ML18052A742

From kanterella
Jump to navigation Jump to search
Forwards Revised Application for Amend to License DPR-20, Changing Tech Specs to Reflect Proposed Installation of New Spent Fuel Pool Storage Racks
ML18052A742
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/16/1986
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18052A743 List:
References
NUDOCS 8610270099
Download: ML18052A742 (2)


Text

I

'I

~

consumers Power Kenneth W Berry Director POWERiNii Nuclear licensing lllllCHlliAN'S PROGRESS General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-1636 October 16, 1986 Director, Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555

  • DOCKET.... 50'-255

~ ~ - - LICENSE DPR PALISADES - - PLANT -

EXPANSION "OF 'SPENT=-EUEL -P-OOL STORAGE CAPACITY -

TECHNICAL SPECIFICATION CHANGE . REQUEST -* REVISION 1 Consumers Power Company letter dated February 20, 1986 submitted the Technical Specification Change Request and supporting Safety Analysis Report (SAR) associa.ted with the proposed installation of new spent fuel pool storage racks in approximately one-half of the Palisades Plant spent fuel pool. At the time of that submittal,- the analyses referred to in the SAR were incomplete.

Consumers Power Company letter dated.April 16, 1986 provided confirmation that the analyses had been completed and the conclusions given in the SAR, with_ the exception of those for the pool structure, are valid. Additionally, it reported the results of analyses that showed that no modifications to the Region I racks are necessary. It also provided revised pages containing tables, figures and descriptions which were either incomplete or edito.rially incorrect in the February 20, 1986 submittal. Consumers Power Company letter dated April 24, 1986 confirmed that analysis of the Spent Fuel Pool structure was complete and that conclusions given in the SAR regarding the Spent Fuel Pool structure are valid.

NRC letter dated April 25, 1986 transmitted a request for additional information regarding the expansion of the spent fuel pool storage capacity.

Requests for additional information were also received during discussion with the Palisades Plant NRC Project Manager. The additional information requested by letter and during discussion was provided by Consumers Power Company letter dated July 24, 1986 which also informed the Staff that Consumers Power Company would revise the Technical Specification Change Request and supporting SAR.

Additionally, the'July 24, 1986 Consumers Power letter informed the staff that submittal of the revised Technical Specification Change Request a-nd supporting SAR, together with the information contained in that letter would be considered as submitted in lieu of the Summary Reports described in the Consumers Power Company lette.r dated April 24, 1986.

OC0886-0129-NL04

  • . 8610270699 861016~~.

PDR*~ ADOCK.05000255.

P' .

  • w--.f.

~

  • PDR~

.,__~

Director, Nuclear Reactor Regulation Palisades Plant Rev 1 - TSCR Spent Fuel Pool Capacity

  • 2 October 16, 1986 Attachment I to this letter contains the revised (Revision 1) description of the proposed Technical Specification Changes and analysis which determines that this installation and license amendment involve no significant hazards.

Attachment II contains the revised Technical Specification Change. Attachment III contains Revision 1 of the supporting SAR. The completed detailed analyses referred to in the SAR are available for review. Changes from the original February 20, 1986 submittal and from the revised pages included with our April 16, 1986 submittal are summarized as follows:

1. References to results of analyses are stated in the past tense and refer to theresults of completed analyses.
2. Information provided by the completed Thermo-Hydraulic Analysis has

~*

been incorporated into Section 3 of the SAR *

3. The maximum initial U-235 loading of the fuel is stated in w/o.*
4. The effect of 1,720 ppm boron in the pool water has been conservatively stated as 25 percent fi.K.

Changes made to the SAR by our letter dated April 16, 1986 have been included in the attached Revision 1. Therefore, the changes indicated by a vertical line in the right. margin include those made at that time.

After approval, the specification changes requested in this Technical Specification Change Request will become effective when the installation of the new racks commences.

This letter supersedes and withdraws the May 11, 1981 Consumers Power Company letter entitled Technical Specification Change Request - Fuel Storage.

A check for $150.00 as required by 10CFR170.21 was included with Revision 0 which was submitted on February 20, 1986.

~:s~~