consumers Power company General Offices: 1945 West Parnell Raad, Jackson, Ml 49201 * {517) 7Sa-0550 February 8, 1984 De~nis M Crutchfield, Chief Operating Reactor Branch.No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT -
ENVIRONMENTAL PROTECTION PLAN INFORMAT~ON Consumers Power Companys application for a full term operating license for the Palisades Plant is presently being reviewed by the NRC staff.
A conference call January 25, 1984 with NRC reviewers resulted in a commitment by Consumers Power Company to provide additional information regarding the Environmental Protection Plan for Palisades.
This information consists of copies of correspondence between Consumers Power Company (CP Co) and the Michigan Department of Natural Resources (MDNR).
A lis.t and description of the enclosed copies follows:
Cooling Water Modification
- 1.
May 18, 1979 letter from P C Hittle by R L Fobes (CP Co) to Karl Zollner (MDNR) advised of cooling water modification and requ~sted NPDES permit modification to address modified plant operations.
- i.
May 4, 1981 letter from R J Courchaine (MDNR) to R L Fobes (CP Co) concurring with the "inuhedi~te_ commencement of operation of the modified cooling system."
NPDES Permit
- 1.
March 31, 1980 letter from P C Hittle by R L Fobes (CP Co) to Karl Zollner (MDNR) submitted application for a renewed NPDES permit.
- 2.
May 20, 19ao letter from R L,Fobes (CP Co) to Karl Zollner *(MDNR) submitted revised Exhibit IA to March 31, 1980 original application.
Thermal P'lume Study
- 1.
October 25, 1979 letter from P C Hittle by R L Fobes (CP Co) to R J Courchaine (MDNR) submitted thermal plume study proposal.
- 2.
November 27, 1979 letter from R J Cou.rchaine by F J Horvath (MDNR) to P C Hittle (CP Co) provided agency approval of thermal plume study propos~.1_.
OCO 284-000 6AA-NLO 2 r".
-;;8"'40~2;-;-1---;;;4-;;:0---;;;4-;-67 1---:. 8;;;-40=2;;;;-:oe=-==----:-,-* _---,,--;----...
_.. PDR ADOCK,.05000255 p '
~ '
.pDff
r-DMCrutchfield, Chief Palisades Plant ENVIRONMENTAL PROTECTION PLAN INFO February 8, 1984 Thermal Plume Study (Continued) 2
- 3.
March 11, 1981 letter from R L Fobes (CP Co) to R E Basch (MDNR).
confirmed staff's verbal concurrence to proceed with spring and summer thermal surveys and to review the findings of the two surveys before determining if a fall' survey would be required.
- 4.
- January 25, 1982 letter from P C Hittle by J A Gulvas (CP Co) to R J Courchaine (MDNR) submitted final report on spring and summer thermal plume surveys and recommended a fall survey not be conduct-ed.
- 5.
June 21; 1982 letter from R J Courchaine (MDNR) to P C Hittle (CP Co) concurred with Company request to delete fall thermal survey and determined that this-requirement of the plant's permit was satisfied and "that the discharge complies with temperature related requirements of.the Michigan water quality standar~s."
Chlorine Minimization Report The Chlorine Minimization Report will be sent to the NRC by mid March 1984.
- Aerial.. Photograph The numbered areas on the photo are identified as follows:
- 1.
Areas impacted as a result of cooling tower drift.
- 2.
Area.cleared and excavated for new septic drain field.
3.-
Areas cleared and excavated for additional parking.
- 4.
Area filled with excess and from new parking area.
- 5.
Areas cleared and excavated for construction of warehouse and storage.
- 6.
Trail, instrument shelter and meteorological tower.
- 7.
Area cleared and excavated for new (additional) access road.
Brian D Johnson Staff Licensing Engineer CC Administrator, Region III, USNRC
.NRC Resident Inspector - Palisades Attachments OC0284-0006AA-NL02