READING: psia

e. After pressure reading on PI-1903 Channel 2 stabilizes, close MV-1938 (P-20).
f.

Close MV-1904 (1~20) g*

Position HS-1926 (Panel B of C-103 Panel) to "OFF GAS".

h.

At the C-167 Panel, depress "MANUAL" button and enter Code 1123 11 to initiate the GC evacuation.

i *. Observe vacuum indicator, the light should switch from

'!LOW".. to '.'HIGH".. and_ enter. Code '!2411. to, terminate.educ tor

. :operation.

,j. :Rotate MV.;..1910 *clockwise.(cw) :to..

  • the.12:o 1 clock. position.
k.

At the C-167 Panel, depress the GC "MANUAL" button and select an attentuation of 5 x 1.

m.

Depres~ the "AUTO" button.

n.

Press the "SAMPLE" button, release the button.after the "LOW VACUUM" light is lit. Place GC Recorder 1920 chart speed to 120 cm/hr.

o.

Press and release the "CLEAR" button to initiate the analysis.

The chromatogram will be complete in

  • approximately 3 minutes.

'p.

While the chromatogram is running, rotate MV-1910 counterclockwise to the 9 o '.clock position.

q.

After the chromatogram is complete, place GCR 1920 chart speed to the "OFF" position. *

r.

Depress* "AUTO" button, then press "CLEAR" button to.secure GC 1~20.

s.

Rotate MV-1911 (H-17) CCW ~o the 6 o'clock positibn.

t.

Rotate MV-1912 (D-17) CCW to the 3 o'clock position for approximately five seconds, then returri it back CW to the 6 o'clock position.

Reco~d pressure on PI-1903 Channel 1.

ei 1182-002.~

CHECK I

5.4.2 PALISADES NUCLEAR PLANT Pree No EI-7.1 EMERGEHCY IMPLEMENTATION PROCEDURE Revision 9 Page 21 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

u.

Upon removing the sample tong and prior to placing in the cask, the HP Technician should attempt to get a radiation reading of the sample and record it. This will later be used for determining dilutions for analysis.

Radiation level mRem/hr

v.

Rotate MV-1911 (H-17) CW to the 9 o'clock position

w.

Remove the offgas "Diluted" sample tong from SN-1 (J-17) and place it in.the sample cask (inner cask must be removed first) for transport to the analysis station.

x.

Analyze the "Diluted" gas sample for radioactivity per EI-7.2, "Emergency Post ~ccident Analysis." If the

.. radioactivity.. of*.the. diluted sample is,.undetectable,.then

.notify.*,osc*:Chemistry.. Supervisor:*of. results :and.. await

further* instructions.

Undiluted Offgas Sample Acquisition Do not use this sample for analysis while under accident conditions unless authorized by the OSC Chemistry Supervisor.

a. Verify MV-1911 (H-17) is in the 6 o'clock position.

b*~

Verify MV-1912 (D-17) is in the 6 o'clock position.

c.

Slowly open MV-1904 (L~20) and record the pressure from PI-1903, Channel 2.

READING: psia

d.

Slowly open MV-1938 (P-20) and record the pressure from CHECK PI-f903, Channel 2.

READING: psia ___ _

e. Close MV-1938 (P-20) after pressure, as indicated by PI-1903, Channel 2, stabilizes.
f.

Close MV-1904 (L-20).

  • . ~-*

__ *- __ *- g~--~~i_tj.~~ __ HS-19~~-(I>_~n~~--~- of -~:!_Q~ __ P~f!el2__~9 -~'Qf_F_ GAS~~---------- ____________ _

h.

At the C-167 Panel, depress "MANUAL" button and enter Code "23" to-initiate the GC evacuation.

i. Observe vacuum indicator, the light should switch from "LOW" to "HIGH".

Enter Code 1124" to terminate eductor operation.

ei 1182-002lal 54

I TITLE:

PALISADES NUCLEAR PLANT EMERGENCY IMPLEMENT~TION PROCEDURE Proc. No EI-7.l Revision 9 Page 21 of 31 POST ACCIDENT SAMPLING -

PCS LIQUID/GAS.,

AND CONTAINMENT AIR

\\

CHECK

j. Rotate MV-1910 clockwise (cw) to the 12 o'clock position.
k.

At the C-167 Panel, place the GC Recorder 1920 chart speed to LZO cm/hr.

1.

At the C-167 Panel, depress the GC "MANUAL" button and select an attenuation of 5 x 1.

m.

Depress the "AUTO" button.

n.

Press the "SAMPLE" button, release the button after the "LOW VACUUM" light is lit.

o.

Press and release the "CLEAR" button to initiate the

  • .analysis *... *The.:.chromatogram.will.be.complete :in

. : approximately. 3 :.minutes.

p. **While *chromatogram is running, **rotate MV-1910 counterclockwise (ccw) to the 9 o'clock position.
q.

After the chromatogram is copmlete, place the GCR 1920 chart speed to the "OFF" position.

r.

Depress "AUTO" button, then press "CLEAR" button to secure GC 1920*

s.

Rotate MV-1912 (D-17) CCW to the 12 o'clock position.

t. Record pressure from PI-1903, Channel 2.

READING ps1a

u.

Rotate MV-1912 (D-17) CCW to the 6 o'clock position.

v.

Rotate MV-1911 (H-11) CW to the 9 o'clock position.

w.

Upon removing the sample tong and prior to placing in the cask, the HP Tech should get a radiation reading of the sample and record it. This will later be used for determining dilutions for analysis.

Radiation Reading:

J

x.

Remove the "Undiluted" offgas sample tong from SN-1 (J-17) and place the sample in the cask for transport to the analysis station.

y.

Analyze the "Undiluted" sample for dissolved hydrogen and radioactivity per EI-7.2, "Emergency Post Accident Analysis."

eill82-002lal54

PALISADES NUCLEAR PLANT Proc Ho EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 23 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

.z.

Prepare the sample cask for diluted liquid sample, see 5.2.2.b.7.

5.5 DILUTED LIQUID SAMPLE (BORON AND ACTIVITY) ACQUISITION Verify the sample cask labled diluted sample is prepared and in position near MC-1 prior to starting this procedural section.

a.

Verify that MV-1913 (G-26) is in the 3 o'clock position.

b.

Verify MV-1926 (S-23) is in the 6 o'clock position.

c. Verify MV-1907 at 12 o'clock position.
d.

Verify MV-1911 at 9 o'clock position *

.. e *. Rotate.MV-.1910 CCW.to.6 *.o!clock*-.. position *.

£. *.Open MV-1904 (L-20).

g.

Open MV-1903 (Q-20) *

h.

Wait two minutes.

i. Rotate MV-1928 (H-23) CW to the 6 o'clock position.
j. Rotate MV~l913 (G-26) CW to the 6 o'clock position.
k.

Inject 23cc of demineralized water from the syringe on diluter assembly DA-1 into MCl by pushing down on plunger until it stops against the injection stop.

1.

Rotate MV-1913 (G-26) CCW to the 3 o'clock position.

m.

Open MV-1902 at MC-1 (L-26).

n.

Remove shield from aliquoter needle and insert aliquoter needle through MV-1902 at MC-1.

o.

Retract and dispense the plunger twice to mix the sample within MC-1.

p.

Retract and lock plunger to extract the diluted-sample from MC-1.

q.

Withdraw the aliquoter from MC-1 and inject the sample into the vial in the sample cask labeled diluted sample.

ei 1182-002la154 CHECK

-~--

r PALISADES NUCLEAR PLANT EMERGENCY IMP~EMENT~TION PROCEDURE Proc, No EI-7.1 Revision 9

~age 24 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

r. Place shield cover over cask opening and bolt in place.
s. Close MV-1902 at MC-1 (L-26).
t. Rotate MV-1928 (H-23) CCW to the 3 o'clock position.
u.

Transport the sample in the sample cask to the analysis station.

Analyze the sample for.PCS Liquid Radioactivity and Boron per Reference 3.3, EI-7.2, "Emergency Post Accident Analysis."

CHECK

v.

Prepare sample cask for containment air if requested by OCS Chemistry Supervisor, see 5.2.2.b.7.

5.6 UNDILUTED LIQUID SAMPLE (pH AND CHLORIDES)

.. a. Verify *.the,sample.cask :is :.in.position in the.. cave and.that pilot.. lights ~

11 CART... ENGAGED".. and. "NEEDLE 'INSERTED" of

Needle Control Panel (I-670) are lit,.prior.to.sta~ting
  • this procedural section.
b.

Verify MV-1910 (E-19) is in the 6 o'clock position. If not, rotate CCW to 6 o'clock.

c. Verify MV-1904 (L-20) is open, if not, open.
d.

Verify MV-1903 (Q-20) is open, if not, open.

e. Verify that MV-1913 (G-26) is in the 3 o'clock position.
f.

Verify MV-1926 (S-23) at 6 o'clock position.

g.

Verify MV-1907 (V-23) at 12 o'clock position.

h.

Close MV-1903 (Q-20).

i. Close MV-1904 (L-20).

J*

Rotate MV-1910 (V-23) CW to 9 o'clock position.

k.

Rotate MV-1907 (V-23) CW to 6 o'clock position.

1.

Rotate MV-1926 (S-23) CCW to the 3 o'clock position for one minute, then rotate MV-1926 (S-23) CW to 6 o'clock position.

m.

Rotate MV-1907 (V-23) CCW to the 12 o'clock position.

n.

Rotate MV-1926 (S-23) CW to 12 o'clock.

ei 1182-0021al54


=*

l 5.7 5.7.1 PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPLEMENTATION PROCEDURE Revision 9 Page 25 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

o.

On the needle control panel (J-670), place the control switch HS-1918, to "Raise" position.

p.

When the "Cylinder Clear" pilot light (J-670) comes on, place switch HS-1918 t.o "Home" position.

\\

q.

The HP Tech should get radiation reading of the sample prior to placing the shield cover in place.

This should be recorded and reported to the OSC Chemistry Supervisor prior to performing any analyses.

READING:

r. While one Chem Tech pulls the cask from the cave, the other should place the shield cover over the opening and bolt in place with the hand speed wrench *

.. s. *.Insert... the*.,needle *plug in.:the.:cover. *~Transport :.the.sample

.cask to.the.:.analysis.*station.* *.Analyze.. the *sample for pH and. chlorides.in.:*accordance. with :EI-17.~2, "Emergency.Post
  • *Accident *Analysis."

POST SAMPLE FLUSH Cask Needle and Sample Flask Flush

a.

Verify MV-1904 (L-20) closed.

b.

Verify MV-1903 (Q-20) closed.

c.

Open MV-1923 (M-18).

d.

Open MV-1924 (0-18).

e.

Open MV-1925 (L-14).

f.

Adjust PCV-1916 (P-16) to obtain a flow of 0.12 gpm to 0.22 gpm.

g.

Wait two minutes.

h.

Close MV-1925 (L-14).

. CHECK

  • .*~

---~----- ---*-----

1.

Close MV-1923 (M-18).

J.

Close MV-1924 (0-18).

k

  • OpelJ. MV-1903 (Q-20).
1.

Open MV-1904 (L-20).

eill82-002lal54

l PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPL~ATION PROCEDURE Revision 9 P~ge 26' of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR CHECK

m.

Rotate MV-1910 (E-19) CCW to 6 o'clock position.

n.

Wait 5 minutes.

o.

Rotate MV-1910 (E-19) CW to 9 o'clock position.

P*

Open MV-1905 (E-15).

q.

Rotate MV-1907 (V-23) cw to 6 o'clock position.

r.

Close MV-1903 (Q-20).

s. Open MV-1917 (V-29).
t. Wait three minutes.

u *. :*Rotate.':MV-1926 :ccw.to 6*.o.'.clock.

v. *Close* MV-1917 (V-29).
w.

Close MV-1904 (L-20).

x.

Close PCV~l916 (P-16).

y.

Rotate MV-1907 (V-23) CCW to 12 o'clock position.

5.7.2 KC-1 FLUSH

a.

Open MV-1927 (L-26)

b.

Rotate MV-1928 (H~23) CCW to the 12 o'clock position.

c.

Wait approximately one minute.

d.

Rotate MV-1928 (H-23) CCW to the 9 o'clock position.

e.

Wait approximately two minutes.,

£.

Rotate MV-1928 (H-23) CCW to the 3 o'clock position.

g.

Close MV-1927 (L-26).

ei1182-002lal54

5.7.3 PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPLEMENTA1ION PROCEDURE Revision 9 Page 27 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR CHECK N2 PURGE To Gas Chromatograph Coelescing Filter

a.

At Panel B of C-103 Panel, place HS-1907 to open.

b *.Verify MV-1911 is at 9 o'clock.

c.

Rotate MV-1910 counterclockwise (ccw) to 6 o'clock.

d.

Wait 3 minutes.

e.

Rotate MV-1910 clockwise (cw) to 9 o'clock.

f.

Place HS-1907 (Panel 8) to closed.

5.8 CONTAINMENT AIR SAMPLE (DILUTED) 5.8.1 NOTE:

a *. *.Samples/Analyses :Needed:

1.

Inline *analysis

2.

Grab sample analysis (samples to be analyzed in designated analysis station)

b.

Parameters Containment Air Activity, % Hydrogen, % Oxygen - 15cc of diluted containment air in 15cc serum vial, transported in sample tong placed in sample cask.

Sample Purge

a.

Request, thru the OSC Chemistry, to the Control Room to open SV-2412A, SV-24128, SV-2414A, and SV-24148.

Verify PL-1918 (red) lamp is lit at the EC-168 panel.

In the event of loss of offsite power PL~l918, PL-1919 and PL-1920 valve position indicators will not operate.

b.

Verify that SV-2424A and SV-24248 are open by observing PL-1920 (red) being lit. If not lit, obtain key from the PASM Emergency Cabinet Key holder and operate KS-2424 at EC-168 to the open position

  • ei 1182-002la154

l 5.8~2 v,,

PALISADES NUCLEAR PLANT EMERGENCY IMP~EMEHTA,.TION PROCEDURE Proc. No EI-7.1 Revision 9 P,\\lge 2& of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

c.

Purge Sample Lines

1.

Ensure HS-1926 (Panel B) to "OFF GAS" position.

2.

Ensure MV-1934 (H-7) positioned to 9 o'clock.

3.

Open MV-1930 (V-15)

4.

Open MV-1931 (F-3).

5.

Rotate MV-1932 (I-3) CW to the 3 o'clock position

6.

Record the containment pressure from PI-1906 at EC-168

7. *: Induce:.sample =flow~by:* opening. MV"".'1933.(F-:-2)

I'

  • 8.

Verify the :purge flow.is.approximately 5.8 SLPM as indicated on FI-1927.

9.

Purge for approximately five minutes.

10.

Place HS-1926 (Panel B) to "CONT AIR".

11.

Rotate MV-1934 counterclockwise (ccw) to the 6 o'clock position.

12.

Purge to GC for 3 minutes.

GC Sample Collection and Analysis

a.

At the C-167 Panel, depress "MANUAL" button and enter

  • Code "23 11 to GC 1920, to evacuate the sample loop.

"HIGH" vacuum light should light.

b.

Enter Code 112411 after "HIGH" vacuum is obtained.

c.

Depress "SAMPLE" button to fill GC sample loop.

d.

Release "SAMPLE" button after "LOW" vacuum light is lit.

e.

Place GCR 1920 chart speed to 120 cm/hr *

f.

Depress "MANUAL" button, select attenuation of 5 x 1, and then depress "AUTO" button.

g.

Press "CLEAR" button to start chromatogram.

CHECK ps1a ei1182-002lal54

5.8.3 PALISADES NUCLEAR PLANT Proc No. EI-7.1

. EMERGENCY IMPLF;MENTATION PROCEDURE Revision 9 Page 29 of 31 TITLE:

POST ACCIDENT SAMPLING -

PCS LIQUID/GAS AND CONTAINMENT AIR

h.

After chromatogram is complete, place GCR i920 to "off".

i..

Depress "AUTO" button then depress "CLEAR" button to secure GC 1920.

Grab Sample Collection

a.

Isolate the sample

1.

Close MV-1931 (F-3).

2.

Close MV-1933 (F-2).

3.

Rotate MV-1932 (I-3) CCW to the 12 o'clock position *

.. 4. * *Record*:the::pressure. of.the ~sample*:from-.PI-:-1906 _(at CHECK*

EC-168).

psia __ _

Record Heat"Trace Temp *from TIS-1900 (at the EC"".'168 panel).

b.

Collect the sample If gas chromatograph sample has been taken in Step 5.8.2, skip Step 1.

1.

Rotate MV-1934 (H-7) CCW to the 6 o'clock position.

2.

Rotate MV-MGS200 (F-7) CCW to 9 o'clock position.

3.

Wait five seconds.

4.

Rotate MV-1934 (H-7) CW to the 9 o'clock position.

5.

Rotate MV-MGS200 CCW to the 3 o'clock position.

6.

Ensure "SN-2 VAC OK" lamp is not lit.

7.

Remove the SN-2 sample tong (Containment Ai~)

containing the diluted (870:1) containment air sample Temp ___ _

-~- ________________.. _ --~-~~ __ pJace_ i,_11_ _a _ _mQbile_s_ampLe __ cask _with __ the_inner -------

liner removed.

Transport to the analysis station

  • eill82-002lal54

r 5.8.4 NOTE:

PALISADES NUCLEAR PLANT EMERGENCY IMPL.EMENTATION PROCEDURE Proc-No EI-7.1 Revision 9 P~ge 3& of 31

/.

ar;'

POST ACCIDENT SAMPLING -.PCS LIQUID/GAS AND CONTAINMENT AIR TITLE:

c.

Sample line backflush

1.

Open MV-1931 (F-3).

2.

Open MV-1933 (F-2).

3.

Wait five minutes.

4.

Close MV-1931 (F-3).

5.

Close MV-1930 (V-15).

6.

Rotate MV-1932 (I-3) CW to the 3 o'clock position.

7.

Wait five minutes *

. 8.

Close:MV-1933. (F-2).*
9.

Rotate*MV-1932 (I-3) CCW *to the 12*o'clock position.

d.

Standby mode Place the system to standby by rotating SV-2424A, SV-24248 to the closed position.

PL-1920 red light should be OFF.

PASM Shutdown

a.

Close N2 cylinder valves.

When N2 pressure is less than 90 psig, an alarm at EC-168 panel will come on.

b.

Bleed off N2 pressure by opening eductor MV-1906 (E-13) until PI-1904 reads 0 psig.

Silence Low Nitrogen Pressure alarm at EC-168 panel *

. c.

Close MV-1949 (W-15) demin water inlet valve.

d. Close HS-1929 and HS-1930.
e.

Notify the OSC Chemistry Supervisor that sampling is complete and return to your assembly area unless instructed otherwise.

f.

The OSC Chemistry Supervisor shall notify the TSC Chemistry Team Leader that sampling is complete.

CHECK ei1182-002la154

I.

~. "'

\\*

~j PALISADES NUCLEAR PLANT Proc No EI-7.1 EMERGENCY IMPI$,MENTATION PROCEDURE Revision 9 Page 31 of 31 TITLE:

POST ACCIDENT S~LING - PCS LIQUID/GAS AND CONTAINMENT AI~

CHECK 6.0 ATI'ACHMENTS None

~ill82-002la154